QUESTIONS
ANSWERED (BE
SPECIFIC)
CAMPUS: <<Insert campus or distance>>
TUTOR: <<Insert tutor name>>
TUTORIAL NUMBER: <<Insert the tutorial number>>
Assignment 2 PPMP20008 (T2 – 2019) V5
INFORMATION PAGE
[Students to complete]
PROJECT NAME: CQU EDUCATIONAL HUBS
FOR INDIGENOUS STUDIES
PROJECT
TERM & ASSIGNMENT # TERM 2, ASSIGNMENT 2
TITLE: PROJECT PLAN
STUDENT
NAME
STUDENT
NUMBER
QUESTIONS
ANSWERED (BE
SPECIFIC)
CAMPUS: <<Insert campus or distance>>
TUTOR: <<Insert tutor name>>
TUTORIAL NUMBER: <<Insert the tutorial number>>
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
TABLE OF CONTENTS
1. Project Description (Total = 4 marks)
2. Stakeholders (Total = 10 marks)
3. Requirements Management (Total = 5 marks)
4. Scope (Total = 10 marks)
5. Schedule (Total = 6 marks)
6. Cost Baseline (Total = 6 marks)
7. Risks (Total = 5 marks)
8. Tolerances (Total = 2 marks)
9. Lessons Learnt (Total = 2 marks)
Assignment 2 PPMP20008 (T2 – 2019) V5
TABLE OF CONTENTS
1. Project Description (Total = 4 marks)
2. Stakeholders (Total = 10 marks)
3. Requirements Management (Total = 5 marks)
4. Scope (Total = 10 marks)
5. Schedule (Total = 6 marks)
6. Cost Baseline (Total = 6 marks)
7. Risks (Total = 5 marks)
8. Tolerances (Total = 2 marks)
9. Lessons Learnt (Total = 2 marks)
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
Instructions for Students
1. This document is a template with response tables for you to complete and has been
tailored to suit the assessment.
2. Instructions and guidance notes are provided in blue italicized to explain what
should be included in your responses.
3. Please remove all blue text before using Turnitin and uploading your
complete response into Moodle.
4. Where there are two or more options for you to decide between, revert to the option
you are keeping in black and remove the other.
5. This assignment is designed for educational purposes to assess your
understanding of the specific topics presented in this scenario.
6. Marks by Section:
Sections Mark %
Section 1 4 8 %
Section 2 10 20 %
Section 3 5 10 %
Section 4 10 20 %
Section 5 6 12 %
Section 6 6 12 %
Section 7 5 10 %
Section 8 2 4 %
Section 9 2 4 %
Totals 50 100 %
Assignment 2 PPMP20008 (T2 – 2019) V5
Instructions for Students
1. This document is a template with response tables for you to complete and has been
tailored to suit the assessment.
2. Instructions and guidance notes are provided in blue italicized to explain what
should be included in your responses.
3. Please remove all blue text before using Turnitin and uploading your
complete response into Moodle.
4. Where there are two or more options for you to decide between, revert to the option
you are keeping in black and remove the other.
5. This assignment is designed for educational purposes to assess your
understanding of the specific topics presented in this scenario.
6. Marks by Section:
Sections Mark %
Section 1 4 8 %
Section 2 10 20 %
Section 3 5 10 %
Section 4 10 20 %
Section 5 6 12 %
Section 6 6 12 %
Section 7 5 10 %
Section 8 2 4 %
Section 9 2 4 %
Totals 50 100 %
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
1 PROJECT DESCRIPTION (TOTAL = 4 MARKS)
1.1 PROJECT DESCRIPTION, BACKGROUND AND MAJOR DELIVERABLES (1
MARK)
Response Table
1 Description This project is about the establishment of the
educational hubs at the five different locations in
Australia. These locations include Perth, Melbourne,
Rockhampton, Sydney, and Brisbane. Through this, the
committee will support and encourage the education,
awareness, and understanding of local indigenous
people. The suitable venue will be selected for this
purpose and the facilities that should be included in the
buildings of the educational hubs will also be included
in the project scope. The opening ceremonies are also
requested by the committee and the specified will be
done for the conduction of these ceremonies at each of
the campus.
