PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
INFORMATION PAGE
[Students to complete]
PROJECT NAME: CQU EDUCATIONAL HUBS
FOR INDIGENOUS STUDIES
PROJECT
TERM & ASSIGNMENT # TERM 2, ASSIGNMENT 2
TITLE: PROJECT PLAN
STUDENT
NAME
STUDENT
NUMBER
QUESTIONS
ANSWERED(BE
SPECIFIC)
CAMPUS: <<Insert campus or distance>>
TUTOR: <<Insert tutor name>>
TUTORIAL NUMBER: <<Insert the tutorial number>>
Assignment 2 PPMP20008 (T2 – 2019) V5
INFORMATION PAGE
[Students to complete]
PROJECT NAME: CQU EDUCATIONAL HUBS
FOR INDIGENOUS STUDIES
PROJECT
TERM & ASSIGNMENT # TERM 2, ASSIGNMENT 2
TITLE: PROJECT PLAN
STUDENT
NAME
STUDENT
NUMBER
QUESTIONS
ANSWERED(BE
SPECIFIC)
CAMPUS: <<Insert campus or distance>>
TUTOR: <<Insert tutor name>>
TUTORIAL NUMBER: <<Insert the tutorial number>>
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
TABLE OF CONTENTS
1. Project Description (Total = 4 marks)
2. Stakeholders (Total = 10 marks)
3. Requirements Management (Total = 5 marks)
4. Scope (Total = 10 marks)
5. Schedule (Total = 6 marks)
6. Cost Baseline (Total = 6 marks)
7. Risks (Total = 5 marks)
8. Tolerances (Total = 2 marks)
9. Lessons Learnt (Total = 2 marks)
Assignment 2 PPMP20008 (T2 – 2019) V5
TABLE OF CONTENTS
1. Project Description (Total = 4 marks)
2. Stakeholders (Total = 10 marks)
3. Requirements Management (Total = 5 marks)
4. Scope (Total = 10 marks)
5. Schedule (Total = 6 marks)
6. Cost Baseline (Total = 6 marks)
7. Risks (Total = 5 marks)
8. Tolerances (Total = 2 marks)
9. Lessons Learnt (Total = 2 marks)
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
Instructions for Students
1. This document is a template with response tables for you to complete and has been
tailored to suit the assessment.
2. Instructions and guidance notes are provided in blue italicizedto provide an
explanation of what should be included in your responses.
3. Pleaseremove all blue text prior to using Turnitin and uploading your
complete response into Moodle.
4. Where there are two or more options for you to decide between, revert to the option
you are keeping in black and remove the other.
5. This assignment is designed for educationalpurposes to assess your understanding
of specific topics presented in this scenario.
6. Marks by Section:
Sections Mark %
Section 1 4 8 %
Section 2 10 20 %
Section 3 5 10 %
Section 4 10 20 %
Section 5 6 12 %
Section 6 6 12 %
Section 7 5 10 %
Section 8 2 4 %
Section 9 2 4 %
Totals 50 100 %
Assignment 2 PPMP20008 (T2 – 2019) V5
Instructions for Students
1. This document is a template with response tables for you to complete and has been
tailored to suit the assessment.
2. Instructions and guidance notes are provided in blue italicizedto provide an
explanation of what should be included in your responses.
3. Pleaseremove all blue text prior to using Turnitin and uploading your
complete response into Moodle.
4. Where there are two or more options for you to decide between, revert to the option
you are keeping in black and remove the other.
5. This assignment is designed for educationalpurposes to assess your understanding
of specific topics presented in this scenario.
6. Marks by Section:
Sections Mark %
Section 1 4 8 %
Section 2 10 20 %
Section 3 5 10 %
Section 4 10 20 %
Section 5 6 12 %
Section 6 6 12 %
Section 7 5 10 %
Section 8 2 4 %
Section 9 2 4 %
Totals 50 100 %
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
1 PROJECT DESCRIPTION(TOTAL = 4 MARKS)
1.1 PROJECT DESCRIPTION, BACKGROUNDAND MAJOR DELIVERABLES (1
MARK)
Every project has its own essential objectives which can be managed and operated by the
project management team in effective manner. The School of Engineering and Technology
(SET) Indigenisation Committee (The Committee) has decided to design new educational
structure which can develop new educational system and enhance educational level by
developing educational Hubs for Indigenous Studies Project. Further the overall system of the
project essentials are analysed in this report. The main motive of this report is to focus on the
techniques and approaches which help in enhancing the performance of the organisation and
will help in developing better engagement of stakeholders. Stakeholders are playing quite
essential role in the context of developing better decision making system in the organisation or
in relation to any other context.
