This case study examines the contract procurement management strategies for a Central Queensland University (CQU) project, identified as PPMP20011, which involves the construction of a new campus at Melbourne. The project includes four main elements: a lecture building, computer and engineering laboratories, a motel, and a conference hall. It covers the project's lifecycle from initiation to operations, highlighting the roles of various stakeholders such as the project manager, architect, and engineers. Different procurement routes and methods are discussed, with a focus on the suitability of a fixed fee contract due to the project's well-defined scope, timeframe, and pre-determined costs. The analysis includes risk allocation and a detailed project budget, providing a comprehensive overview of the financial aspects of the project. The document concludes with a reference list of relevant sources used in the analysis.
Document Page
Contract Procurement Management for CQU
Contractor: PPMP20011
Company
1
Construct four Elements:
Lecture Building
Computer and Engineering Labs
Conference hall
Motel
2
3
Budget
Fixed Budget:
CAD: Timelines for the Works
The Project must be ready for
occupation by January 2020
Project
Characteri
stics
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Life Cycle
Project
Initiati
on
Plannin
g and
Fundin
g
Environ
mental
Impact
Assess
ment
(EIA)
Project
Design
Legal
and
Regula
tory
Permit
s
Real
Property
Acquisiti
on
Bidding
and
Contract
Awarding
Constr
uction
Works
Commi
ssionin
g
Operat
ions
Document Page
The Role of Project management
CQU
(Agency)
Quality
Assurance
Project
Manager
Contractor
(PPMP20011
Company )
Archit
ect
Structural
Engineers
Geotechni
cal
Engineers
Civil
Engineers
Procurement
Document Page
Procurement Routes for CQU
The design-build-operate-
maintain(DBOM) model
combines the design and
construction responsibilities
of design-build procurements
with operations and
maintenance”.
Principal Routes
Traditional /
conventional design led
Design and construct
Management (Fee)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Procurement Methods
Document Page
Procurement Methods – Cont’d
Document Page
Procurement Methods – Cont’d
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Ideal Contract Type
Contract Types
Fixed
Cost Reimbursable
(CR)
Time & Material
(T&M)
Labor Hour (LH)
Fixed Fee Contract
is the most ideal
type of contract for
this kind of project.
Document Page
Justification for Fixed Fee Contract
The scope is properly defined.
The timeframe is known.
The cost is pre – determined.
Risks are transferred to the contractor.
Project requirements are defined at the design
stage.
The quality of the project is charged on the
contractor as a single point of contact with th
eclient.
Document Page
Risk Analysis
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Risk Allocation
Document Page
Project Budget
BUDGET FOR CENTRAL QUEENLAND UNIVERSITY PROJECT
(Amount Quoted in 10,000' US Dollars)
ELEMENT
PROJECT ITEM MAIN LECTURE
BUILDING
COMPUTER AND
ENGINEERING
LABORATIRIES MOTEL CONFERENCE
HALL TOTAL
Project Initiation $ 200.00 $ 200.00 $ 200.00 $ 200.00 $ 800.00
Planning and
Funding $ 1,000.00 $ 2,500.00 $ 1,000.00 $ 500.00 $ 5,000.00
Environmental
Impact Asessment $ 10.00 $ 10.00 $ 10.00 $ 10.00 $ 40.00
Design $ 500.00 $ 1,000.00 $ 500.00 $ 500.00 $ 2,500.00
Regulatory
Permits $ 10.00 $ 20.00 $ 10.00 $ 10.00 $ 50.00
Real Property
Acquisition $ - $ - $ - $ - $ -
Bidding & Award $ - $ - $ - $ - $ -
Comisssioning $ 2.00 $ 2.00 $ 2.00 $ 2.00 $ 8.00
Operations $ 10.00 $ 10.00 $ 10.00 $ 10.00 $ 40.00
Construction $ 17,320.00 $ 37,420.00 $ 17,320.00 $ 12,320.00 $ 8,438.00
Totals $ 19,052.00 $ 41,162.00 $ 19,052.00 $ 13,552.00 $ 92,818.00
Grand Totals $ 190,520,000.00 $ 411,620,000.00 $ 190,520,000.00 $ 135,520,000.00 $ 928,180,000.00
chevron_up_icon
1 out of 14
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]