MIS732 - Reflection on IS Practice and Group Performance Analysis
VerifiedAdded on  2022/10/19
|7
|1938
|182
Report
AI Summary
This report is a reflection on a student's experience in an Information Systems (IS) practice assignment, specifically focusing on the development of an enterprise architecture for BlueParcel. The student analyzes the group's performance and operations using the six ISO 38500 Principles (Responsibility, Strategy, Acquisition, Performance, Conformance, and Human behavior), highlighting responsibilities, communication strategies, and the impact of group dynamics. The report details the student's individual contributions, including network design and security considerations. It explores the impact of the group work on learning about enterprise architectures and governance, including insights into information governance and the application of new technologies. The reflection concludes with lessons learned for future IS practices, emphasizing the importance of continuous learning, project governance, and leadership within IT projects. The student utilizes the 4R's Reflection model (Report, Relate, Reason, Reconstruct) to structure the analysis, drawing on documented group activities and deliverables to support the findings.

Running head: REFLECTION ON IS PRACTICE
REFLECTION ON IS PRACTICE
Name of the student
Name of the university
Author note
REFLECTION ON IS PRACTICE
Name of the student
Name of the university
Author note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
REFLECTION ON IS PRACTICE
Table of Contents
Introduction................................................................................................................................2
Report:........................................................................................................................................2
Reflection on the group performance and operations:...........................................................2
Relate:........................................................................................................................................3
Own individual contribution:.................................................................................................3
Reason:.......................................................................................................................................4
Impact of the group work for learning about enterprise architectures and governance:........4
Reconstruct:................................................................................................................................5
Lessons for the future IS practice:.........................................................................................5
Conclusions:...............................................................................................................................5
References:.................................................................................................................................6
REFLECTION ON IS PRACTICE
Table of Contents
Introduction................................................................................................................................2
Report:........................................................................................................................................2
Reflection on the group performance and operations:...........................................................2
Relate:........................................................................................................................................3
Own individual contribution:.................................................................................................3
Reason:.......................................................................................................................................4
Impact of the group work for learning about enterprise architectures and governance:........4
Reconstruct:................................................................................................................................5
Lessons for the future IS practice:.........................................................................................5
Conclusions:...............................................................................................................................5
References:.................................................................................................................................6

2
REFLECTION ON IS PRACTICE
Introduction:
In the view of developing the enterprise architecture for BlueParcel, the aim was to work in a
group or a team and execute the plan according to the business requirements. In case of group
works, it is always important to have significant contribution of own skills and experiences.
In this project of information system, it was important to take the respective responsibilities
on completing each phase of developing the enterprise architecture (Balan, Yuen and
Mehrtash 2019). Therefore; it was also a learning experience while working with others and
by sharing the knowledge with each other during the project. This helps in gaining the
significant knowledge about the enterprise system architecture.
In this report, a reflection will be provided regarding the learning experience from the group
work in the project and own learn outcomes will be highlighted as well. This will be
conducted by using 4R’s Reflection model.
Report:
Reflection on the group performance and operations:
This reflection will be made by using six ISO 38500 Principles:
Responsibility: In the process of developing the enterprise architecture, it was always
important to take the individual responsibilities. I was given the responsibility of designing
the network for the enterprise system. Similarly, other members were given the tasks
according to their respective skills. It was also a responsibility of the team members to share
and transfer the knowledge with each other (Aga, Noorderhaven and Vallejo 2016). This was
necessary in order to ensure coordination and trust among the members of the group.
Accountability in this regard is extremely essential to play the role of an IS. This helps in
sharing and managing the information effectively. In case of this project, the project manager
was responsible for accountability. I learnt how such responsibility is maintained with
perfection.
Strategy: There were a number of strategies that were implemented by our group in order to
maintain the communication between us and with the CEO of BlueParcel. Cloud discussions
have been the effective method of communication through which it was possible to
implement the cloud services according to the requirements of the company. Along with this,
REFLECTION ON IS PRACTICE
Introduction:
In the view of developing the enterprise architecture for BlueParcel, the aim was to work in a
group or a team and execute the plan according to the business requirements. In case of group
works, it is always important to have significant contribution of own skills and experiences.
In this project of information system, it was important to take the respective responsibilities
on completing each phase of developing the enterprise architecture (Balan, Yuen and
Mehrtash 2019). Therefore; it was also a learning experience while working with others and
by sharing the knowledge with each other during the project. This helps in gaining the
significant knowledge about the enterprise system architecture.