Response Table
1 Description To maintain effective management, project manager
has to adopt different project management
methodologies through which effective decision could
be made in the context of accomplishing targets of
company. Here the current project is focusing on the
development of educational hubs in CQU university
through which effective educational and training
programmes can be provided to the students and will
help in advancing the educational level of the students
at classes. The School of Engineering and Technology
(SET) Indigenisation Committee (The Committee) has
decided to design new educational structure which can
develop new educational system and enhance
educational level by developing educational Hubs for
Indigenous Studies Project.
The basic goal of the project is to concentrates on the
procedure and parts of Artificial Intelligence methods
and examines how such innovative advances in the
instruction divisions' leads top outcome in educational
hub classes. The fundamental rationale behind
directing this project is to break down the effect of
man-made brainpower in improving the instructive
degree of training office by giving them better training
and learning programs at educational hubs. In this
project, as a chairman of the committee I will
concentrate on the procedures and methodologies
which are utilized by the coaches while using the
strategies of man-made brainpower systems for
indigenous studies. Utilization of man-made
brainpower has built up the comprehension and
learning abilities of students and help them to
enhancing their learning power with the help of
analysing each and every aspect carefully.
2 Background CQU university has developed one of the best
Assignment 2 PPMP20008 (T2 – 2019) V5
1 PROJECT DESCRIPTION(TOTAL = 4 MARKS)
1.1 PROJECT DESCRIPTION, BACKGROUNDAND MAJOR DELIVERABLES (1
MARK)
Every project has its own essential objectives which can be managed and operated by the
project management team in effective manner. The School of Engineering and Technology
(SET) Indigenisation Committee (The Committee) has decided to design new educational
structure which can develop new educational system and enhance educational level by
developing educational Hubs for Indigenous Studies Project. Further the overall system of the
project essentials are analysed in this report. The main motive of this report is to focus on the
techniques and approaches which help in enhancing the performance of the organisation and
will help in developing better engagement of stakeholders. Stakeholders are playing quite
essential role in the context of developing better decision making system in the organisation or
in relation to any other context.
Response Table
1 Description To maintain effective management, project manager
has to adopt different project management
methodologies through which effective decision could
be made in the context of accomplishing targets of
company. Here the current project is focusing on the
development of educational hubs in CQU university
through which effective educational and training
programmes can be provided to the students and will
help in advancing the educational level of the students
at classes. The School of Engineering and Technology
(SET) Indigenisation Committee (The Committee) has
decided to design new educational structure which can
develop new educational system and enhance
educational level by developing educational Hubs for
Indigenous Studies Project.
The basic goal of the project is to concentrates on the
procedure and parts of Artificial Intelligence methods
and examines how such innovative advances in the
instruction divisions' leads top outcome in educational
hub classes. The fundamental rationale behind
directing this project is to break down the effect of
man-made brainpower in improving the instructive
degree of training office by giving them better training
and learning programs at educational hubs. In this
project, as a chairman of the committee I will
concentrate on the procedures and methodologies
which are utilized by the coaches while using the
strategies of man-made brainpower systems for
indigenous studies. Utilization of man-made
brainpower has built up the comprehension and
learning abilities of students and help them to
enhancing their learning power with the help of
analysing each and every aspect carefully.
2 Background CQU university has developed one of the best
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
educational system within the Australia and provide
education more than 100000 students in a year. The
main motive of professionals and managers of CQU is
to develop better educational hubs for the indigenous
studies through which effective educational system can
be set up. With the help of implementation of artificial
intelligence which will also develop learning power or
students in the context of educational hubs. Utilization
of man-made brainpower has built up the
comprehension and learning abilities of students and
help them to enhancing their learning power with the
help of analysing each and every aspect carefully. With
the help of these information about launching the
educational hubs, the project manager should adopt
effective approaches which will lead to beneficial
results for the company.
3 Major Deliverables The major deliverables of the project is to develop
engagement of the stakeholders through which
effective decisions could be made in the context of
launching educational hubs for students for indigenous
studies. Further the main purpose of the project is to
enhance educational level for students with the help of
educational hubs. The main motive of the company is
to develop authentic approaches in the educational
classes through which effective development can be
done for the students. The project is mainly is to
enhance develop efficiency and learning power of the
students.