2 Background SET is the indigenization committee which is interested
in those projects by which the traditional culture of the
world is visible and for this purpose they take the
acknowledgment from the traditional custodians of
those lands where the building of campus is made.
This committee like to commence the project of
building the five hubs of education at Australia's five
different locations. The relevant bodies of funding will
be consulted by the chair of the committee for the
gathering of further information regarding this project.
3 Major Deliverables The total cost of the project is estimated to be not more
than one million dollars and each educational hub cost
is estimated to be approx. 200k dollars. The cost of
capital is included in these 1 million dollars and the
amount of rent and cost of operations will be excluded
in this. The determination will be made by the
committee about the number of stakeholders for this
project. The committee aims to encourage as many
students to gather learnings and education through
these hubs (Koh & Rowlinson, 2012).
1.2 JUSTIFICATION (3 MARKS)
Response Table
Output Outcome Benefits
Indigenous people will get
efficient knowledge
It will enhance the
student’s learnings and the
education system of
The economic growth of
Australia will take place by
being a student-centric
Assignment 2 PPMP20008 (T2 – 2019) V5
1 PROJECT DESCRIPTION (TOTAL = 4 MARKS)
1.1 PROJECT DESCRIPTION, BACKGROUND AND MAJOR DELIVERABLES (1
MARK)
Response Table
1 Description This project is about the establishment of the
educational hubs at the five different locations in
Australia. These locations include Perth, Melbourne,
Rockhampton, Sydney, and Brisbane. Through this, the
committee will support and encourage the education,
awareness, and understanding of local indigenous
people. The suitable venue will be selected for this
purpose and the facilities that should be included in the
buildings of the educational hubs will also be included
in the project scope. The opening ceremonies are also
requested by the committee and the specified will be
done for the conduction of these ceremonies at each of
the campus.
2 Background SET is the indigenization committee which is interested
in those projects by which the traditional culture of the
world is visible and for this purpose they take the
acknowledgment from the traditional custodians of
those lands where the building of campus is made.
This committee like to commence the project of
building the five hubs of education at Australia's five
different locations. The relevant bodies of funding will
be consulted by the chair of the committee for the
gathering of further information regarding this project.
3 Major Deliverables The total cost of the project is estimated to be not more
than one million dollars and each educational hub cost
is estimated to be approx. 200k dollars. The cost of
capital is included in these 1 million dollars and the
amount of rent and cost of operations will be excluded
in this. The determination will be made by the
committee about the number of stakeholders for this
project. The committee aims to encourage as many
students to gather learnings and education through
these hubs (Koh & Rowlinson, 2012).
1.2 JUSTIFICATION (3 MARKS)
Response Table
Output Outcome Benefits
Indigenous people will get
efficient knowledge
It will enhance the
student’s learnings and the
education system of
The economic growth of
Australia will take place by
being a student-centric
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
Australia will also become
effective through this.
approach to these hubs.
Young people will get more
opportunities for jobs and
career growth.
Improve the workforce of
Australia
The indigenous people will
get good education and
knowledge by the
educational hubs and will
be prepared strongly for
the future as their
knowledge will enhance by
educating from these hubs.
Various financial benefits
will be offered through the
education system. The
higher establishment of the
education will involve huge
investment in this area
both international and
domestic.
Resolving different issues
in the country
The generation of
knowledge, retention, and
transfer will help in
improving Australia's
economic condition. The
different technical
developments and growth
opportunities will be
developed by the students
The standardization of the
people of Australia by the
enhancement of the
learnings (Hwang & Low,
2012)
2 STAKEHOLDERS (TOTAL = 10 MARKS)
2.1 KEY STAKEHOLDER LIST (6 MARKS)
Response Table
# Stakeholder Category (i.ie Sponsor /
Supplier / User)
Description of
Interest
Description of
Influence
1. CQU University Supplier To provide
students with
the specialized
knowledge and
recruitment of
highly qualified
professionals
The permission
will be granted by
the CQU
University for
building the hubs
of education so it
has high
influence.
