The reflection focuses on the adherence to ethical principles, compliance with safety standards, and attention to health, safety, and environmental considerations in multiple engineering projects. It highlights key experiences from three career episodes (CE 1.2.3, CE 1.3.3, CE 1.4.1; CE 2.2.3, CE 2.3.5, CE 2.4.2; CE 3.3.3, CE 3.4), demonstrating how these principles have been applied practically to ensure responsible and effective project outcomes. The reflection underscores the importance of ethical conduct in professional engineering practice and its impact on project success and sustainability.
Document Page
SUMMARY STATEMENT
Competency Element A brief summary of how you
have applied the element
Paragraph in the
career episode(s)
where the element is
addressed
PE1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive, theory-
based understanding of the
underpinning natural and
physical sciences and the
engineering fundamentals
applicable to the engineering
discipline
I. This project was based on the
design and development of Wyndham
Hotel in KAFD.
II. This project was based on the
design and development of the
Security Head Quarters of Riyadh in
Saudi Arabia.
III. This project was mainly based on
the development of 6 kilometers road
starting from intersection of Abu
Bakr Al-Siddiq Road with Thumama
Road up to the King Salman Road.
Career Episode 1: CE
1.2.1
Career Episode 2: CE
2.2.1
Career Episode 3: CE
3.2.1
PE1.2 Conceptual understanding of
the mathematics, numerical
analysis, statistics and
computer and information
sciences which underpin the
engineering discipline
I. In this project, in order to exhibit
my conceptual understanding, I
analyzed and designed the floor plan
for the hotel along with the internal
courtyard, external courtyard, lobby
and external pathway.
II. I had followed the ARC and ID
drawing for the process of
implementing the electrical systems.
III. I was responsible for the
preparation of the NCOs if required. I
had to read and reply on the site
instructions received from the
consultant.
Career Episode 1: CE
1.2.3, CE 1.3.2
Career Episode 2: CE
2.2.3, CE 2.3.2
Career Episode 3: CE
3.2.3, CE 3.3.2
PE1.3 In-depth understanding of
specialist bodies of
knowledge within the
I. After the development of the
electrical plan using the AutoCAD
Career Episode 1: CE
1.3.3
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1SUMMARY STATEMENT
engineering discipline
software, I reviewed it with my
project manager.
II. I was responsible for the
modification of electrical drawings as
per the site conditions and following
the client’s requirements.
III. I had worked with my team to
provide the client with the best
quality work for the project.
Career Episode 2: CE
2.3.3
Career Episode 3: CE
3.3.3
PE1.4 Discernment of knowledge
development and research
directions within the
engineering discipline
I. While working as an Electrical
Engineer in this project, I had the
main objectives for developing and
preparing the electrical plan for each
of the floor for the five start hotel of
KAFD.
II. Before the start of the project I had
first compiled my team of workers
which consist of 5 foremen and 25
labours.
III. I was responsible for looking after
the necessary communications
devices like traffic lights, inductive
loops, CCTV cameras, lighting,
electric and power systems.
Career Episode 1: CE
1.2.2
Career Episode 2: CE
2.2.2
Career Episode 3: CE
3.2.2
Document Page
2SUMMARY STATEMENT
PE1.5 Knowledge of contextual
factors impacting the
engineering discipline
I. In the pathway of the hotel exterior
and the rooftop courtyard, I have
planned to integrate a solar power
system for sourcing the lighting.
II. I followed all electrical and
telecommunication material usage
guidelines that were based on BOQ
and project specification.
III. I had also provided all the
coordination works with project
utilities departments: Structural,
Mechanical and Landscaping and
Infra-structure.
Career Episode 1: CE
1.3.5
Career Episode 2: CE
2.3.5
PE1.6 Understanding of the scope,
principles, norms,
accountabilities and bounds of
contemporary engineering
practice in the specific
discipline
I. I have separated the sensors of each
floor and separated the fire detection
system in the hotel.
II. I had conducted meetings to make
my team mates understand the
working procedure of the project and
the work that was to be put in each of
the departments.
III. For the completion of the project I
had coordinated with the Government
authorities for the clearing of site
related problems.
Career Episode 1: CE
1.3.1, CE 1.3.4
Career Episode 2: CE
2.3.1 and CE 2.3.4 and
Career Episode 3: CE
3.3.1 and CE 3.3.4
PE2.1 Application of established
engineering methods to
complex engineering problem
solving
I. I have communicated with the
project manager to discuss this issue.
II. Technical specification helped me
to prepare the prequalification and
material submittal for all electrical
work.
Career Episode 1: CE
1.2.4, CE 1.3.1 and CE
1.4.2 and Career
Episode 2: CE 2.3.3, CE
2.3.4 and CE 2.4.1, CE
2.4.2 and Career
Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.4.2
Document Page
3SUMMARY STATEMENT
III. I had supervised all electrical
works and make sure that it is
installed as the technical
specifications.