1.2 JUSTIFICATION (3 MARKS)
There are various benefits in the context of development of educational hubs in the
context of students and for better development of society.
Response Table
Output Outcome Benefits
Encourage students of
local area for studies
Develop student
engagement for further
studies
Notwithstanding the
advantages brought to
urban areas in which
instruction centres are
situated, there may
likewise be points of
interest to the bigger
networks. Principles of
neighbourhood instructive
offices, will make quality
tertiary training
programmes for students
significantly more open for
country networks and help
in providing better
Assignment 2 PPMP20008 (T2 – 2019) V5
educational system within the Australia and provide
education more than 100000 students in a year. The
main motive of professionals and managers of CQU is
to develop better educational hubs for the indigenous
studies through which effective educational system can
be set up. With the help of implementation of artificial
intelligence which will also develop learning power or
students in the context of educational hubs. Utilization
of man-made brainpower has built up the
comprehension and learning abilities of students and
help them to enhancing their learning power with the
help of analysing each and every aspect carefully. With
the help of these information about launching the
educational hubs, the project manager should adopt
effective approaches which will lead to beneficial
results for the company.
3 Major Deliverables The major deliverables of the project is to develop
engagement of the stakeholders through which
effective decisions could be made in the context of
launching educational hubs for students for indigenous
studies. Further the main purpose of the project is to
enhance educational level for students with the help of
educational hubs. The main motive of the company is
to develop authentic approaches in the educational
classes through which effective development can be
done for the students. The project is mainly is to
enhance develop efficiency and learning power of the
students.
1.2 JUSTIFICATION (3 MARKS)
There are various benefits in the context of development of educational hubs in the
context of students and for better development of society.
Response Table
Output Outcome Benefits
Encourage students of
local area for studies
Develop student
engagement for further
studies
Notwithstanding the
advantages brought to
urban areas in which
instruction centres are
situated, there may
likewise be points of
interest to the bigger
networks. Principles of
neighbourhood instructive
offices, will make quality
tertiary training
programmes for students
significantly more open for
country networks and help
in providing better
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
educational programmes.
In this sense, the costs
engaged with sending
youngsters to another
country to study are , just
like the way of life with
nations and to enhance
their educational level.
Furthermore, school-
matured understudies may
have more prominent
access to college offices
and the advantages which
they give.
Good impact on traditional
destinations
Reduce issues related to
poor education systems
with help of educational
hubs
It appears to be that
nations in which
organizations depend on
students selecting from
these areas will face
issues in the coming years.
Without the numbers, and
worldwide charges got, the
weight will be on for any
excessively reliant colleges
to discover proper
educational sources. With
development of
educational hubs and
through implementation of
educational practice
practices there will be good
impact on the traditional
areas and lead to quite
beneficial for the
companies.
2 STAKEHOLDERS(TOTAL = 10 MARKS)
Assignment 2 PPMP20008 (T2 – 2019) V5
educational programmes.
In this sense, the costs
engaged with sending
youngsters to another
country to study are , just
like the way of life with
nations and to enhance
their educational level.
Furthermore, school-
matured understudies may
have more prominent
access to college offices
and the advantages which
they give.
Good impact on traditional
destinations
Reduce issues related to
poor education systems
with help of educational
hubs
It appears to be that
nations in which
organizations depend on
students selecting from
these areas will face
issues in the coming years.
Without the numbers, and
worldwide charges got, the
weight will be on for any
excessively reliant colleges
to discover proper
educational sources. With
development of
educational hubs and
through implementation of
educational practice
practices there will be good
impact on the traditional
areas and lead to quite
beneficial for the
companies.
2 STAKEHOLDERS(TOTAL = 10 MARKS)
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2.1 KEY STAKEHOLDER LIST (6 MARKS)
In every project stakeholders are playing quite significant role in the development and
accomplishment of project deliverables in effective manner. It is the duty of project manager to
develop proper engagement of stakeholders in the project which will lead to productive result in the
context of launching educational hubs.
Guidance Notes:
[Be specific when listing who the stakeholder or stakeholder groups are and include the category in
the second column. Do not include the project manager or the project team, as a stakeholder.
The description of interest should describe the stakeholder’s (or stakeholder groups) main interest
in the project. The description of influence should describe the potential influence the stakeholder
or stakeholder group has on the project].
