Building and Construction: Rhyndarra Hospital Demolition Report
VerifiedAdded on 2022/09/23
|21
|4368
|64
Report
AI Summary
This report details a simulated demolition project for the Rhyndarra Hospital in Brisbane, Australia, adhering to Australian demolition standards. The project includes a comprehensive demolition work plan, hazardous substances management plan, and public protection measures. The report covers site-specific methods to maintain structural stability, waste management processes to reduce environmental impacts, and compliance with local authorities for traffic management. It also addresses site induction processes, risk analysis, and OHS compliance to protect workers. The report provides detailed forms, photographic surveys, and outlines various demolition activities, emphasizing safety and environmental considerations throughout the demolition process. The report highlights the importance of proper demolition planning, hazardous material handling, and site safety to prevent accidents and environmental damage.

BUILDING AND CONSTRUCTION 1
Building and Construction
Name of Student
Institution Affiliation
Building and Construction
Name of Student
Institution Affiliation
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BUILDING AND CONSTRUCTION 2
Table of Contents
Introduction................................................................................................................................4
Project site: Rhyndarra...........................................................................................................4
Simulated demolition.................................................................................................................6
Details for the simulated demolition......................................................................................6
Form A................................................................................................................................6
Form B: general details.......................................................................................................6
Form C: photographs and comments..................................................................................9
Hazardous substances management plan..............................................................................10
Demolition work plan with site-specific methods of demolition to maintain structural
stability.................................................................................................................................12
Public protection measures for adjoining public space along common boundaries.............13
Waste management processes to reduce environmental impacts.........................................14
Comply with local authorities for Traffic management.......................................................14
Site Induction process for all site entries..............................................................................15
Risk analysis for the simulated onsite activities...................................................................16
OHS compliance to protect workers for all onsite activities................................................18
Site supervision....................................................................................................................18
Conclusion................................................................................................................................19
REFRENCES...........................................................................................................................20
Table of Contents
Introduction................................................................................................................................4
Project site: Rhyndarra...........................................................................................................4
Simulated demolition.................................................................................................................6
Details for the simulated demolition......................................................................................6
Form A................................................................................................................................6
Form B: general details.......................................................................................................6
Form C: photographs and comments..................................................................................9
Hazardous substances management plan..............................................................................10
Demolition work plan with site-specific methods of demolition to maintain structural
stability.................................................................................................................................12
Public protection measures for adjoining public space along common boundaries.............13
Waste management processes to reduce environmental impacts.........................................14
Comply with local authorities for Traffic management.......................................................14
Site Induction process for all site entries..............................................................................15
Risk analysis for the simulated onsite activities...................................................................16
OHS compliance to protect workers for all onsite activities................................................18
Site supervision....................................................................................................................18
Conclusion................................................................................................................................19
REFRENCES...........................................................................................................................20

BUILDING AND CONSTRUCTION 3
Introduction
The demolition of a structure is a process whereby an existing structure is
purposefully destroyed in order to generate a diversity of fragments and components of
mixed materials. The demolition process takes the shape of a lifecycle, in which it undergoes
various stages of planning, design, construction, as well as maintenance. Since the past times,
various buildings have been demolished, which is still a functionally and structurally
accepted activity. Nonetheless, in recent times, there have been concerns on demolitions
relating to waste disposal from the demolition process as well as the environmental pressures
arising from the demolition (Allen & Iano, 2013). This has thus resulted in the determination
of the importance of demolition, which focuses on the failures and disasters from lack of
knowledge and awareness on the effective process of demolition.
An instance is demolition of a structure having hazardous chemicals to human health
as well as the environment. Hence, land creation is some significant issue which the
community should avoid as it results in serious environmental issues. An instance is the
demolition of royal Canberra hospital in 1997, which resulted in the death of a young girl and
nine other people hospitalized following a hit by debris (Banias et al., 2013).
In this research, we seek to offer a safe way of the demolition of a hospital, two-story
building located in Australia. The Rhyndara hospital will just act as a case study for the
simulated coordination & management demolition. Nonetheless, the demolition is bound to
adopt the Australian standards for safe demolition of structures.
Project site: Rhyndarra
Our case study will be the demolition of a Rhyndarra hospital, located in the city of Brisbane,
Australia. The building was constructed in 1888 to 1938, and it is known for being the second
women’s hospitals for the Australian military forces. The building is a two-story building and
originally functioned as a Salvation Army girl’s industrial school.