2. SET committee Sponsor Designing and
building of the
education
hubs at all the
five locations
and gathering
the funds for
the same.
Their decisions
have great
influence as all
the decisions
regarding the
building of hubs
are in the hands
of them. The
complete
controlling and
monitoring of the
Assignment 2 PPMP20008 (T2 – 2019) V5
Australia will also become
effective through this.
approach to these hubs.
Young people will get more
opportunities for jobs and
career growth.
Improve the workforce of
Australia
The indigenous people will
get good education and
knowledge by the
educational hubs and will
be prepared strongly for
the future as their
knowledge will enhance by
educating from these hubs.
Various financial benefits
will be offered through the
education system. The
higher establishment of the
education will involve huge
investment in this area
both international and
domestic.
Resolving different issues
in the country
The generation of
knowledge, retention, and
transfer will help in
improving Australia's
economic condition. The
different technical
developments and growth
opportunities will be
developed by the students
The standardization of the
people of Australia by the
enhancement of the
learnings (Hwang & Low,
2012)
2 STAKEHOLDERS (TOTAL = 10 MARKS)
2.1 KEY STAKEHOLDER LIST (6 MARKS)
Response Table
# Stakeholder Category (i.ie Sponsor /
Supplier / User)
Description of
Interest
Description of
Influence
1. CQU University Supplier To provide
students with
the specialized
knowledge and
recruitment of
highly qualified
professionals
The permission
will be granted by
the CQU
University for
building the hubs
of education so it
has high
influence.
2. SET committee Sponsor Designing and
building of the
education
hubs at all the
five locations
and gathering
the funds for
the same.
Their decisions
have great
influence as all
the decisions
regarding the
building of hubs
are in the hands
of them. The
complete
controlling and
monitoring of the
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
activities of the
project are made
by them.
3. Students user High interest in
gaining the
knowledge and
learnings as
they are the
end-users and
has the right to
getting the
best education
and knowledge
from the
efficient staff
The influence on
students is high
of the learnings
that are imparted
by the faculties
and staff
members of the
education hubs
(Qiang, et. al.,
2015).
4. Indigenous
leaders
users They highly
value their
cultures and
traditions so
they have
much interest
that no
negative
impact is made
on their
tradition by the
activities of the
hubs.
Special care is to
be taken by the
education hubs
that none of their
activity negatively
affect the
indigenous
people traditions
as it can result in
the legal actions
and issues.
5. Lecturers and
staff
supplier Their main
interest field is
providing all
the students
with high and
qualified
education.
They have a high
influence on the
hubs and
students as the
students are
highly dependent
on their study
pattern of
imparting the
knowledge.
6. National
aboriginals and
islanders (NAI)
day observance
committee
sponsor Interest in
enhancing the
brand
reputation of
all these hubs
and focus on
ensuring that
high-quality
services are
provided so
that large
numbers of
students are
attracted by its
The education
hub’s growth will
have a positive
impact on the NAI
committee and
they will be
motivated by
bringing more
proficient
services.
Assignment 2 PPMP20008 (T2 – 2019) V5
activities of the
project are made
by them.
3. Students user High interest in
gaining the
knowledge and
learnings as
they are the
end-users and
has the right to
getting the
best education
and knowledge
from the
efficient staff
The influence on
students is high
of the learnings
that are imparted
by the faculties
and staff
members of the
education hubs
(Qiang, et. al.,
2015).
4. Indigenous
leaders
users They highly
value their
cultures and
traditions so
they have
much interest
that no
negative
impact is made
on their
tradition by the
activities of the
hubs.
