Project Cost Analysis, Performance, and Schedule Analysis Report
VerifiedAdded on 2021/06/14
|2
|252
|2
Project
AI Summary
This assignment provides a detailed analysis of project costs, schedule, and performance using earned value management (EVM) techniques. The analysis includes the calculation of key metrics such as Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI), and Cost Performance Index (CPI). The assignment utilizes a case study with a total project budget of £2,10,000 and a planned duration of 12 weeks. Data is analyzed after 6 weeks, calculating the planned value (PV), earned value (EV), and actual cost (AC). The report also estimates the cost at completion (EAC) and the estimated time to complete the project, based on the calculated performance indices. References to relevant literature are included to support the analysis, providing a comprehensive overview of project performance evaluation using EVM.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
1 out of 2