CQU Educational Hubs for Indigenous Studies Project Plan

Verified

Added on  2025/08/27

|23
|3516
|464
AI Summary
Desklib provides solved assignments and past papers to help students succeed.
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
INFORMATION PAGE
[Students to complete]
PROJECT NAME: CQU EDUCATIONAL HUBS
FOR INDIGENOUS STUDIES
PROJECT
TERM & ASSIGNMENT # TERM 2, ASSIGNMENT 2
TITLE: PROJECT PLAN
STUDENT
NAME
STUDENT
NUMBER
QUESTIONS
ANSWERED (BE
SPECIFIC)
CAMPUS: <<Insert campus or distance>>
TUTOR: <<Insert tutor name>>
TUTORIAL NUMBER: <<Insert the tutorial number>>
Assignment 2 PPMP20008 (T2 – 2019) V5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
TABLE OF CONTENTS
1. Project Description (Total = 4 marks)
2. Stakeholders (Total = 10 marks)
3. Requirements Management (Total = 5 marks)
4. Scope (Total = 10 marks)
5. Schedule (Total = 6 marks)
6. Cost Baseline (Total = 6 marks)
7. Risks (Total = 5 marks)
8. Tolerances (Total = 2 marks)
9. Lessons Learnt (Total = 2 marks)
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
Instructions for Students
1. This document is a template with response tables for you to complete and has been tailored
to suit the assessment.
2. Instructions and guidance notes are provided in blue italicized to provide an explanation of
what should be included in your responses.
3. Please remove all blue text prior to using Turnitin and uploading your complete response
into Moodle.
4. Where there are two or more options for you to decide between, revert to the option you are
keeping in black and remove the other.
5. This assignment is designed for educational purposes to assess your understanding of
specific topics presented in this scenario.
6. Marks by Section:
Sections Mark %
Section 1 4 8 %
Section 2 10 20 %
Section 3 5 10 %
Section 4 10 20 %
Section 5 6 12 %
Section 6 6 12 %
Section 7 5 10 %
Section 8 2 4 %
Section 9 2 4 %
Totals 50 100 %
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
1 PROJECT DESCRIPTION (TOTAL = 4 MARKS)
1.1 PROJECT DESCRIPTION, BACKGROUND AND MAJOR DELIVERABLES (1
MARK)
Response Table
1 Description The project is based on the development of awareness
among students and educational hubs about local indigenous
people. In order to do that there is a selection of CQU
campus where all the related and relevant seminars will be
conducted. The aim is to develop maximum awareness about
indigenous people in the society.
2 Background Indigenous people have been the root of the society in all
countries thus there is a need to understand all the issues and
associated factors dealing with global development and
effective needs to spread more information about their
culture and needs. They have been the foundation of current
culture and social well being. The need to know about
indigenous people is to collaborate both the cultures and
make cultural unity in both societies (Sushames, et. al., 2016).
3 Major Deliverables The major deliverable associated with the project includes
effective development of course content and information to
be given to the audience. The focus is to deliver maximum
knowledge about indigenous people and spread cultural
unity and understanding.
1.2 JUSTIFICATION (3 MARKS)
Response Table
Output Outcome Benefits
The output that is more likely
to be observed in the project
includes the development of
information and statistics
among students. This can be
seen that with development of
modern culture and versatile
choices many students might
not take much interest in the
based on these outputs this
can be imagined that nit all
but a few percentages of
people are interested. This
very is helpful in spreading
knowledge about indigenous
people.
The major benefit is the
cultural and social awareness
associated with the cause.
This can help in making
further development in social
upliftment of indigenous
people.
Assignment 2 PPMP20008 (T2 – 2019) V5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
seminar. This might affect
ultimate goal of the seminar
(Kenia et. al., 2016).
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2 STAKEHOLDERS (TOTAL = 10 MARKS)
2.1 KEY STAKEHOLDER LIST (6 MARKS)
Response Table
# Stakeholder Category (i.ie Sponsor /
Supplier / User)
Description of
Interest
Description of
Influence
1. CQU College
management
Supplier The major
interest is to
provide
infrastructure
and develop
knowledge
among students
The will motivate
other universities
also to develop
features and
seminars to
promote
knowledge about
different cultures.
2. School of
Engineering and
Technology
Sponsor The interest is to
create and
culturally united
society and fund
to develop it
This will help to
create a platform
for science and
culture.
3. Indigenisation
Committee
Sponsor The interest is to
raise awareness
about
indigenous
people
This will help other
committees also to
develop social base
for all.
4. Facilitator Supplier They are the one
who believes in
delivering the
best services and
facilities for
successful
seminar sessions
This will help in
the development of
future benefits and
such issues to
develop a cultural
base.
5. Researchers User They are
interested in
cultural
knowledge
about
indigenous
people
This will benefit
their knowledge
and outcome
associated with
diversity.
6. Students User They are
interested in
knowing more
about
indigenous
people
They can share
knowledge on the
same.
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2.2 STAKEHOLDERS ENGAGEMENT ASSESSMENT MATRIX (3 MARKS)
Response Table
# Stakeholders Unaware Resistant Neutral Supportive Leading
1. CQU College
management
D D C C C
2. School of
Engineering
and
Technology
D D D C C
3. Indigenisation
Committee
D C D C C
4. Facilitator C C D C C
5. Researchers D D D C C
6. Students D D D C C
(Mesquida & Mas,2014)
Assignment 2 PPMP20008 (T2 – 2019) V5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2.3 STAKEHOLDER COMMUNICATION (1 MARK)
Response Table
Communication Method Interactive, Pull or Push Justification
The major method of
communication that has been
selected in the process includes
seminar and conference to
address major people and
explaining things to them
