CSIS 2200: Galaxy Buds IOS Application Analysis and Design Project

Verified

Added on  2022/10/15

|9
|289
|13
Project
AI Summary
This project delves into the analysis and design of a Galaxy Buds IOS application, covering various aspects from the business case to system implementation. The project outlines the system requirements, including the use of brainstorming and interviews for data gathering, and presents a context diagram to illustrate system processes, involving users and admins. The document further describes the business processing through a use case diagram, highlighting the roles of users and admins, and an ER diagram to represent the entities. The development approach focuses on in-house development to mitigate copyright issues and reduce costs, with a detailed project plan, estimated at 125 days, and references to relevant literature. The project encompasses the executive summary, business case, system planning, system analysis, system design (including user interface, reports, security, and data design), system architecture, and implementation, providing a comprehensive overview of the application's development lifecycle.
Document Page
IOS Application Analysis and Design
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Systems Requirements
The data gathering
technique used for
development of the system:
Brain storming
Interview
The Context diagram shows the procedures that are being
carried out by the System.
The primary actors acting with the system are users and admins.
Document Page
Systems Requirements
The main procedures that
are described in this
diagram are :
Download Music
Open Playlist
Show Music Player
Produce Report
Document Page
Business Processing
The Use case diagram
provides the details of the
all the business processing
of the system
The main actors identified
in the diagram are user and
admin
All the processes performed
by the actors are described
in this diagram
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Business Processing
The ER Diagram is used for
the description of all the
Entity
All the major entities can
be listed with the help of he
diagram.
Document Page
Systems Development
The in-house development
has been selected for the
development of the
application
Prevents from copyright
issues.
Reduces cost for the
organization.
Document Page
Systems Development
The revised plan for the
development of the
project has been
described here.
The total duration of
the project can be
estimated from here
which is around 125
days.
S No. Description Duration (Days)
1 Planning Phase 8
2 Designing of Web Application 21
3 Coding 25
4 Mobile App Development 30
5 User Experience Development 16
6 Project Requirement 4
7 Project Closure Phase 6
8 Risk Assessment 5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Bibliography
Trofimova, I. (2017). Phenomena of functional differentiation and
fractal functionality. Complex Systems: Theory and A
Lee, J., Lee, K., Jeong, E., Jo, J., & Shroff, N. B. (2016, September).
Context-aware application scheduling in mobile systems: What will
users do and not do next?. In Proceedings of the 2016 ACM
International Joint Conference on Pervasive and Ubiquitous
Computing (pp. 1235-1246). ACM.
Document Page
Thank You
chevron_up_icon
1 out of 9
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]