This project focuses on enhancing the operational efficiency and effectiveness of Cocofina, a UK-based organization involved in manufacturing and supplying coconut products, through the implementation of digital technology. The project outlines its aims and objectives, which include analyzing the impact of digital technology, determining its role in creating good operations, and analyzing the implication of cloud computing. A project management plan is devised, covering aspects such as cost, scope, time, quality, communication, risk, and resources. The project employs both qualitative and quantitative research methods, including a questionnaire-based survey, to gather and analyze data. Recommendations are made based on the research findings, with a critical evaluation of the project management process and research methodologies. The project also reflects on the value of the research, the decision-making process, and changes to the initial project plan.

Managing a Successful Business Project
1
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
Introduction...........................................................................................................................................3
LO1.......................................................................................................................................................4
P1 Devise project aims and objectives for a chosen scenario............................................................4
P2 Produce a project management plan that covers aspects of cost, scope, time, quality,
communication, risk and resources M1, M2......................................................................................5
P3 Produce a work breakdown structure and a Gantt chart to provide timeframes and stages for
completion.........................................................................................................................................7
D1 critically evaluate the project management process and appropriate research methodologies
applied...............................................................................................................................................9
LO2.....................................................................................................................................................10
P4 Carry out small-scale research by applying qualitative and quantitative research methods
appropriate for meeting project aims and objectives........................................................................10
M2 Evaluate the accuracy and reliability of different research methods applied.............................13
LO3.....................................................................................................................................................14
P5 Analyse research and data using appropriate tools and techniques.............................................14
P6 Communicate appropriate recommendations as a result of research and data analysis to draw
valid and meaningful conclusions....................................................................................................17
M3 Evaluate the selection of appropriate tools and techniques for accuracy and authenticity to
support and justify recommendations..............................................................................................18
LO4.....................................................................................................................................................19
P7 Reflect on the value of undertaking the research to meet stated objectives and own learning and
performance.....................................................................................................................................19
M4 Evaluate the value of the project management process to meet the stated objectives and support
own learning and performance.........................................................................................................20
D2 Critically evaluate and reflect on the project outcomes, the decision making process and
changes or developments of the initial project management plan to support justification of
recommendations and learning during the project...........................................................................21
Conclusion...........................................................................................................................................22
References...........................................................................................................................................23
Appendix.............................................................................................................................................25
2
Introduction...........................................................................................................................................3
LO1.......................................................................................................................................................4
P1 Devise project aims and objectives for a chosen scenario............................................................4
P2 Produce a project management plan that covers aspects of cost, scope, time, quality,
communication, risk and resources M1, M2......................................................................................5
P3 Produce a work breakdown structure and a Gantt chart to provide timeframes and stages for
completion.........................................................................................................................................7
D1 critically evaluate the project management process and appropriate research methodologies
applied...............................................................................................................................................9
LO2.....................................................................................................................................................10
P4 Carry out small-scale research by applying qualitative and quantitative research methods
appropriate for meeting project aims and objectives........................................................................10
M2 Evaluate the accuracy and reliability of different research methods applied.............................13
LO3.....................................................................................................................................................14
P5 Analyse research and data using appropriate tools and techniques.............................................14
P6 Communicate appropriate recommendations as a result of research and data analysis to draw
valid and meaningful conclusions....................................................................................................17
M3 Evaluate the selection of appropriate tools and techniques for accuracy and authenticity to
support and justify recommendations..............................................................................................18
LO4.....................................................................................................................................................19
P7 Reflect on the value of undertaking the research to meet stated objectives and own learning and
performance.....................................................................................................................................19
M4 Evaluate the value of the project management process to meet the stated objectives and support
own learning and performance.........................................................................................................20
D2 Critically evaluate and reflect on the project outcomes, the decision making process and
changes or developments of the initial project management plan to support justification of
recommendations and learning during the project...........................................................................21
Conclusion...........................................................................................................................................22
References...........................................................................................................................................23
Appendix.............................................................................................................................................25
2

Introduction
This project is for United Kingdom based organisation Cocofina. This organisation is
involved in the practice of manufacturing and supplying of coconut water and coconut items.
This organisation is not having effective operations. This organisation is struggling for
making operations effective. With the implementation of digital technology the operations
can be made better. The implication of digital technology with the operations is studied in
this project. Aim and objectives for this project are decided. The implementation of the
relevant data and sources is accomplished for this project. After that a questionnaire is made
on which survey is accomplished from the selected population. Different respondents provide
different responses about the questions asked in the questionnaire. Further recommendations
are proposed for this project.
3
This project is for United Kingdom based organisation Cocofina. This organisation is
involved in the practice of manufacturing and supplying of coconut water and coconut items.
This organisation is not having effective operations. This organisation is struggling for
making operations effective. With the implementation of digital technology the operations
can be made better. The implication of digital technology with the operations is studied in
this project. Aim and objectives for this project are decided. The implementation of the
relevant data and sources is accomplished for this project. After that a questionnaire is made
on which survey is accomplished from the selected population. Different respondents provide
different responses about the questions asked in the questionnaire. Further recommendations
are proposed for this project.
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