Introduction
The demolition of a structure is a process whereby an existing structure is
purposefully destroyed in order to generate a diversity of fragments and components of
mixed materials. The demolition process takes the shape of a lifecycle, in which it undergoes
various stages of planning, design, construction, as well as maintenance. Since the past times,
various buildings have been demolished, which is still a functionally and structurally
accepted activity. Nonetheless, in recent times, there have been concerns on demolitions
relating to waste disposal from the demolition process as well as the environmental pressures
arising from the demolition (Allen & Iano, 2013). This has thus resulted in the determination
of the importance of demolition, which focuses on the failures and disasters from lack of
knowledge and awareness on the effective process of demolition.
An instance is demolition of a structure having hazardous chemicals to human health
as well as the environment. Hence, land creation is some significant issue which the
community should avoid as it results in serious environmental issues. An instance is the
demolition of royal Canberra hospital in 1997, which resulted in the death of a young girl and
nine other people hospitalized following a hit by debris (Banias et al., 2013).
In this research, we seek to offer a safe way of the demolition of a hospital, two-story
building located in Australia. The Rhyndara hospital will just act as a case study for the
simulated coordination & management demolition. Nonetheless, the demolition is bound to
adopt the Australian standards for safe demolition of structures.
Project site: Rhyndarra
Our case study will be the demolition of a Rhyndarra hospital, located in the city of Brisbane,
Australia. The building was constructed in 1888 to 1938, and it is known for being the second
women’s hospitals for the Australian military forces. The building is a two-story building and
originally functioned as a Salvation Army girl’s industrial school.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

BUILDING AND CONSTRUCTION 4
We will consider providing simulated coordination & management for the large hospital, by
adopting the Australian demolition standards, AS2601; demolition of a structure. The
diagram below illustrates the building
We will consider providing simulated coordination & management for the large hospital, by
adopting the Australian demolition standards, AS2601; demolition of a structure. The
diagram below illustrates the building
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BUILDING AND CONSTRUCTION 5
Simulated demolition
Details for the simulated demolition
Form A
Property details : cccc
Client : cccc
Billing address : cccc
Email : cccc@yahoo.co.ke
Phone number : cccc
Property address : cccc
Developer : cccc
Date of inspection : cccc
Inspector : cccc
Details of access
At the time of inspection, the weather conditions were stable and sunny
At the time of inspection, various activities were ongoing as well as treatment of patients
At the time of inspection, power was connected
At the time of inspection, water was connected.
Form B: general details
Author and experience
I clearly state that I am the author of this document and have over ten years in project
management, construction, property development, as well as building defects investigation. I
am the director of Gysvst limited company, whose sole business is to generate building
reports to:
Solicitors having clients and owners in dispute
Simulated demolition
Details for the simulated demolition
Form A
Property details : cccc
Client : cccc
Billing address : cccc
Email : cccc@yahoo.co.ke
Phone number : cccc
Property address : cccc
Developer : cccc
Date of inspection : cccc
Inspector : cccc
Details of access
At the time of inspection, the weather conditions were stable and sunny
At the time of inspection, various activities were ongoing as well as treatment of patients
At the time of inspection, power was connected
At the time of inspection, water was connected.
Form B: general details
Author and experience
I clearly state that I am the author of this document and have over ten years in project
management, construction, property development, as well as building defects investigation. I
am the director of Gysvst limited company, whose sole business is to generate building
reports to:
Solicitors having clients and owners in dispute

BUILDING AND CONSTRUCTION 6
Clients before purchasing a building
Developers before and after purchasing a construction facility
Terms of reference
In response to your request, we have taken the initiative to generate a report of the
Rhyndarra hospital, located in the city of Brisbane, Australia. In particular, this document
will document the general condition of the structures presented within the facility as well as
the buildings adjacent to it. Further, it should be noted that the construction dilapidation
report of 16th august 1988 by Anjana consultancies has been used as a reference point. Since
we are neither structural engineers, we have not provided the condition of the building in
Jregrds to its structural stability.