Special care is to
be taken by the
education hubs
that none of their
activity negatively
affect the
indigenous
people traditions
as it can result in
the legal actions
and issues.
5. Lecturers and
staff
supplier Their main
interest field is
providing all
the students
with high and
qualified
education.
They have a high
influence on the
hubs and
students as the
students are
highly dependent
on their study
pattern of
imparting the
knowledge.
6. National
aboriginals and
islanders (NAI)
day observance
committee
sponsor Interest in
enhancing the
brand
reputation of
all these hubs
and focus on
ensuring that
high-quality
services are
provided so
that large
numbers of
students are
attracted by its
The education
hub’s growth will
have a positive
impact on the NAI
committee and
they will be
motivated by
bringing more
proficient
services.
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
services.
2.2 STAKEHOLDERS ENGAGEMENT ASSESSMENT MATRIX (3 MARKS)
Response Table
# Stakeholder
s
Unaware Resistant Neutral Supportive Leading
1. NAI C&D
2. SET C D
3. Students C D
4. Faculty and
staff
members
C D
5. Indigenous
leaders
C&D
6. CQU
University
(Rubini &
Lucia, 2018)
C&D
Assignment 2 PPMP20008 (T2 – 2019) V5
services.
2.2 STAKEHOLDERS ENGAGEMENT ASSESSMENT MATRIX (3 MARKS)
Response Table
# Stakeholder
s
Unaware Resistant Neutral Supportive Leading
1. NAI C&D
2. SET C D
3. Students C D
4. Faculty and
staff
members
C D
5. Indigenous
leaders
C&D
6. CQU
University
(Rubini &
Lucia, 2018)
C&D
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2.3 STAKEHOLDER COMMUNICATION (1 MARK)
Response Table
Communication Method Interactive, Pull or Push Justification
Meetings and conferences Interactive The official meetings or
conferences are much
effective as the
discussion about each
activity can be made in
detail and response of
each stakeholder can be
noticed and actions can
be taken accordingly
(Butt, et. al., 2016).
E-mail for conducting the
meetings and informing the
stakeholders
Push It is the most efficient and
easy way of
communicating. Al the
stakeholders can be
informed regularly about
the project's progress
and decisions (Cohen, et.
al., 2014).
2.4 OBTAINING EXPERT JUDGEMENT (1 MARK)
Response Table
Experts Methods / Techniques
H. Muhammad, 2016 Any problems that can occur while the duration of
the project can be solved by the application of
‘Brainstorming technique’ which will allow for
the gathering of different ideas and efficient
solutions can be reached at (H. Muhammad,
2016).
Flostrand, 2017 Different experts’ panel can be sent with the
multiple questionnaires by ‘Delphi Technique’
which will help in forecasting the educational
hubs project’s progress and on that basis the
corrective actions can be taken (Flostrand, 2017).
Assignment 2 PPMP20008 (T2 – 2019) V5
2.3 STAKEHOLDER COMMUNICATION (1 MARK)
Response Table
Communication Method Interactive, Pull or Push Justification
Meetings and conferences Interactive The official meetings or
conferences are much
effective as the
discussion about each
activity can be made in
detail and response of
each stakeholder can be
noticed and actions can
be taken accordingly
(Butt, et. al., 2016).
E-mail for conducting the
meetings and informing the
stakeholders
Push It is the most efficient and
easy way of
communicating. Al the
stakeholders can be
informed regularly about
the project's progress
and decisions (Cohen, et.
al., 2014).
2.4 OBTAINING EXPERT JUDGEMENT (1 MARK)
Response Table
Experts Methods / Techniques
H. Muhammad, 2016 Any problems that can occur while the duration of
the project can be solved by the application of
‘Brainstorming technique’ which will allow for
the gathering of different ideas and efficient
solutions can be reached at (H. Muhammad,
2016).
Flostrand, 2017 Different experts’ panel can be sent with the
multiple questionnaires by ‘Delphi Technique’
which will help in forecasting the educational
hubs project’s progress and on that basis the
corrective actions can be taken (Flostrand, 2017).