Response Table
# Stakeholder Category (i.ie Sponsor /
Supplier / User)
Description of
Interest
Description of
Influence
1. School of
Engineering and
Technology
(SET)
Indigenisation
Committee
User or Sponsor Designing and
Building of the
educational
hubs
Will see how the
whole project
would be
conducted.
2. National
Aborigines and
Islanders Day
Observance
Committee
Sponsor Will be
responsible for
helping in
getting new
skills and
knowledge that
are required
for the project.
Will increase
their goodwill
when the
educational
hubs will grow.
Will help in giving
inspiration and
enthusiasm for
completion of the
project
Provide funds for
making sure that
no financial
problems occur.
3. CQU University Supplier Providing
student with
more
knowledge.
The campus of
the university will
be used for the
whole event.
4. Executives Supplier Tasks of the
whole project
should be
completed
efficiently.
Strategies
need to be
used to make
Training of the
people who
would be working
in the educational
hubs.
Assignment 2 PPMP20008 (T2 – 2019) V5
2.1 KEY STAKEHOLDER LIST (6 MARKS)
In every project stakeholders are playing quite significant role in the development and
accomplishment of project deliverables in effective manner. It is the duty of project manager to
develop proper engagement of stakeholders in the project which will lead to productive result in the
context of launching educational hubs.
Guidance Notes:
[Be specific when listing who the stakeholder or stakeholder groups are and include the category in
the second column. Do not include the project manager or the project team, as a stakeholder.
The description of interest should describe the stakeholder’s (or stakeholder groups) main interest
in the project. The description of influence should describe the potential influence the stakeholder
or stakeholder group has on the project].
Response Table
# Stakeholder Category (i.ie Sponsor /
Supplier / User)
Description of
Interest
Description of
Influence
1. School of
Engineering and
Technology
(SET)
Indigenisation
Committee
User or Sponsor Designing and
Building of the
educational
hubs
Will see how the
whole project
would be
conducted.
2. National
Aborigines and
Islanders Day
Observance
Committee
Sponsor Will be
responsible for
helping in
getting new
skills and
knowledge that
are required
for the project.
Will increase
their goodwill
when the
educational
hubs will grow.
Will help in giving
inspiration and
enthusiasm for
completion of the
project
Provide funds for
making sure that
no financial
problems occur.
3. CQU University Supplier Providing
student with
more
knowledge.
The campus of
the university will
be used for the
whole event.
4. Executives Supplier Tasks of the
whole project
should be
completed
efficiently.
Strategies
need to be
used to make
Training of the
people who
would be working
in the educational
hubs.
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
sure that the
work is
completed on
time within the
provided
budget.
5. Students User The student
needs to be
included in
every part of
the project.
Gaining of new
knowledge and
skills.
They will be the
ones that will be
taking effective
part in the
educational hubs.
6. Staff User They will be
making sure
that the work
being done is
efficient so that
the education
hubs can
flourish
The
establishment of
the responsibility
would be seen as
they would be the
project
managers.
2.2 STAKEHOLDERS ENGAGEMENT ASSESSMENT MATRIX (3 MARKS)
[Instructions:
Complete the Response Table below for the six Key Stakeholders identified above.
Guidance Notes:
The Project Board has asked you to complete a ‘Stakeholders Engagement Assessment Matrix’.
Indicate their current engagement levels by insertingan ‘C’(represents current engagement) and‘D’
(desired engagement) in the appropriate column]. Refer to PMBoK for further assistance.At least
one reference must be cited to support your response].
Response Table
# Stakeholder
s
Unaware Resistant Neutral Supportive Leading
1. School of
Engineering
and
Technology
(SET)
Indigenisation
Committee
D D
2. National
Aborigines and
Islanders Day
Observance
Committee
C D
3. CQU University C D
4. Executives D
Assignment 2 PPMP20008 (T2 – 2019) V5
sure that the
work is
completed on
time within the
provided
budget.
5. Students User The student
needs to be
included in
every part of
the project.
Gaining of new
knowledge and
skills.
They will be the
ones that will be
taking effective
part in the
educational hubs.
6. Staff User They will be
making sure
that the work
being done is
efficient so that
the education
hubs can
flourish
The
establishment of
the responsibility
would be seen as
they would be the
project
managers.
2.2 STAKEHOLDERS ENGAGEMENT ASSESSMENT MATRIX (3 MARKS)
[Instructions:
Complete the Response Table below for the six Key Stakeholders identified above.