Important information
Nothing contained in this condition report shows that parts which were not assessed at
the date of inspection are free from defects
No responsibility is taken off by the authors of the report for the defects realized
No responsibility shall be taken by the authors of the generate for the areas which
were not physically accessible by the surveyors
Our company is not entitled to make any additions or alterations after the inspection
of the site, implying that the liability does not extend to any addition, alteration nor
extension after the site inspection
The report is strictly made for the client on the front page of this page, and no
publication or distribution should be made to any other party without the agreement of
the Janjaga limited company.
Reasonable access
Clients before purchasing a building
Developers before and after purchasing a construction facility
Terms of reference
In response to your request, we have taken the initiative to generate a report of the
Rhyndarra hospital, located in the city of Brisbane, Australia. In particular, this document
will document the general condition of the structures presented within the facility as well as
the buildings adjacent to it. Further, it should be noted that the construction dilapidation
report of 16th august 1988 by Anjana consultancies has been used as a reference point. Since
we are neither structural engineers, we have not provided the condition of the building in
Jregrds to its structural stability.
Important information
Nothing contained in this condition report shows that parts which were not assessed at
the date of inspection are free from defects
No responsibility is taken off by the authors of the report for the defects realized
No responsibility shall be taken by the authors of the generate for the areas which
were not physically accessible by the surveyors
Our company is not entitled to make any additions or alterations after the inspection
of the site, implying that the liability does not extend to any addition, alteration nor
extension after the site inspection
The report is strictly made for the client on the front page of this page, and no
publication or distribution should be made to any other party without the agreement of
the Janjaga limited company.
Reasonable access
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

BUILDING AND CONSTRUCTION 7
The inspection was done strictly to areas which were accessible. As per the Australian
standards AS4349.1, reasonable access is defined as areas which are unobstructed, safe,
characterized with minimal clearances, areas absent of clearances, as well as areas within the
arm’s length. It actually does not entail removal of bolts and screws to assess the covers.''
Roof interior: access opening = 600 * 600 mm, height accessible from 3.5m step
ladder, or 4.5 m ladder when placed against the wall, crawl space = 800 * 800mm
Subfloor: access opening = 700 * 500mm, other obstruction (concrete) = 700mm,
crawl space (timber floor) = 600mm to the joist
Roof exterior: accessible either 2.1m step ladder or 3.6 m ladder
The inspection was done strictly to areas which were accessible. As per the Australian
standards AS4349.1, reasonable access is defined as areas which are unobstructed, safe,
characterized with minimal clearances, areas absent of clearances, as well as areas within the
arm’s length. It actually does not entail removal of bolts and screws to assess the covers.''
Roof interior: access opening = 600 * 600 mm, height accessible from 3.5m step
ladder, or 4.5 m ladder when placed against the wall, crawl space = 800 * 800mm
Subfloor: access opening = 700 * 500mm, other obstruction (concrete) = 700mm,
crawl space (timber floor) = 600mm to the joist
Roof exterior: accessible either 2.1m step ladder or 3.6 m ladder
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BUILDING AND CONSTRUCTION 8
Form C: photographs and comments
NUMBER Areas inspected Photographic image Comments
1. The general
condition of the
hospital
2. The general
condition of the road
3. The general
condition of the
northern external
wall
4. The general
condition of the
eastern external wall
5. The general
condition of the
ceiling
Conclusion
On the nineteenth day of July 2019, a photographic survey was conducted on the Rhyndarra
hospital and the property assessed. At the time of inspection, there were no serious structural
issues in the adjacent road observed.
Yours faithfully
Jajaja limited
Detach kinda
Form C: photographs and comments
NUMBER Areas inspected Photographic image Comments
1. The general
condition of the
hospital
2. The general
condition of the road
3. The general
condition of the
northern external
wall
4. The general
condition of the
eastern external wall
5. The general
condition of the
ceiling
Conclusion
On the nineteenth day of July 2019, a photographic survey was conducted on the Rhyndarra
hospital and the property assessed. At the time of inspection, there were no serious structural
issues in the adjacent road observed.
Yours faithfully
Jajaja limited
Detach kinda

BUILDING AND CONSTRUCTION 9
Be (civil)
Licensed building contractor
19th- o7- 2019
Hazardous substances management plan
In order to avoid environmental liability, hazardous materials need to be properly
disposed of. Proper hazardous managements includes disposal, identification as well as
accumulation. The contractor undertaking the demolition work is tasked with identification as
well as the accumulations procedures. However, all the disposal shall be in accordance with
environmental health and safety (Seear & Fraser, 2014).
