Project Charter: E-Ticket for the Grand Show, RALS University
VerifiedAdded on  2020/03/23
|17
|1565
|183
Project
AI Summary
This project charter outlines the development of an online e-ticket system for the RALS organization, aiming to replace its manual ticketing process for its annual show. The project scope includes defining requirements, deliverables, and resource allocation, as well as scope management, risk analysis, and quality management plans. The charter details the project's objectives, including reducing workload, increasing revenue, and improving the customer experience. It includes project management outputs like Work Breakdown Structure, Gantt charts, and risk assessments. The project also includes a quality management plan and a project closure checklist. The project's success will be evaluated based on various metrics, including on-time delivery, customer satisfaction, and financial targets, ensuring the project's alignment with the organization's strategic goals.

Name of University
Assessment 3 ICT Project Management
Project Charter
Student’s Name
9/30/2017
Assessment 3 ICT Project Management
Project Charter
Student’s Name
9/30/2017
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project Charter: E-Ticket for the Grand Show (RALS)
Table of Content
Part One...........................................................................................................................................2
Part Two...........................................................................................................................................3
Part Three.........................................................................................................................................4
Part Four..........................................................................................................................................5
Part Five...........................................................................................................................................7
Part Six.............................................................................................................................................9
Appendix........................................................................................................................................10
References......................................................................................................................................11
Page 1 of 17
Table of Content
Part One...........................................................................................................................................2
Part Two...........................................................................................................................................3
Part Three.........................................................................................................................................4
Part Four..........................................................................................................................................5
Part Five...........................................................................................................................................7
Part Six.............................................................................................................................................9
Appendix........................................................................................................................................10
References......................................................................................................................................11
Page 1 of 17

Project Charter: E-Ticket for the Grand Show (RALS)
Part One
Project Description: A show is organized during November every year for three days by the
RALS organization where they demonstrate their farming and lifestyle appliances. For this show,
tickets are sold and the earnings are given to the ICV, a charitable trust for indigenous people.
The ticket reserving system is manual, leading to overcrowding by people and some of them
even break the fence for getting inside the boundary without buying tickets, so RALS thought of
changing its manual ticket reserving system to online ticket reserving system and gave the
project to Virtucon.
Area of Impact:
Rank 1 - Customer: The customers will be happier now as they no longer will have to stand
outside in the long line for buying tickets.
Rank 2 - Operational: The division of tickets among the customers will become simpler and
easier than before.
Rank 3 – Finance: More tickets will be sold increasing the financial condition.
Rank 4 – Strategy: RALS will be able to give more money to the ICV as more and more tickets
will be sold.
Rank 5 – Social: RALS will be able to show more social concerns by giving more money to ICV
as more tickets will be sold
Project value:
Value 1 (Faster): Because the tickets will be booked before the beginning of show online, this
will reduce the load on the ticket counter.
Value 2 (Do more): The positive results will encourage RALS to develop more and expand the
show.
Page 2 of 17
Part One
Project Description: A show is organized during November every year for three days by the
RALS organization where they demonstrate their farming and lifestyle appliances. For this show,
tickets are sold and the earnings are given to the ICV, a charitable trust for indigenous people.
The ticket reserving system is manual, leading to overcrowding by people and some of them
even break the fence for getting inside the boundary without buying tickets, so RALS thought of
changing its manual ticket reserving system to online ticket reserving system and gave the
project to Virtucon.
Area of Impact:
Rank 1 - Customer: The customers will be happier now as they no longer will have to stand
outside in the long line for buying tickets.
Rank 2 - Operational: The division of tickets among the customers will become simpler and
easier than before.
Rank 3 – Finance: More tickets will be sold increasing the financial condition.
Rank 4 – Strategy: RALS will be able to give more money to the ICV as more and more tickets
will be sold.
Rank 5 – Social: RALS will be able to show more social concerns by giving more money to ICV
as more tickets will be sold
Project value:
Value 1 (Faster): Because the tickets will be booked before the beginning of show online, this
will reduce the load on the ticket counter.
Value 2 (Do more): The positive results will encourage RALS to develop more and expand the
show.
Page 2 of 17
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Project Charter: E-Ticket for the Grand Show (RALS)
Metrics with target:
Metrics Target
Reduce the workload in the ticket counter and the security gate to
decrease the number of volunteers.
During the show in
November
Start of revenue production before the start of show Before the start of
show in November
After the implementation of the project in the first year the increase in
money gathering and donation to ICV by 15%.
After the show in
November
Development in the volume of selling tickets every year before the
beginning of the show in November.
After the show in
November
Part Two
Scope Management Plan
Define Scope: The aim of this project is to transform its manual ticket reserving system to online
ticket reserving system to decrease the working load among the volunteers in the ticket counter
and main gate.
Identify requirements: Customer ID proof for registration, unveiled ID with a scanner tag for
recognizing its visitors, should be safe from computer-based crimes, should be straightforward to
be used from any electronic gadgets.
In-Scope: While working on the online ticket reserving system, a different user ID, accessible
and a scanner tag with all volunteers are required to be there.
Out-of-Scope: all the required support beyond the 10 working days after the test and
implementation is done. That is training beyond 10 days, maintenance support beyond 10 days.
Deliverables: Everything as per the requirements of the associates should be contained in the
ticketing framework which will be simple, satisfactory and legal.
Page 3 of 17
Metrics with target:
Metrics Target
Reduce the workload in the ticket counter and the security gate to
decrease the number of volunteers.
During the show in
November
Start of revenue production before the start of show Before the start of
show in November
After the implementation of the project in the first year the increase in
money gathering and donation to ICV by 15%.
After the show in
November
Development in the volume of selling tickets every year before the
beginning of the show in November.
After the show in
November
Part Two
Scope Management Plan
Define Scope: The aim of this project is to transform its manual ticket reserving system to online
ticket reserving system to decrease the working load among the volunteers in the ticket counter
and main gate.
Identify requirements: Customer ID proof for registration, unveiled ID with a scanner tag for
recognizing its visitors, should be safe from computer-based crimes, should be straightforward to
be used from any electronic gadgets.
In-Scope: While working on the online ticket reserving system, a different user ID, accessible
and a scanner tag with all volunteers are required to be there.
Out-of-Scope: all the required support beyond the 10 working days after the test and
implementation is done. That is training beyond 10 days, maintenance support beyond 10 days.
Deliverables: Everything as per the requirements of the associates should be contained in the
ticketing framework which will be simple, satisfactory and legal.
Page 3 of 17
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project Charter: E-Ticket for the Grand Show (RALS)
List of Resources:
People: Project Manager, Network Specialist, Web-page Designer, Database Manager
Technology: Network system to connect all the PCs, Printer connected with Wi-Fi system
Facilities: Office set-up for the team members
Others: Tour, Training
Part Three
MS Project Outputs (Screenshots)
Work Breakdown Structure: (Wrike, 2017)
Page 4 of 17
List of Resources:
People: Project Manager, Network Specialist, Web-page Designer, Database Manager
Technology: Network system to connect all the PCs, Printer connected with Wi-Fi system
Facilities: Office set-up for the team members
Others: Tour, Training
Part Three
MS Project Outputs (Screenshots)
Work Breakdown Structure: (Wrike, 2017)
Page 4 of 17

