This assignment solution addresses various aspects of construction and demolition, encompassing risk management, demolition planning, and site preparation. It includes a detailed demolition plan with steps like risk management, planning, service disconnection, and site clearance. The solution also covers load transfer directions, and environmental considerations like bushfire, high wind, and earthquake requirements, along with a site inspection checklist. Furthermore, it examines relevant building services such as heating, water, and artificial lighting, and provides checklists for compliance in footing systems, concrete floors, timber floors, masonry walls, truss roofs, and framed roofs. The provided checklists detail the operations, records, quality tests, and comments for each construction stage, ensuring adherence to building codes and standards.
Document Page
Assessment 6 1
CPCCBC4010B: ASSESSMENT 6
First Name Last Name
Course
Professor’s Name
University
Date
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Assessment 6 2
Question 1
Demolition plan for the existing dwelling involves the various steps in the development of a
demolition plan including:
1. Risk Management
The management of the identified hazards also needed to be incorporated according to the
Regulations 34-38 of the Australian Standards and codes. The identified risks will be minimized
using the appropriate control measures so as to maintain a healthy working environment during
the demolition works (WHS, 2011).
2. Planning the Demolition Work
A written document will be submitted to relevant authorities giving notice on intended
demolition, five day before the commencement of the work based on Regulations 142 (WHS,
2011).
Setting out of the planed demolition site will be carried out through the hired licensed and
registered surveyors. The correct boundaries of the building and the site will be identified and
pegged.
A hoarding of an A class will be erected around the construction perimeter with an overhead
protection provided through the erection of a B class loading to protect the public from falling
materials. Also, scaffolding cladded with chain wires and shade clothes will be provided to cater
for materials falling in excess of four meters and trap the dust respectively.
Disconnection of essential services. The essential services currently connected to the building
such as the supplies of gas, electricity, sewerage and telecommunications will be safely
Document Page
Assessment 6 3
disconnected prior to demolition (Build,2018). According to the WHS Regulations, nearby mains
for pressurized gas, chemicals, fuel and refrigerant lines will be disconnected (WHS,20111).
Acquisition of the demolition silence. However, some silences will not be obtained for a certain
works that does not require silences (WHS Regulations 458).
3. Risk Control During Demolition Works
Risks arising from hazardous chemicals will be controlled such that no worker or person is
exposed to dangerous chemicals based on Regulations 49 (WHS,2011). The demolition area will
be secured through the establishment excursion zones by use of secure impassible barricades
with appropriate signage (AS1170). A two-meter temporary fencing for construction will be
established in AS1725 (AS1725, 2010).
4. Demolition and the Demolition Method
Mechanical demolition will be the main method of demolition of the building with all equipment
and workers fitted protective devices. A continuous supervision will be done during each stage
of the demolition. Excavators, forward and back loaders will be used during demolition and
handling of wastes and transporter Lories for their disposal (Pranav et.al, 2015).
5. Site Clearance
Upon completion of the demolition works, the site will be cleared through removal of equipment
and barricades. A notification given to the building surveyors, consultants and owners that the
work has successfully been completed (Kumbhar, 2013).
Document Page
Assessment 6 4
Question 2
The direction of load transfer to the foundation of the building
Figure 1: Load Transfer Directions
Question 3
a. Bush Fire (Medium Risk)
Bush fire medium risks are provided by the Australian Standards, AS 3959 Part two. Section two
of the code provides the performance provisions, Clause P2.3 the Fire safety, sub clause P2.3.4
the requirements for buildings in Bushfire areas and P2.3.5 provides the requirements for the
private bushfires (AS3959, 2012).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Assessment 6 5
b. High wind
The requirements for wind loads buildings are provides by the Building Codes of Australia,
BCA, Volume 2, Section 3 and Sub-sections 10.1.0.The Performance Requirement P2.1.1 is
satisfied for a building constructed in a high wind area if it complies with various types of
structures or materials including :
I. Masonry: Australian Standards AS 3700 and AS 4773 Parts 1 and 2.
II. The Northern Territory Deemed-to-Comply Standards Manual.
III. Timber: Australian Standards AS 1684.2 and AS 1684.3.
IV. Steel: Australian Standards AS 4100 for steel framing, AS 4600 for Cold-formed steel
structures and Residential and low-rise steel framing: NASH Standard – Residential and
Low-Rise Steel Framing, Part 1 or Part 2 (BCA, 2016).
c. Earthquake
Requirements for buildings in earthquake prone areas are provided by the BCA, Volume 2,
Section 3, Part 3.10.2. The acceptable construction manuals are provided in the Part 3.11.
d. Alpine area (NSW)
The requirements are provided in the BCA, Volume 2, Section 2, and Part2.3.6. The provisions
include that an external doorway from a building in same area must be installed so that opening
the door is not obstructed by snow or ice etc. (NCC, 2016).
Document Page
Assessment 6 6
Question 4
a) A checklist for a preliminary site inspection of the site are based on critical points and
criteria (Caldeira, 2018).
SITE INSPECTION CHECKLIST
Project Details
Project Reference Number: Project Title:
Owner: Property Address:
BA Permit Number: Title Reference:
Designer: Building Surveyor:
Builder: Engineer:
Classification of Building: Number of Storley:
Type of Construction: Inspection Date:
Consultant Reports Checked
Geotechnical Engineers Report
Hydrology Report
Structural Engineers Report
Site Inspection Checklist Checked
Document Page
Assessment 6 7
PPE Gear
Torch and Mirror
Steel bar
Steel reinforcement gauge
Measuring Tapes (8m&30m)/EMD
Compass
IPad/Tablet
Mobile Phone
Wet Weather Gear
Approved Building Plans and Specifications
Development Approval Conditions
Title Survey
Site Plan
Camera
Site Weather Conditions on Site
Fine
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Assessment 6 8
Rain
Humidity
Compliant Checklist Legend
CP Compliant with approved plans and specifications
NC Not Compliant with BCA and Standard
Requirements
NAR No action required
FIR Further Information Required
N/A Not Applicable
To be completed during visit
Checked Comment
Photos of site
Sketch site
Topography
Building Location
Security Fencing
Document Page
Assessment 6 9
Boundary identification
Site drainage
Excavations
Sedimentation control
Protection of adjoining properties
Demolition
Asbestos removal
Foundation soil type
Soil to classification
Compacted fill
Landslip
Bearing Value
Wind Classification(BCA)
Access issues
Vegetation
Bushfire management
Document Page
Assessment 6 10
Surrounding buildings
Site office and amenities
Weather data
Environmental issues
Services
In accordance with approved plans
Notes:
b) A drawing of the site clearly showing salient features
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Assessment 6 11
Figure 2: Building Slab and Orientation