Billing
Arrangement pertaining to the waste collection should be made by the contractor and the n
delivered to the waste management facility. The chemical waste pickup request form shall
guide the location of the building. Depending on the terms of the contract, the disposal of the
materials in the construction debris shall be disposed of by the contractor
Training
All the contractors who will accumulate and handle the hazardous materials will document
that their staff underwent appropriate training to handle the chemicals wastes.
Hazardous substances in the hospital Asbestos
A licensed asbestos consultant shall assist in conducting an asbestos survey of the site before
the demolition process. A copy of the site survey shall be reviewed by certified EPA asbestos
inspectors via training provider (Coelho & Brito, 2012). Lead paint
Be (civil)
Licensed building contractor
19th- o7- 2019
Hazardous substances management plan
In order to avoid environmental liability, hazardous materials need to be properly
disposed of. Proper hazardous managements includes disposal, identification as well as
accumulation. The contractor undertaking the demolition work is tasked with identification as
well as the accumulations procedures. However, all the disposal shall be in accordance with
environmental health and safety (Seear & Fraser, 2014).
Billing
Arrangement pertaining to the waste collection should be made by the contractor and the n
delivered to the waste management facility. The chemical waste pickup request form shall
guide the location of the building. Depending on the terms of the contract, the disposal of the
materials in the construction debris shall be disposed of by the contractor
Training
All the contractors who will accumulate and handle the hazardous materials will document
that their staff underwent appropriate training to handle the chemicals wastes.
Hazardous substances in the hospital Asbestos
A licensed asbestos consultant shall assist in conducting an asbestos survey of the site before
the demolition process. A copy of the site survey shall be reviewed by certified EPA asbestos
inspectors via training provider (Coelho & Brito, 2012). Lead paint
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

BUILDING AND CONSTRUCTION 10
The materials which have been identified as being characterized with lead paint shall be
classified to know whether they are hazardous to waste disposal restrictions. The contractor
shall provide the lead survey information with the appropriate training as per the OSHA
(Bailey, 2016). Pcb Caulking
The buildings shall be tested of polychlorinated biphenyls presence, and in case the
concentration of calking shall be more than or equal to 50 ppm, it shall be disposed of as
hazardous waste. Lamp ballasts
The ballasts have to be collected for disposal, and they shall be obtained by the EHS
hazardous materials management. During the process of accumulation, the barrels have to be
labeled and closed. Segregation of shall be done of the PCB and non PCB ballasts. Lamps and hid light bulbs
The handling of the bulbs shall be conducted in accordance by the EH & S, AND Those
containing mercury clearly labeled with specific phrases. Mercury switches
Most equipment contains mercury, and before they are disposed of, they should be collected
together to avoid any spillage of mercury. The devices in which they are collected should be
thoroughly sealed (Coelho & Brito, 2012). Batteries
The EH & S shall guide the handling of all the storage batteries which has hazardous metals
such as lead, mercury, cadmium, and silver. Specific phrases shall be used to label the
batteries during the process of accumulation. To prevent fires from occurring, bagging of the
small batteries shall be conducted. Chemicals
The materials which have been identified as being characterized with lead paint shall be
classified to know whether they are hazardous to waste disposal restrictions. The contractor
shall provide the lead survey information with the appropriate training as per the OSHA
(Bailey, 2016). Pcb Caulking
The buildings shall be tested of polychlorinated biphenyls presence, and in case the
concentration of calking shall be more than or equal to 50 ppm, it shall be disposed of as
hazardous waste. Lamp ballasts
The ballasts have to be collected for disposal, and they shall be obtained by the EHS
hazardous materials management. During the process of accumulation, the barrels have to be
labeled and closed. Segregation of shall be done of the PCB and non PCB ballasts. Lamps and hid light bulbs
The handling of the bulbs shall be conducted in accordance by the EH & S, AND Those
containing mercury clearly labeled with specific phrases. Mercury switches
Most equipment contains mercury, and before they are disposed of, they should be collected
together to avoid any spillage of mercury. The devices in which they are collected should be
thoroughly sealed (Coelho & Brito, 2012). Batteries
The EH & S shall guide the handling of all the storage batteries which has hazardous metals
such as lead, mercury, cadmium, and silver. Specific phrases shall be used to label the
batteries during the process of accumulation. To prevent fires from occurring, bagging of the
small batteries shall be conducted. Chemicals
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BUILDING AND CONSTRUCTION 11
Ll, the chemicals which are hazardous from the hospital facility shall be handled with a lot of
care shall follow the EH & S rules (Pillay, 2013). Electronics
The asset management shall coordinate the disposal of the electronic wastes
Ionizing smoke detectors
The smoke detectors which has ionizing detection radiation source shall be gathered together
and disposed under the guidelines of the EH & S.