effectively.
This kind of method is very
interactive in nature as it has a
good number of participants to
share views and learn.
This process is good to see
the amount of knowledge
grasped by the people and
associated factors to
develop further knowledge
on the same.
Another kind of
communication techniques is
written communication by
giving written material based
on indigenous people and their
resources.
This method is both interactive
and pushes as this provided all
relevant information to
participants to maintain their
interest in the same (Mesquida &
Mas, 2014).
This process is important to
see the gaps in current
learning and future
interaction and make
changes in the same.
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
2.4 OBTAINING EXPERT JUDGEMENT (1 MARK)
Response Table
Experts Methods / Techniques
Individual The interview method is the best technique that can be
used by an individual to judge the thinking capability
and idea involved in the seminar. In this the individual
is asked one to one a series of questions in order to
explain their logic and terminology associated with the
same (Ter, et. al., 2019).
Groups Brainstorming is techniques that have been given to a
group of people so that they can show various ideas
and thoughts associated with the topic and can also
give feedback and opinion on each other (Nogal, et. al.,
2019).
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
3. REQUIREMENTS MANAGEMENT (TOTAL = 5 MARKS)
3.1 TRADITIONAL CUSTODIAN/S OF THE LAND ON WHICH CQ
UNIVERSITY CAMPUSES ARE LOCATED (1 MARK).
Response Table
Prince 2 approach will be best suited for the case as in this case there is a need of multiple
stakeholders like supplier, owner, and sponsor. All three of them are required to design the project
plan and support the changes in development. The PRINCE 2 project is necessary to initiate
maintain and close the project with all relevant changes(Valek, 2014).
3.2. OPENING STATEMENT STYLE (1 MARK)
Response Table
The best opening statement will be “ Welcome to the country” this will provide an effective and
in-depth understanding to the overall platform and needs that can help to show the affection and
welcome nature of the committee. This statement will show culture and embrace their needs
(Nurius, et. al., 2015).
3.3 REQUIREMENTS GATHERING FOR CQU EDUCATIONAL HUBS FOR
INDIGENOUS STUDIES PROJECT (1 MARK)
Response Table
The idea to take Vietnamese data is good in this case as this shows the past experience and the
associated features with indigenous society. This kind of documentation will be helpful to determine
historical idea and background associated with an individual. The Vietnamese documentation will
be helpful in making future adjustments in the curriculum content and will also provide effective
knowledge based on this documentation (Nurius, et.al., 2015).
3.4 REQUIREMENTS TRACEABILITY (0.5 MARK)
Response Table
In or to track and trace the requirements the major documents that were used includes old
published data on indigenous people and other categorized data on the same. In this process, the
management has planned to develop their own tracking list to see the progress in all the section of
the planning and make changes in the same eventually (Sullivan, et. al., 2019).
3.5 REQUIREMENTS PRIORITIZATION PROCESS (1 MARK)
Response Table
The company is needed to explain all the stakeholders there importance and participation in the
project thus in order to do that all the requirements are needed to be prioritize seen as per the needs
of the stakeholders. Requirement prioritization is the process that shows which stakeholder
Assignment 2 PPMP20008 (T2 – 2019) V5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
requirements are more important and which are not. There can be various approaches used to study
the requirement and categorize them but in this case the selected approach is Moscow approach.
This defines the needs and values involved in the process and makes changes as per them (Nguyen,
et. al., 2017).
3.6 MoSCoW TECHNIQUE (0.5 MARK)
Response Table
# Components Explanation
1. Must have The past data and knowledge material
associated with indigenous people and
associated study material for all the people.
2. Should have Research papers and speakers that can talk
about their cultural diversity and
involvement in social development
3. Could have More participation from other universities
and colleges to know about cultural needs.
4. Won't have (this time) The individual speaker from typical
indigenous society for better examples and
sharing of personal experiences.
Assignment 2 PPMP20008 (T2 – 2019) V5
Document Page
PMMP 20008 – Initiating and Planning Projects (T2) Assignment 2
4 SCOPE (TOTAL = 10 MARKS)
4.1 INTRODUCTION TO SCOPE (1 MARK)
Response Table
The overall work break down structure is divided into three levels they are divided into three levels
based on the distribution of priority and making changes in the same. The main CQU hub is divided
into three sections namely facility hub, educational hubs, and opening hubs. In facility hubs the
major focus in on the development of facility and curriculum associated with the same thus the
same has been effective to deal with substantial standards and corresponding knowledge associated
with the same. The next is the evaluation of learning experience and collective knowledge that
shows the amount of knowledge adapted and understood in the process.
In the educational hubs, the major focus is on the knowledge build-up and sharing among the
students and teachers. This is followed by feedback and need of this session in their future. This hub
is more involved in the development of overall knowledge and future factors associated with the
project. The opening hub deals with the welcome arrangement and supporting facilities to help the
guest and audience settle for the session and help them in understanding the concept of the session
and major points associated with them.
4.2 WORK BREAKDOWN STRUCTURE (3 MARKS)
Assignment 2 PPMP20008 (T2 – 2019) V5
chevron_up_icon
1 out of 23
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]