Dental 2020 Project: CPM, Float Analysis & Critical Path Analysis
VerifiedAdded on 2023/06/12
|11
|768
|133
Project
AI Summary
This assignment provides a comprehensive CPM (Critical Path Method) and float analysis for the Dental 2020 project. It includes a detailed table of project activities with their durations, predecessors, early start (ES), early finish (EF), late start (LS), late finish (LF), and total float. The assignment identifies the critical path and presents a network diagram illustrating the project schedule, highlighting the critical activities. Additionally, the document references project management resources to support the analysis and findings, offering insights into project planning, scheduling, and control. This solved assignment is available on Desklib, where students can find similar resources and past papers.