Project Charter: E-Ticket for the Grand Show (RALS)
Page 5 of 17
Page 5 of 17
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Project Charter: E-Ticket for the Grand Show (RALS)
Milestone List:
Activities & its associated Resources:
Page 6 of 17
Milestone List:
Activities & its associated Resources:
Page 6 of 17
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project Charter: E-Ticket for the Grand Show (RALS)
Activities & its Costs:
Page 7 of 17
Activities & its Costs:
Page 7 of 17

Project Charter: E-Ticket for the Grand Show (RALS)
Page 8 of 17
Page 8 of 17
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Project Charter: E-Ticket for the Grand Show (RALS)
High-Level Cost Estimates (Bottom-up estimation): (DOE, 2017) (Pmbook, 2017)
Gantt chart: (ProjectManager, 2017) (Gantt, 2017)
Page 9 of 17
High-Level Cost Estimates (Bottom-up estimation): (DOE, 2017) (Pmbook, 2017)
Gantt chart: (ProjectManager, 2017) (Gantt, 2017)
Page 9 of 17
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project Charter: E-Ticket for the Grand Show (RALS)
Part Four
Assumptions
Budget is not an issue for the Project
Resources shall be always available throughout the project, so no issue with their
availability
Stakeholders are well identified and need not worry about their analysis, as Virtucon is a
longtime consultant of Globex
Volunteers are well qualified so that they can be trained after the implementation of
computerized ticketing system
Risk Analysis (Institute of Risk Management, 2016) (ThreatsAndOpportunities, 2017)
(WordPress, 2009)
RISK
No.
Description Probability Impact Product
of P & I
Rank Owner Response /
Mitigation
Plan
1 During initiation
stage: non-
recognition of
50% 90% 45% 1 PM proper
identification
of
Page 10 of 17
Part Four
Assumptions
Budget is not an issue for the Project
Resources shall be always available throughout the project, so no issue with their
availability
Stakeholders are well identified and need not worry about their analysis, as Virtucon is a
longtime consultant of Globex
Volunteers are well qualified so that they can be trained after the implementation of
computerized ticketing system
Risk Analysis (Institute of Risk Management, 2016) (ThreatsAndOpportunities, 2017)
(WordPress, 2009)
RISK
No.
Description Probability Impact Product
of P & I
Rank Owner Response /
Mitigation
Plan
1 During initiation
stage: non-
recognition of
50% 90% 45% 1 PM proper
identification
of
Page 10 of 17

Project Charter: E-Ticket for the Grand Show (RALS)
stakeholders accomplices
and
rechecking
the summary
of the project
after every
change is the
must
2 During planning
Stage: increase in
scope of work
because of wrong
requirement
finalization of
stakeholders
40% 90% 36% 3 PM
&
NS
Once
associates
clear
evidence is
done suitably
they should
be examined
as necessities
be
3 During execution
stage: inappropriate
management of
work by the
stakeholders can
lead to many
problems in the
project.
50% 80% 40% 2 PM Before
concluding
anything all
the
recognized
essentials are
required to
be discussed
4 During monitoring
& controlling stage:
scope may get
increase due to non-
finalization of
requirement
40% 70% 28% 4 PM,
NS,
WD
&
DM
An expert
study like
degree check
methodology
should be
done in each
Page 11 of 17
stakeholders accomplices
and
rechecking
the summary
of the project
after every
change is the
must
2 During planning
Stage: increase in
scope of work
because of wrong
requirement
finalization of
stakeholders
40% 90% 36% 3 PM
&
NS
Once
associates
clear
evidence is
done suitably
they should
be examined
as necessities
be
3 During execution
stage: inappropriate
management of
work by the
stakeholders can
lead to many
problems in the
project.
50% 80% 40% 2 PM Before
concluding
anything all
the
recognized
essentials are
required to
be discussed
4 During monitoring
& controlling stage:
scope may get
increase due to non-
finalization of
requirement
40% 70% 28% 4 PM,
NS,
WD
&
DM
An expert
study like
degree check
methodology
should be
done in each
Page 11 of 17
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 17
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.