Guidance Notes:
The Project Board has asked you to complete a ‘Stakeholders Engagement Assessment Matrix’.
Indicate their current engagement levels by insertingan ‘C’(represents current engagement) and‘D’
(desired engagement) in the appropriate column]. Refer to PMBoK for further assistance.At least
one reference must be cited to support your response].
Response Table
# Stakeholder
s
Unaware Resistant Neutral Supportive Leading
1. School of
Engineering
and
Technology
(SET)
Indigenisation
Committee
D D
2. National
Aborigines and
Islanders Day
Observance
Committee
C D
3. CQU University C D
4. Executives D
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
5. Students C
6. Staff C D
Assignment 2 PPMP20008 (T2 – 2019) V5
5. Students C
6. Staff C D
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2.3 STAKEHOLDER COMMUNICATION (1 MARK)
[Instruction:
Describe the communication method you believe will be most effective, state whether the
method is INTERACTIVE, PULL or PUSH communication, and briefly justify your choice
Guidance Notes:
The Project Board has asked you to provide advice on how best to communicate with the key
indigenous stakeholderswho are not on the Project Board or in the Project Team.At least one
reference must be cited to support your response].
Response Table
Communication Method Interactive, Pull or Push Justification
Meetings/Conference Interactive This is because discussion
would be done from both
sides on seeing what
changes need to be made
in the project.
Face Push There would need to
communication done
directly so that proper
requirements of the project
would need to be done.
Emails Pull/Push Up-to-date about the work
which is going on in the
project.
Social Media Pull/Push Providing each other
information about what will
be done in the task if they
are stuck.
2.4OBTAINING EXPERT JUDGEMENT (1 MARK)
[Instruction:
Describe at least two different methods or techniques to obtain this expert judgement from
groups and/or individuals?
Guidance Notes:
In order to create a stakeholder management plan judgement and expertise should be sought from
relevant groups or individuals. At least two supporting references must be cited to support the
proposed methods or techniques].
Response Table
Experts Methods / Techniques
Zavattaro, & Sementelli,
2014
These experts have shown how social media is
being used as one way push communication
method. There would be sharing of information
that would lead to knowledge for other people
Green, et. al. 2019 The emails are considered as pull communication
as they can be accessed at any time by the
users. There is no specific time that needs to be
Assignment 2 PPMP20008 (T2 – 2019) V5
2.3 STAKEHOLDER COMMUNICATION (1 MARK)
[Instruction:
Describe the communication method you believe will be most effective, state whether the
method is INTERACTIVE, PULL or PUSH communication, and briefly justify your choice
Guidance Notes:
The Project Board has asked you to provide advice on how best to communicate with the key
indigenous stakeholderswho are not on the Project Board or in the Project Team.At least one
reference must be cited to support your response].
Response Table
Communication Method Interactive, Pull or Push Justification
Meetings/Conference Interactive This is because discussion
would be done from both
sides on seeing what
changes need to be made
in the project.
Face Push There would need to
communication done
directly so that proper
requirements of the project
would need to be done.
Emails Pull/Push Up-to-date about the work
which is going on in the
project.
Social Media Pull/Push Providing each other
information about what will
be done in the task if they
are stuck.
2.4OBTAINING EXPERT JUDGEMENT (1 MARK)
[Instruction:
Describe at least two different methods or techniques to obtain this expert judgement from
groups and/or individuals?
Guidance Notes:
In order to create a stakeholder management plan judgement and expertise should be sought from
relevant groups or individuals. At least two supporting references must be cited to support the
proposed methods or techniques].
Response Table
Experts Methods / Techniques
Zavattaro, & Sementelli,
2014
These experts have shown how social media is
being used as one way push communication
method. There would be sharing of information
that would lead to knowledge for other people
Green, et. al. 2019 The emails are considered as pull communication
as they can be accessed at any time by the
users. There is no specific time that needs to be
Assignment 2 PPMP20008 (T2 – 2019) V5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
identified for accessing the file.
Assignment 2 PPMP20008 (T2 – 2019) V5
identified for accessing the file.
Assignment 2 PPMP20008 (T2 – 2019) V5

PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
3. REQUIREMENTS MANAGEMENT (TOTAL = 5 MARKS)
3.1 TRADITIONAL CUSTODIAN/S OF THE LAND ON WHICH CQ UNIVERSITY CAMPUSES
ARE LOCATED (1 MARK).