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
3. REQUIREMENTS MANAGEMENT (TOTAL = 5 MARKS)
3.1 TRADITIONAL CUSTODIAN/S OF THE LAND ON WHICH CQ UNIVERSITY CAMPUSES
ARE LOCATED (1 MARK).
Response Table
The suggestion of the project executive of needing more than one key stakeholder is
correct as only one key stakeholder will not be efficient enough to keep eye on the
progress of all the five educational hubs. It will be very hectic and effective monitoring
cannot be done which will negatively affect the project’s success. At least two or three
stakeholders should be appointed so that each campus can be monitored by them and the
areas of the improvements or the areas where more focus is required to be made can be
known and immediate actions can be taken accordingly. The traditional landowners can be
represented effectively by the stakeholders so that they support in this project (Mashamba-
Thompson, et. al., 2017).
3.2. OPENING STATEMENT STYLE (1 MARK)
Response Table
“Welcome to the country” should be used by the campus leaders as the opening
statement as this will give a good image to the traditional indigenous people about the
country who have much value for their cultures, beliefs, and traditions. This will build
strong goodwill of the education hubs in the minds of people that the designing of the
University campus is made after considering the country’s people, and their traditions
(Rodriguez, et. al., 2018).
3.3 REQUIREMENTS GATHERING FOR CQU EDUCATIONAL HUBS FOR INDIGENOUS
STUDIES PROJECT (1 MARK)
Response Table
For gathering the information and requirements for this project the older documents of
Vietnam community project cannot be used as these documents have become old and in
those projects, old techniques and methods were used. Both Australia and Vietnam have
different values, culture, and beliefs so using these documents will not be proper for this
project. New methods and techniques should be adopted and there will not be any benefit
by the Vietnam documents and there might be the possibility of failure of the educational
hubs projects. Therefore, the research should be conducted in detail and information
should be gathered so that the traditional cultures and values can be considered
effectively (Nguyen, et. al., 2016).
3.4 REQUIREMENTS TRACEABILITY (0.5 MARK)
Response Table
There are five different campuses where the building of educational hubs will take place
so it will be very significant that the proper and detailed documentation should be
Assignment 2 PPMP20008 (T2 – 2019) V5
3. REQUIREMENTS MANAGEMENT (TOTAL = 5 MARKS)
3.1 TRADITIONAL CUSTODIAN/S OF THE LAND ON WHICH CQ UNIVERSITY CAMPUSES
ARE LOCATED (1 MARK).
Response Table
The suggestion of the project executive of needing more than one key stakeholder is
correct as only one key stakeholder will not be efficient enough to keep eye on the
progress of all the five educational hubs. It will be very hectic and effective monitoring
cannot be done which will negatively affect the project’s success. At least two or three
stakeholders should be appointed so that each campus can be monitored by them and the
areas of the improvements or the areas where more focus is required to be made can be
known and immediate actions can be taken accordingly. The traditional landowners can be
represented effectively by the stakeholders so that they support in this project (Mashamba-
Thompson, et. al., 2017).
3.2. OPENING STATEMENT STYLE (1 MARK)
Response Table
“Welcome to the country” should be used by the campus leaders as the opening
statement as this will give a good image to the traditional indigenous people about the
country who have much value for their cultures, beliefs, and traditions. This will build
strong goodwill of the education hubs in the minds of people that the designing of the
University campus is made after considering the country’s people, and their traditions
(Rodriguez, et. al., 2018).
3.3 REQUIREMENTS GATHERING FOR CQU EDUCATIONAL HUBS FOR INDIGENOUS
STUDIES PROJECT (1 MARK)
Response Table
For gathering the information and requirements for this project the older documents of
Vietnam community project cannot be used as these documents have become old and in
those projects, old techniques and methods were used. Both Australia and Vietnam have
different values, culture, and beliefs so using these documents will not be proper for this
project. New methods and techniques should be adopted and there will not be any benefit
by the Vietnam documents and there might be the possibility of failure of the educational
hubs projects. Therefore, the research should be conducted in detail and information
should be gathered so that the traditional cultures and values can be considered
effectively (Nguyen, et. al., 2016).