Demolition work plan with site-specific methods of demolition to maintain structural
stability.
Activity Methods of demolition
Abandonment of utility procedures Geographic survey of the hospital
Procedures for Removal/characterization of
hazardous materials
Done by means of radiological surveys,
sampling, analysis as well as historical
knowledge
Identification of competent on-site
personnel
Analytical human resource process
Development of work procedure
Development of fire safety procedures Comprehensive development of fire safety
procedures as well as review
Removal of the debris procedures Done by means of visual inspection of the
place
Evaluation of the roadways Done by means of visual inspection of the
place
Ll, the chemicals which are hazardous from the hospital facility shall be handled with a lot of
care shall follow the EH & S rules (Pillay, 2013). Electronics
The asset management shall coordinate the disposal of the electronic wastes
Ionizing smoke detectors
The smoke detectors which has ionizing detection radiation source shall be gathered together
and disposed under the guidelines of the EH & S.
Demolition work plan with site-specific methods of demolition to maintain structural
stability.
Activity Methods of demolition
Abandonment of utility procedures Geographic survey of the hospital
Procedures for Removal/characterization of
hazardous materials
Done by means of radiological surveys,
sampling, analysis as well as historical
knowledge
Identification of competent on-site
personnel
Analytical human resource process
Development of work procedure
Development of fire safety procedures Comprehensive development of fire safety
procedures as well as review
Removal of the debris procedures Done by means of visual inspection of the
place
Evaluation of the roadways Done by means of visual inspection of the
place

BUILDING AND CONSTRUCTION 12
Demolition activities
Enacting the measures for the protection of
existing facilities and structures
Covering the existing debris
Hauling wastes in closed containers
Wetting demolition equipment
Application of water spray during handling
of debris and wastes
Isolation of utilities Locating combustive systems away
Maintaining good housekeeping
Allowing combustions systems to cool
before heating (Lockrey, 2018)
Demolition of the silos Use of hammer attachment
Demolition of low rise building additions Using a Cat 345 with shear attachment.
Demolition of high rise building additions Using a Cat 350 UHD track hoe with
shearer attachment
Public protection measures for adjoining public space along common boundaries
A written notice shall be served to every person within the hospital facility, beginning with
the hospital management. The owner of the hospital structure shall then protect as well
preserve the adjoining lot from any injury or damage. In the situation that damage to the
adjoining property seems imminent, the demolition process shall be halted immediately and
then continued at a later time when all the necessary measures have been put in place. As
soon as the demolition is done, the debris and the materials shall be removed with immediate
effect (Khalfan et al., 2018).
Before the demolition takes place:
The recommended pedestrian protection structures shall have been erected in
accordance with the theme: protection of the public, have been erected. The buildings which
Demolition activities
Enacting the measures for the protection of
existing facilities and structures
Covering the existing debris
Hauling wastes in closed containers
Wetting demolition equipment
Application of water spray during handling
of debris and wastes
Isolation of utilities Locating combustive systems away
Maintaining good housekeeping
Allowing combustions systems to cool
before heating (Lockrey, 2018)
Demolition of the silos Use of hammer attachment
Demolition of low rise building additions Using a Cat 345 with shear attachment.
Demolition of high rise building additions Using a Cat 350 UHD track hoe with
shearer attachment
Public protection measures for adjoining public space along common boundaries
A written notice shall be served to every person within the hospital facility, beginning with
the hospital management. The owner of the hospital structure shall then protect as well
preserve the adjoining lot from any injury or damage. In the situation that damage to the
adjoining property seems imminent, the demolition process shall be halted immediately and
then continued at a later time when all the necessary measures have been put in place. As
soon as the demolition is done, the debris and the materials shall be removed with immediate
effect (Khalfan et al., 2018).
Before the demolition takes place:
The recommended pedestrian protection structures shall have been erected in
accordance with the theme: protection of the public, have been erected. The buildings which
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 21
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.