In this report, a reflection will be provided regarding the learning experience from the group
work in the project and own learn outcomes will be highlighted as well. This will be
conducted by using 4R’s Reflection model.
Report:
Reflection on the group performance and operations:
This reflection will be made by using six ISO 38500 Principles:
Responsibility: In the process of developing the enterprise architecture, it was always
important to take the individual responsibilities. I was given the responsibility of designing
the network for the enterprise system. Similarly, other members were given the tasks
according to their respective skills. It was also a responsibility of the team members to share
and transfer the knowledge with each other (Aga, Noorderhaven and Vallejo 2016). This was
necessary in order to ensure coordination and trust among the members of the group.
Accountability in this regard is extremely essential to play the role of an IS. This helps in
sharing and managing the information effectively. In case of this project, the project manager
was responsible for accountability. I learnt how such responsibility is maintained with
perfection.
Strategy: There were a number of strategies that were implemented by our group in order to
maintain the communication between us and with the CEO of BlueParcel. Cloud discussions
have been the effective method of communication through which it was possible to
implement the cloud services according to the requirements of the company. Along with this,
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
REFLECTION ON IS PRACTICE
meetings were held between the group members as well with the CEO of the company.
Strategies were made regarding the deliberation process.
Acquisition: The acquisition was made with the experience on implementing the project. This
means that the group members were active on communicating the result of each phase of the
project. Further with the help of communication with the CEO, it was possible to learn about
the requirements and thee probable outputs that were expected by the company from the
project (Lee, Park and Lee 2015). The deliverables were also identified by continuous
learning process through the project.
Performance: The goal of the group was to involve the improving the performance of the
individuals associated with the project and the overall enterprise system. In this process,
performance criteria were set and thee group members gave continuous efforts for meeting
with those criteria.
Conformance: Throughout the project, compliances and the standards of project management
were maintained. In this regard, the project manager took the responsibility for making all the
members aware of the compliances which were required to be followed. The ethics on team
work and project development were also maintained by all the group members with success.
Human behaviour: For a group project, thee human behaviour impacts its success
significantly (Mueller 2015). In this project, although the behaviour of different members was
different, however; a team goal and team culture was set which helped us to focus on the
similar vision throughout the project. This contributed to the individual success and the
success of the overall project.
Relate:
Own individual contribution:
As a group member, I was given the responsibility to share and use my own skills for
ensuring the success of the project. Due to the fact that, I was responsible for designing the
network of the enterprise system, therefore; my responsibility was to look for the security
implications of the system and to ensure that the network availability would be maintained
for accessing the system. Therefore; I used my own knowledge to develop the architecture. In
this process, I also communicated with the project manager and the CEO about the
REFLECTION ON IS PRACTICE
meetings were held between the group members as well with the CEO of the company.
Strategies were made regarding the deliberation process.
Acquisition: The acquisition was made with the experience on implementing the project. This
means that the group members were active on communicating the result of each phase of the
project. Further with the help of communication with the CEO, it was possible to learn about
the requirements and thee probable outputs that were expected by the company from the
project (Lee, Park and Lee 2015). The deliverables were also identified by continuous
learning process through the project.
Performance: The goal of the group was to involve the improving the performance of the
individuals associated with the project and the overall enterprise system. In this process,
performance criteria were set and thee group members gave continuous efforts for meeting
with those criteria.
Conformance: Throughout the project, compliances and the standards of project management
were maintained. In this regard, the project manager took the responsibility for making all the
members aware of the compliances which were required to be followed. The ethics on team
work and project development were also maintained by all the group members with success.
Human behaviour: For a group project, thee human behaviour impacts its success
significantly (Mueller 2015). In this project, although the behaviour of different members was
different, however; a team goal and team culture was set which helped us to focus on the
similar vision throughout the project. This contributed to the individual success and the
success of the overall project.