LO1
P1 Devise project aims and objectives for a chosen scenario
Aim
The aim of the project is to enhance the efficiency and effectiveness of operations with the
help of digital technology. For the effective understanding we have taken Cocofina as an
organisation. This organisation is involved in providing different type of coconut product to
its customers. Thereis different type of operations better associated with this organisation like
manufacturing, supplying product to its customers. For the better understanding there can be
different objectives that can be decided for this project (Borgia, 2014). The different
objectives that are decided for this project will be helpful in the overall analysis.
There can be different type of objectives that can be possible for this assessment. The
different objectives are: -
Objectives
To analyse impact of digital technology in enhancing operations effectiveness of the
organisation.
To determine the role played by digital technology in creating good operations for the
organisation.
To analyse the implication of cloud computing which is a part of digital technology
for operations of organisation.
Project deliverables
There can be different type of project deliverables that can be the output because of this
project. One of the project deliverables will be the methods by which digital technology can
play a role in enhancing effectiveness and efficiency of operations of this organisation.
Another project deliverable will be the positive and negative aspect of digital technology on
the operations. The implication can provide a sustainable change or not is also the
deliverable.
4
P1 Devise project aims and objectives for a chosen scenario
Aim
The aim of the project is to enhance the efficiency and effectiveness of operations with the
help of digital technology. For the effective understanding we have taken Cocofina as an
organisation. This organisation is involved in providing different type of coconut product to
its customers. Thereis different type of operations better associated with this organisation like
manufacturing, supplying product to its customers. For the better understanding there can be
different objectives that can be decided for this project (Borgia, 2014). The different
objectives that are decided for this project will be helpful in the overall analysis.
There can be different type of objectives that can be possible for this assessment. The
different objectives are: -
Objectives
To analyse impact of digital technology in enhancing operations effectiveness of the
organisation.
To determine the role played by digital technology in creating good operations for the
organisation.
To analyse the implication of cloud computing which is a part of digital technology
for operations of organisation.
Project deliverables
There can be different type of project deliverables that can be the output because of this
project. One of the project deliverables will be the methods by which digital technology can
play a role in enhancing effectiveness and efficiency of operations of this organisation.
Another project deliverable will be the positive and negative aspect of digital technology on
the operations. The implication can provide a sustainable change or not is also the
deliverable.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

P2 Produce a project management plan that covers aspects of cost, scope, time, quality,
communication, risk and resources M1, M2
Project management plan is associated with different type of aspects that can have positive
and negative implication on the particular project. The success and failure of the particular
project depends on the different factors by which the particular project plan can be made.
Therefore it is necessary to make a particular project plan while considering all the below
factors which are as follows: -
Costs
The cost that will include in the particular project should be economicallynature. For the
particular activity a particular cost is decided. Therefore it is necessary to accomplish the
particular activity if they decided cost (Borgia, 2014). If the particular activity is going more
than the decided cost then it signifies the failure of the particular project.
Time
For the particular activity a time frame is decided. The time frame is divided for the particular
activity on the basis of deadlines of the particular activity. Therefore the particular activity
has to be delivered within the decided deadline. This can be accomplished only with the help
of implementing the activities on time. The wastage of the time is also included because of
agencies that can occur in the particular project.
Quality
It is very necessary for the particular project to be accomplished with good quality standards.
Is the particular project is followed with the activities that are of good qualities then the
accomplishment of the particular project will be in good quality (Johnston, et. al., 2015).
Effective communication with the stakeholders
Stakeholders are the main entity of the particular project. The supply of the different
resources is accomplished by the stakeholders only. In this project management plan
stakeholders are included in the important decision making. This can be beneficial for
accomplishing the particular project plan with the supply that is required and the necessary.
5
communication, risk and resources M1, M2
Project management plan is associated with different type of aspects that can have positive
and negative implication on the particular project. The success and failure of the particular
project depends on the different factors by which the particular project plan can be made.
Therefore it is necessary to make a particular project plan while considering all the below
factors which are as follows: -
Costs
The cost that will include in the particular project should be economicallynature. For the
particular activity a particular cost is decided. Therefore it is necessary to accomplish the
particular activity if they decided cost (Borgia, 2014). If the particular activity is going more
than the decided cost then it signifies the failure of the particular project.
Time
For the particular activity a time frame is decided. The time frame is divided for the particular
activity on the basis of deadlines of the particular activity. Therefore the particular activity
has to be delivered within the decided deadline. This can be accomplished only with the help
of implementing the activities on time. The wastage of the time is also included because of
agencies that can occur in the particular project.
Quality
It is very necessary for the particular project to be accomplished with good quality standards.
Is the particular project is followed with the activities that are of good qualities then the
accomplishment of the particular project will be in good quality (Johnston, et. al., 2015).
Effective communication with the stakeholders
Stakeholders are the main entity of the particular project. The supply of the different
resources is accomplished by the stakeholders only. In this project management plan
stakeholders are included in the important decision making. This can be beneficial for
accomplishing the particular project plan with the supply that is required and the necessary.
5