PE2.2 Fluent application of
engineering techniques, tools
and resources
I. After the development of the
electrical plan using the AutoCAD
software, I reviewed it with my
project manager.
II. I had implemented the Lighting
systems, powering system, A/V
system, security systems, MATV
System, Fire Detection system,
Telephone system, including all the
required coordination with all
assigned subcontractors.
III. I reviewed the grounding
calculations done by FURSE and
make sure that by using 1.2 meter
copper rods and 95mm bare copper
cable the resistivity will not be
greater than 2 ohms as per
specification
Career Episode 1: CE
1.3.3, CE 1.3.2 and CE
1.3.1
Career Episode 2: CE
2.3.1, CE 2.3.2 and CE
2.3.3 and Career
Episode 3: CE 3.3.1, CE
3.3.2 and CE 3.3.3
PE2.3 Application of systematic
engineering synthesis and
design processes
I. I have observed that the activation
of the sprinklers at one floors initiated
activation in all the other floors.
II. I had followed all Electrical (High
Current) and Telecommunication
(Low Current) works in the two sites
where I was working for the project.
III. For the completion of the project I
had coordinated with the Government
authorities for the clearing of site
related problems.
Career Episode 1: CE
1.2.3, CE 1.3.1 and CE
1.3.2
Career Episode 2: CE
2.3.3 and CE 2.3.4
Career Episode 3: CE
3.2.2
PE2.4 Application of systematic
approaches to the conduct and
management of engineering
projects
I. I have always remained wary of the
cost consideration issue in each of my
projects.
II. I have also regularly attended
meetings for the discussion of my
project issues with my supervisors as
well as team mates.
III. Besides, I have always remained
mindful about the specific
Career Episode 1: CE
1.3.1 and CE 1.3.2
Career Episode 3: CE
2.2.3, CE 2.3.1, CE 2.3.2
and CE 2.3.3
Career Episode 3: CE
3.3.1 and CE 3.3.2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4SUMMARY STATEMENT
requirements of the clients,
specifications of the stakeholders and
any kind of regulation applicable in
any of my projects.
PE3.1 Ethical conduct and
professional accountability
I. I have tried my best to stick to the
ethical principles of electrical
engineering.
II. I have also complied with the local
and national safety standards
applicable to my project.
III. I also have focused on health,
safety and environmental parameters
while accomplishing my projects.
Career Episode 1: CE
1.2.3, CE 1.3.3 and CE
1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and CE
2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.2 Effective oral and written
communication in
professional and lay domains
I. I am highly proficient in the oral
and written usage of the English
language.
II. I do possess effective writing skills
as I have already documented the
project reports and presentations.
Career Episode 1: CE
1.2.3, CE 1.3.3 and CE
1.4.1
Career Episode 2: CE
2.2.3, CE 2.3.5 and CE
2.4.2
Career Episode 3: CE
3.3.3, CE 3.4
PE3.3 Creative innovative and
proactive demeanor
I. I have creatively applied alternative
concepts in my work in projects.
II. I have always been able to adopt
novel approaches while solving
challenges in my projects.
Career Episode 1: CE
1.3, CE 1.4 and CE 1.4.2
and Career Episode 2:
CE 2.3, CE 2.4, CE
2.2.5 and CE 2.4.2 and
Career Episode 3: CE
3.2, CE 3.3
PE3.4 Professional use and
management of information I. I can easily gather, assess and
utilize necessary information and data
which are important for the
accomplishment of the project
objectives.
II. At the same time, I have always
documented project reports as well as
Career Episode 1: CE
1.2.3, CE 1.2.5, CE 1.4.2
and Career Episode 2:
CE 2.2.3, CE 2.2.5, CE
2.4.2 and Career
Episode 3: CE 3.2.3, CE
3.2.5, CE 3.4.2
Document Page
5SUMMARY STATEMENT
updates on a regular basis.
PE3.5 Orderly management of self,
and professional conduct
I. I have always managed my own
and team’s time to finish my project
objectives.
II. I have been able to gain much
technical expertise as well as
technical proficiency while
implementing each of the engineering
projects.
Career Episode 1: CE
1.4.2, CE 1.3.1 and CE
1.3.2
Career Episode 2: CE
2.4.2, CE 2.3.2, CE 2.3.3
and CE 2.3.4 and Career
Episode 3: CE 3.4.2, CE
3.3.1 and CE 3.3.2
PE3.6 Effective team membership
and team leadership
I. I understand the fundamentals of
team dynamics and communicate
with my management and other team
members.
Career Episode 1: CE
1.4.1, CE 1.4.2,
Career Episode 2: CE
2.4.1 and CE 2.4.2
Career Episode 3: CE
3.4.1 and CE 3.4.2
chevron_up_icon
1 out of 6
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]