[Instruction:
The Senior Supplier has asked whether there can be a single key stakeholder representing
the Traditional Custodians of the land on which the relevant Central Queensland Campuses
are located. The Project Executive suggests that they will need more than one key
stakeholder representing the Traditional Custodians of the land on which Central
Queensland Campuses are located.
.
Guidance Notes:
Describe which approach is most appropriate and provide a brief explanation justifying your
answer.At least one supporting reference must be inserted to justify your response].
Response Table
There needs to be more that key stakeholder that would need to be involved because the
land belongs to the aboriginal people and it is necessary to take their permission before
using it. The celebration being decided would need to be done in a way that all of the
stakeholders are satisfied rather than there being one.
3.2.OPENING STATEMENT STYLE (1 MARK)
[Instructions:
State which of the two opening statement styles, ‘Welcome to Country’ or
‘Acknowledgement of Country’, is appropriate for the campus leaders to use at the opening
ceremoniesfor the new educational hubs. Please provide a brief explanation justifying your
answer.
Guidance Notes:
The Project Board has asked that the respective campus leaders officiate at the naming
ceremonies for the new educational hubson their campus and ask your advice regarding which
statement should be used at the opening ceremonies for the new educational hubs. The Board are
not sure if it should be a “Welcome to Country” or an “Acknowledgement of Country”. The campus
leaders are not of Aboriginal or Torres Strait Islander descent.At least one supporting reference
must be inserted to justify your response].
Response Table
The board should say ‘Welcome to Country’ because they are traditional people who
would want that not too much of new is introduced. They are also known as indigenous
people so this would be more of a better sign to be put up. They are known to be the
caretakers of Australia for a long time so it would be appropriate to use this (Gee, et. al.
2014).
3.3 REQUIREMENTS GATHERING FOR CQU EDUCATIONAL HUBS FOR INDIGENOUS
STUDIES PROJECT (1 MARK)
[Instructions:
State whether the suggestion of using documentation from the Vietnamese community
Assignment 2 PPMP20008 (T2 – 2019) V5
3. REQUIREMENTS MANAGEMENT (TOTAL = 5 MARKS)
3.1 TRADITIONAL CUSTODIAN/S OF THE LAND ON WHICH CQ UNIVERSITY CAMPUSES
ARE LOCATED (1 MARK).
[Instruction:
The Senior Supplier has asked whether there can be a single key stakeholder representing
the Traditional Custodians of the land on which the relevant Central Queensland Campuses
are located. The Project Executive suggests that they will need more than one key
stakeholder representing the Traditional Custodians of the land on which Central
Queensland Campuses are located.
.
Guidance Notes:
Describe which approach is most appropriate and provide a brief explanation justifying your
answer.At least one supporting reference must be inserted to justify your response].
Response Table
There needs to be more that key stakeholder that would need to be involved because the
land belongs to the aboriginal people and it is necessary to take their permission before
using it. The celebration being decided would need to be done in a way that all of the
stakeholders are satisfied rather than there being one.
3.2.OPENING STATEMENT STYLE (1 MARK)
[Instructions:
State which of the two opening statement styles, ‘Welcome to Country’ or
‘Acknowledgement of Country’, is appropriate for the campus leaders to use at the opening
ceremoniesfor the new educational hubs. Please provide a brief explanation justifying your
answer.
Guidance Notes:
The Project Board has asked that the respective campus leaders officiate at the naming
ceremonies for the new educational hubson their campus and ask your advice regarding which
statement should be used at the opening ceremonies for the new educational hubs. The Board are
not sure if it should be a “Welcome to Country” or an “Acknowledgement of Country”. The campus
leaders are not of Aboriginal or Torres Strait Islander descent.At least one supporting reference
must be inserted to justify your response].
Response Table
The board should say ‘Welcome to Country’ because they are traditional people who
would want that not too much of new is introduced. They are also known as indigenous
people so this would be more of a better sign to be put up. They are known to be the
caretakers of Australia for a long time so it would be appropriate to use this (Gee, et. al.
2014).
3.3 REQUIREMENTS GATHERING FOR CQU EDUCATIONAL HUBS FOR INDIGENOUS
STUDIES PROJECT (1 MARK)
[Instructions:
State whether the suggestion of using documentation from the Vietnamese community
Assignment 2 PPMP20008 (T2 – 2019) V5
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 26
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.