Risk
It is necessary that with a particular project different type of risk will be associated. For the
particular project to be accomplished on time different risk has to be taken by the project
manager (Treem&Leonardi,2013). Therefore mitigation of risk strategies can be implemented
so that risk minimization can be accomplished.
Scope
The scope of this project is quite wide. Good amount of data can be collected and then it can
be analysed in respect to the operation that is associated with the digital technology. The
implication of the digital technology can be understood well from this project.
Resources
The use of human resources is accomplished in the efficient manner. The population is
selected that particular population knows the digital technology very well. Another resource
is the information is gathered in the efficient way. This information can be used as the
sources are genuine in nature.
6
It is necessary that with a particular project different type of risk will be associated. For the
particular project to be accomplished on time different risk has to be taken by the project
manager (Treem&Leonardi,2013). Therefore mitigation of risk strategies can be implemented
so that risk minimization can be accomplished.
Scope
The scope of this project is quite wide. Good amount of data can be collected and then it can
be analysed in respect to the operation that is associated with the digital technology. The
implication of the digital technology can be understood well from this project.
Resources
The use of human resources is accomplished in the efficient manner. The population is
selected that particular population knows the digital technology very well. Another resource
is the information is gathered in the efficient way. This information can be used as the
sources are genuine in nature.
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

P3 Produce a work breakdown structure and a Gantt chart to provide timeframes and
stages for completion
Activities Duration ( in Weeks) Specification
Project Selection Week 1 Selection of the topic is
accomplished in this part.
Designing of questionnaire Week 2 Different questions that are
associated with selected topic
are made.
Data collection Week 3 Data is collected from the
different respondents
(Treem&Leonardi, 2013).
Data analysis Week 4 Data is analysed graphically.
Methodology Week 5-6 Qualitative and quantitative
methodology is used for
Analysis of data in the
efficient way.
Completion Week 7 The accomplishing of the
project is done.
7
stages for completion
Activities Duration ( in Weeks) Specification
Project Selection Week 1 Selection of the topic is
accomplished in this part.
Designing of questionnaire Week 2 Different questions that are
associated with selected topic
are made.
Data collection Week 3 Data is collected from the
different respondents
(Treem&Leonardi, 2013).
Data analysis Week 4 Data is analysed graphically.
Methodology Week 5-6 Qualitative and quantitative
methodology is used for
Analysis of data in the
efficient way.
Completion Week 7 The accomplishing of the
project is done.
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Activity/Week Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
Project Selection
Designing of questionnaire
Data collection
Data analysis
Methodology
Completion
8
Project Selection
Designing of questionnaire
Data collection
Data analysis
Methodology
Completion
8

D1 critically evaluate the project management process and appropriate research
methodologies applied.
The planning controlling and monitoring of the management project plan is accomplished in
the effective manner. The qualitative and quantitative methodologies that are used for this
project management plan makes this project management plan informative in
nature(Johnston, et. al., 2015). There can be the situation in which the negative result can be
output all the methods that are implemented in this project plan. It can be understood as the
responses collected from the different respondents may be not responsive answer. It totally
depends on the choice of the particular respondent that he or she is giving an answer.
Therefore it can be said that there are the positive as well as negative results that can be
obtained while implementing the different process and methodologies in this project plan.
9
methodologies applied.
The planning controlling and monitoring of the management project plan is accomplished in
the effective manner. The qualitative and quantitative methodologies that are used for this
project management plan makes this project management plan informative in
nature(Johnston, et. al., 2015). There can be the situation in which the negative result can be
output all the methods that are implemented in this project plan. It can be understood as the
responses collected from the different respondents may be not responsive answer. It totally
depends on the choice of the particular respondent that he or she is giving an answer.
Therefore it can be said that there are the positive as well as negative results that can be
obtained while implementing the different process and methodologies in this project plan.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