3.4 REQUIREMENTS TRACEABILITY (0.5 MARK)
Response Table
There are five different campuses where the building of educational hubs will take place
so it will be very significant that the proper and detailed documentation should be
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
prepared for each hub. The documentation of the objectives should be made so that the
proper monitoring can be exercised about the objectives of accomplishment.
Documentation should also include different methods and techniques that will be going
to be adopted during this project. It should include the WBS and WBS dictionary and
Gantt chart as this will give a clear picture of the activities that are required to be
completed within the particular time frame and the cost that should be incurred for each
activity and tolerance amount and time should also be documented.
3.5 REQUIREMENTS PRIORITIZATION PROCESS (1 MARK)
Response Table
Through the requirement prioritization, the risks can be minimized during the projects’
development. The activities and tasks that need to be prioritized should be focused and
concentrated more. The requirement prioritization should be communicated to the
stakeholders as by this they will be well aware of the project activities and the different
phases from which the educational hubs building project will pass from. This will also help
in determining the resources required in accomplishing each activity (Santos, et. al., 2016).
3.6 MoSCoW TECHNIQUE (0.5 MARK)
Response Table
# Components Explanation
1. Must-have It includes those initiatives that are
most essential for the project and the
success of the project much depends
on their presence.
2. Should-have They are important but not necessarily
to be included in the project. There can
be another way of satisfying the
requirements of these factors
3. Could-have These components are desirable but
are not necessary and if left-out then
project will not be affected to the great
extent.
4. Won’t have These are labeled as lowest payback,
least critical, and are not appropriate
by the stakeholders. Either these
components are dropped or
reconsidered so that they can be
included in the later time box (Chizhik,
et. al., 2017).
Assignment 2 PPMP20008 (T2 – 2019) V5
prepared for each hub. The documentation of the objectives should be made so that the
proper monitoring can be exercised about the objectives of accomplishment.
Documentation should also include different methods and techniques that will be going
to be adopted during this project. It should include the WBS and WBS dictionary and
Gantt chart as this will give a clear picture of the activities that are required to be
completed within the particular time frame and the cost that should be incurred for each
activity and tolerance amount and time should also be documented.
3.5 REQUIREMENTS PRIORITIZATION PROCESS (1 MARK)
Response Table
Through the requirement prioritization, the risks can be minimized during the projects’
development. The activities and tasks that need to be prioritized should be focused and
concentrated more. The requirement prioritization should be communicated to the
stakeholders as by this they will be well aware of the project activities and the different
phases from which the educational hubs building project will pass from. This will also help
in determining the resources required in accomplishing each activity (Santos, et. al., 2016).
3.6 MoSCoW TECHNIQUE (0.5 MARK)
Response Table
# Components Explanation
1. Must-have It includes those initiatives that are
most essential for the project and the
success of the project much depends
on their presence.
2. Should-have They are important but not necessarily
to be included in the project. There can
be another way of satisfying the
requirements of these factors
3. Could-have These components are desirable but
are not necessary and if left-out then
project will not be affected to the great
extent.
4. Won’t have These are labeled as lowest payback,
least critical, and are not appropriate
by the stakeholders. Either these
components are dropped or
reconsidered so that they can be
included in the later time box (Chizhik,
et. al., 2017).
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
4 SCOPE (TOTAL = 10 MARKS)
4.1 INTRODUCTION TO SCOPE (1 MARK)
Response Table
The work break down structure will be prepared which is the key deliverables of the project
and teams work can be managed and organized into sections. First of all, the project's
location will be selected for all the five campuses, and after analyzing the site the design
and blueprints will be prepared. After this, the faculties for the education hubs will be
recruited and students will be targeted by the market analysis. The arrangements will be
made for the opening ceremony and promotional strategies will be made.