Relate:
Own individual contribution:
As a group member, I was given the responsibility to share and use my own skills for
ensuring the success of the project. Due to the fact that, I was responsible for designing the
network of the enterprise system, therefore; my responsibility was to look for the security
implications of the system and to ensure that the network availability would be maintained
for accessing the system. Therefore; I used my own knowledge to develop the architecture. In
this process, I also communicated with the project manager and the CEO about the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
REFLECTION ON IS PRACTICE
requirements of the information management. This helped me to deliver my knowledge in the
network development with success. I also maintained communication with the other project
members regarding the objectives and the process of development. Information was shared
between each other which helped me to complete my work with success. Further, I also
maintained the compliances in the process of completing my task. The compliances were
made clear to me by the project manager and with his support; it was possible for me to
deliver my best performance in this project. The difficulties that I faced initially regarding the
complicated network design were mitigated with proper communication. I even shared my
own knowledge with other group members for assisting them in their respective activities.
Overall, I was the part of a successful project team and this helped me to gain huge
experiences for future works.
Reason:
Impact of the group work for learning about enterprise architectures and governance:
The project was helpful in learning about the design of the enterprise architectures. This was
a new learning experience for me as previously I have not worked in such projects.
Therefore; I was always forward to participate in this project as I knew that it would help me
to gain new experiences. The structure of information governance of a parcel delivery
company was also unknown for me and through this project; I was even able to learn how
information governance differs in different industries. Even the enterprise architecture was
also different compared to what I was aware in my previous projects. Therefore; it was a
challenging task both for me and the other members of the group. However; the group
members were ready to take up the challenge and with the support of thee project manager;
proper strategies were made. All the group members communicated with each other and
shared the individual experiences on the project of enterprise architecture (Ghobadi 2015).
This process worked on developing some goals on the development of the system. Along
with this, meetings were held regarding the development of the information governance for
the enterprise system. This was conducted with the support of the CEO of the company. Each
phase that was completed was used as the learning process for the group members. The
findings from the phases were documented and each group member shared the experiences
from the phase. This helped in learning about the next steps that required to be implemented
for the successive phases. Overall, it was a continuous learning process for all the members
REFLECTION ON IS PRACTICE
requirements of the information management. This helped me to deliver my knowledge in the
network development with success. I also maintained communication with the other project
members regarding the objectives and the process of development. Information was shared
between each other which helped me to complete my work with success. Further, I also
maintained the compliances in the process of completing my task. The compliances were
made clear to me by the project manager and with his support; it was possible for me to
deliver my best performance in this project. The difficulties that I faced initially regarding the
complicated network design were mitigated with proper communication. I even shared my
own knowledge with other group members for assisting them in their respective activities.
Overall, I was the part of a successful project team and this helped me to gain huge
experiences for future works.
Reason:
Impact of the group work for learning about enterprise architectures and governance:
The project was helpful in learning about the design of the enterprise architectures. This was
a new learning experience for me as previously I have not worked in such projects.
Therefore; I was always forward to participate in this project as I knew that it would help me
to gain new experiences. The structure of information governance of a parcel delivery
company was also unknown for me and through this project; I was even able to learn how
information governance differs in different industries. Even the enterprise architecture was
also different compared to what I was aware in my previous projects. Therefore; it was a
challenging task both for me and the other members of the group. However; the group
members were ready to take up the challenge and with the support of thee project manager;
proper strategies were made. All the group members communicated with each other and
shared the individual experiences on the project of enterprise architecture (Ghobadi 2015).
This process worked on developing some goals on the development of the system. Along
with this, meetings were held regarding the development of the information governance for
the enterprise system. This was conducted with the support of the CEO of the company. Each
phase that was completed was used as the learning process for the group members. The
findings from the phases were documented and each group member shared the experiences
from the phase. This helped in learning about the next steps that required to be implemented
for the successive phases. Overall, it was a continuous learning process for all the members

5
REFLECTION ON IS PRACTICE
of the group and also helped me to learn about the enterprise architecture and governance
with success.
Reconstruct:
Lessons for the future IS practice:
Information system is one area which keeps on evolving with the time and demands.