LO2
P4 Carry out small-scale research by applying qualitative and quantitative research
methods appropriate for meeting project aims and objectives.
There is the use of qualitative as well as Quantitative approach. For the particular project plan
to be accomplished qualitative and quantitative approaches are used. The different approach
is having a different perspective and methodology. The data collection is different in
qualitative and Quantitative approach (Baller, et. al., 2016).
In the qualitative method the data is collected from the different sources that are available at
the time of project. The data is collected from the relevant sources. The data is collected from
the internet sources, news article, journals and books. The inclusion of the relevant data and
sources makes the whole project genuine nature (Van Dijck, 2013). This also impacts
positively on the research that is being accomplished for this project.
In the quantitative method different views of the different people are included. A population
is selected. That population is selected which better knows the topic of digitalization and
digital technology. Non-inclusion of the people that do not know about the digital technology
is the good step that is taken for this particular project plan to be implemented in the effective
way. Different respondents in the population responded differently. It is the thinking of a
particular individual on which the responses of the particular individual depends. These
responses can be very beneficial in effective implementation of a particular project (Bernard,
2017). These are the primary sources that are included as an evidence for this project
management plan. These evidences can be very useful in the effective implementation of the
project management plan for Cocofina.
Sampling is divided into two parts which is probabilistic and non probabilistic. In the non-
probabilistic a sample is taken on the non random basis. In probabilistic sampling the sample
is taken as randomly.
Benefits of this project management practices
This is the cost effective method that can be used for the particular project
management plan.
10
P4 Carry out small-scale research by applying qualitative and quantitative research
methods appropriate for meeting project aims and objectives.
There is the use of qualitative as well as Quantitative approach. For the particular project plan
to be accomplished qualitative and quantitative approaches are used. The different approach
is having a different perspective and methodology. The data collection is different in
qualitative and Quantitative approach (Baller, et. al., 2016).
In the qualitative method the data is collected from the different sources that are available at
the time of project. The data is collected from the relevant sources. The data is collected from
the internet sources, news article, journals and books. The inclusion of the relevant data and
sources makes the whole project genuine nature (Van Dijck, 2013). This also impacts
positively on the research that is being accomplished for this project.
In the quantitative method different views of the different people are included. A population
is selected. That population is selected which better knows the topic of digitalization and
digital technology. Non-inclusion of the people that do not know about the digital technology
is the good step that is taken for this particular project plan to be implemented in the effective
way. Different respondents in the population responded differently. It is the thinking of a
particular individual on which the responses of the particular individual depends. These
responses can be very beneficial in effective implementation of a particular project (Bernard,
2017). These are the primary sources that are included as an evidence for this project
management plan. These evidences can be very useful in the effective implementation of the
project management plan for Cocofina.
Sampling is divided into two parts which is probabilistic and non probabilistic. In the non-
probabilistic a sample is taken on the non random basis. In probabilistic sampling the sample
is taken as randomly.
Benefits of this project management practices
This is the cost effective method that can be used for the particular project
management plan.
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

The practical information can also be availed in the easy manner with the help of this
project management plan (Sundararajan, 2014).
Results can also be achieved in the efficient manner with the help of methods
included in this project management plan.
Drawbacks of this project management practices
Lack of careful responses is the output from the server that is conducted with a
particular population.
It is the time consuming approach.
There can be the situation in which dishonest responses can be collected from the
respondents.
11
project management plan (Sundararajan, 2014).
Results can also be achieved in the efficient manner with the help of methods
included in this project management plan.
Drawbacks of this project management practices
Lack of careful responses is the output from the server that is conducted with a
particular population.
It is the time consuming approach.
There can be the situation in which dishonest responses can be collected from the
respondents.
11

Questionnaire
Question 1 Is it necessary to implement digital technology for the operations of the company?
a) Yes
b) No
Question 2 Is the Cocofina able to utilise the digital technology for its operation?
a) Yes
b) No
Question 3 Can digital technology be helpful in making operations efficient for company like
Cocofina?
a) Yes
b) No
Question 4 Is cloud computing playing an important role for the operation by the means of
digital technology?
a) Yes
b) No
Question 5 Will effective implementation of digital technology resolve the issues associated
with operations in companies like Cocofina?
a) Agree
b) Not agree
12
Question 1 Is it necessary to implement digital technology for the operations of the company?
a) Yes
b) No
Question 2 Is the Cocofina able to utilise the digital technology for its operation?
a) Yes
b) No
Question 3 Can digital technology be helpful in making operations efficient for company like
Cocofina?
a) Yes
b) No
Question 4 Is cloud computing playing an important role for the operation by the means of
digital technology?
a) Yes
b) No
Question 5 Will effective implementation of digital technology resolve the issues associated
with operations in companies like Cocofina?
a) Agree
b) Not agree
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 27
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.