WBS dictionary will include the sub-activities that will be undertaken for the completion of
each task and it will also include the duration time within which that activity needs to be
completed (Akrami, 2015).
4.2 WORK BREAKDOWN STRUCTURE (3 MARKS)
Assignment 2 PPMP20008 (T2 – 2019) V5
CQU Educational
Hubs for
Indigenous Studies
Project
Facility
space
location
selection for
each campus
Buleprint
development
and designing
Educational
hubs
recruitment
activities
students
enrollment
Opening
ceremonies
planning of
opening
ceremony
promotional
strategy
4 SCOPE (TOTAL = 10 MARKS)
4.1 INTRODUCTION TO SCOPE (1 MARK)
Response Table
The work break down structure will be prepared which is the key deliverables of the project
and teams work can be managed and organized into sections. First of all, the project's
location will be selected for all the five campuses, and after analyzing the site the design
and blueprints will be prepared. After this, the faculties for the education hubs will be
recruited and students will be targeted by the market analysis. The arrangements will be
made for the opening ceremony and promotional strategies will be made.
WBS dictionary will include the sub-activities that will be undertaken for the completion of
each task and it will also include the duration time within which that activity needs to be
completed (Akrami, 2015).
4.2 WORK BREAKDOWN STRUCTURE (3 MARKS)
Assignment 2 PPMP20008 (T2 – 2019) V5
CQU Educational
Hubs for
Indigenous Studies
Project
Facility
space
location
selection for
each campus
Buleprint
development
and designing
Educational
hubs
recruitment
activities
students
enrollment
Opening
ceremonies
planning of
opening
ceremony
promotional
strategy

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
4.3 WBS DICTIONARY (6 MARKS)
<Facility space>
WBS ID location selection for each campus
Description of work Each campus location will be analyzed and analyze
will be made regarding its space and resources
required
Cost Estimate $1200
Start and Finish Dates 1st July 2020 to 31st August 2020
< Facility space>
WBS ID Development of blueprint and designing of each
campus
Description of work Each location’s blueprint will be developed and the
designing of each campus will be made.
Cost Estimate $1400
Start and Finish Dates 1st September 2020 to 1st October 2020
<educational hubs>
WBS ID Recruitment activities
Description of work The lecturers, staff and faculty members will be
recruited through this process. The training will be
provided to the selected members
Cost Estimate $1800
Start and Finish Dates 2nd October 2020 to 30 November 2020
< educational hubs >
WBS ID Students enrolment
Description of work The students will be made aware of the different
courses offered by the education hubs and students
will be enrolled for different sections
Cost Estimate $1500
Start and Finish Dates 1st December 2020 to 31st January 2021
Assignment 2 PPMP20008 (T2 – 2019) V5
4.3 WBS DICTIONARY (6 MARKS)
<Facility space>
WBS ID location selection for each campus
Description of work Each campus location will be analyzed and analyze
will be made regarding its space and resources
required
Cost Estimate $1200
Start and Finish Dates 1st July 2020 to 31st August 2020
< Facility space>
WBS ID Development of blueprint and designing of each
campus
Description of work Each location’s blueprint will be developed and the
designing of each campus will be made.
Cost Estimate $1400
Start and Finish Dates 1st September 2020 to 1st October 2020
<educational hubs>
WBS ID Recruitment activities
Description of work The lecturers, staff and faculty members will be
recruited through this process. The training will be
provided to the selected members
Cost Estimate $1800
Start and Finish Dates 2nd October 2020 to 30 November 2020
< educational hubs >
WBS ID Students enrolment
Description of work The students will be made aware of the different
courses offered by the education hubs and students
will be enrolled for different sections
Cost Estimate $1500
Start and Finish Dates 1st December 2020 to 31st January 2021
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 23
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.