This report presents an overview of the Darling Harbour Swing Bridge replacement project, focusing on the Pyrmont Bridge in Sydney, Australia. The project, managed by the Sydney Harbour Foreshore Authority, involves replacing the existing swing bridge to improve functionality and extend its lifespan. The report details the scope of work, including superstructure and substructure modifications, swing span replacement, and electrical and mechanical overhauls. It outlines the project's budget, construction schedule, and key milestones. Additionally, it addresses quality and safety management plans, procurement strategies, and relevant references. The project utilizes a fixed-price contract and a Design-Bid-Build delivery method. The report provides a comprehensive analysis of the project's structure, budget, timeline, and key phases, including kickoff, planning, implementation, monitoring, and project closure.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
DARLING HARBOUR SWING BRIDGE
REPLACEMENT (DHSBR)
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
SWING BRIDGE REDEVELOPMENT AT
DARLING HARBOUR
The project is about replacement of Pyrmont Bridge that
is located at Darling Harbour, Sydney, NSW, Australia.
It is maintained and regulated by the Sydney Harbour
Foreshore Authority. It is designed in a Swing bridge
style with a total length of 369 metres or 1,211 ft.
It is made up of 14 spans with ironbark timber while a
central span has been made up using steel.
Document Page
SWING BRIDGE
Document Page
PROJECT OVERVIEW
The key target of the planned replacement
project DHSBR is to introduce some structural
modifications in the Swing bridge at Darling
Harbour so as to improve its functionality, life
span and sound traffic management.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
SCOPE OF WORK (SOW)
Superstructure replacement
Substructure modifications
Swing span replacement
Complete mechanical & electrical overhaul
Slab modification
Replacement of operator house and fender
system
Document Page
WORK BREAKDOWN STRUCTURE
(WBS)
Document Page
TIME AND COST
Project budget: 31,474,000.00 AUD
Construction work commencing date:
11/09/2017
Scheduled date of completion: 5/12/2017
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
KEY MILESTONE
Phase 1: Kickoff/Pre- construction
activities
8 days, 18 September, 2017
Phase 2: Planning & designing phase 12 days, 30 September, 2017
Phase 3: Implementation phase 40 days, 9 November, 2017
Phase 4: Monitoring and controlling
phase
16 days, 25 November 2017
Phase 5: 10 day project closure 10 Days, 5 December 2017
Document Page
QUALITY MANAGEMENT
Quality Management plan
Quality Assurance framework
Quality control
Document Page
SAFETY MANAGEMENT
CSSMP (Contractor Site Safety Management
Plan
Safety guidelines and manuals
Personal protective equipments
Workers trainings
Emergent Plan
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
PROCUREMENT STRATEGY
Contract type: Fixed price contract
Delivery method: Design Bid Build (DBB)
Document Page
REFERENCES
de Freitas, S.T., Kolstein, H. and Bijlaard, F.,
2010. Composite bonded systems for
renovations of orthotropic steel bridge
decks. Composite Structures. 92(4). pp.853-
862.
Karas, S., 2013. Unique Hennebique Bridges
in Lublin, Poland. American Journal of Civil
Engineering and Architecture. 1(2). pp.47-51.
Document Page
chevron_up_icon
1 out of 13
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]