Therefore; it is always important to keep the individuals updated with the new knowledge and
skills (Kirk and MacDonell 2018). For me, involvement in the project of BlueParcel was a
new learning experience. Through this, I learnt about the architecture of enterprise system of
a B2C business process. Due to the fact that it was a relatively new project for me, therefore;
I have given importance to learn from each of the phase. In this regard, I also learnt about the
way an information system can be reconstructed. I learnt about the process by which the new
technologies can be implemented in the project of enterprise system. This would help me to
use the knowledge in the future IS practices as well. I have learnt about the project
governance by communicating with the project manager and the compliances that are
necessary for following in the projects of information system. I was not aware about all the
standards and compliances that are essential for improving the quality of an information
system project. Therefore; this project also contributed on learning about these standards and
compliances with success. In this regard, it will motivate me to keep myself updated
regarding learning about the changing compliances for the future IS practice. I am now
confident on taking the challenges for participating in the new IS practice e. I have event
learnt about the processes by which the project managers of IT projects lead the group. This
would help me in the future when I would take the charge as a project manager. It will make
me more confident about leading the IS projects with success. Therefore; for my own career
and personal growth, this project of BlueParcel has been extremely significant.
Conclusions:
This was a reflection report in which the individual learning experiences from the project
were shared. Perception was provided regarding the contribution of groups in this project.
The impact of the group work for the success of an IS project has been also assessed through
this reflection report.
REFLECTION ON IS PRACTICE
of the group and also helped me to learn about the enterprise architecture and governance
with success.
Reconstruct:
Lessons for the future IS practice:
Information system is one area which keeps on evolving with the time and demands.
Therefore; it is always important to keep the individuals updated with the new knowledge and
skills (Kirk and MacDonell 2018). For me, involvement in the project of BlueParcel was a
new learning experience. Through this, I learnt about the architecture of enterprise system of
a B2C business process. Due to the fact that it was a relatively new project for me, therefore;
I have given importance to learn from each of the phase. In this regard, I also learnt about the
way an information system can be reconstructed. I learnt about the process by which the new
technologies can be implemented in the project of enterprise system. This would help me to
use the knowledge in the future IS practices as well. I have learnt about the project
governance by communicating with the project manager and the compliances that are
necessary for following in the projects of information system. I was not aware about all the
standards and compliances that are essential for improving the quality of an information
system project. Therefore; this project also contributed on learning about these standards and
compliances with success. In this regard, it will motivate me to keep myself updated
regarding learning about the changing compliances for the future IS practice. I am now
confident on taking the challenges for participating in the new IS practice e. I have event
learnt about the processes by which the project managers of IT projects lead the group. This
would help me in the future when I would take the charge as a project manager. It will make
me more confident about leading the IS projects with success. Therefore; for my own career
and personal growth, this project of BlueParcel has been extremely significant.
Conclusions:
This was a reflection report in which the individual learning experiences from the project
were shared. Perception was provided regarding the contribution of groups in this project.
The impact of the group work for the success of an IS project has been also assessed through
this reflection report.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
REFLECTION ON IS PRACTICE
References:
Aga, D.A., Noorderhaven, N. and Vallejo, B 2016, Transformational leadership and project
success: The mediating role of team-building. International Journal of Project Management,
Vol.34, No.5, pp.806-818
Balan, L., Yuen, T. and Mehrtash, M 2019, Problem-Based Learning Strategy for CAD
Software Using Free-Choice and Open-Ended Group Projects. Procedia Manufacturing,
Vol.32, pp.339-347.
Ghobadi, S 2015, What drives knowledge sharing in software development teams: A
literature review and classification framework. Information & Management, Vol.52, No.1,
pp.82-97.
Kirk, D. and MacDonell, S.G 2018. Evolving a Model for Software Process Context: An
Exploratory Study. In ICSOFT (pp. 330-337).
Lee, J., Park, J.G. and Lee, S 2015, Raising team social capital with knowledge and
communication in information systems development projects. International Journal of
Project Management, Vol.33, No.4, pp.797-807.
Mueller, J 2015, Formal and informal practices of knowledge sharing between project teams
and enacted cultural characteristics. Project Management Journal, No.46, Vol.1, pp.53-68.
REFLECTION ON IS PRACTICE
References:
Aga, D.A., Noorderhaven, N. and Vallejo, B 2016, Transformational leadership and project
success: The mediating role of team-building. International Journal of Project Management,
Vol.34, No.5, pp.806-818
Balan, L., Yuen, T. and Mehrtash, M 2019, Problem-Based Learning Strategy for CAD
Software Using Free-Choice and Open-Ended Group Projects. Procedia Manufacturing,
Vol.32, pp.339-347.
Ghobadi, S 2015, What drives knowledge sharing in software development teams: A
literature review and classification framework. Information & Management, Vol.52, No.1,
pp.82-97.
Kirk, D. and MacDonell, S.G 2018. Evolving a Model for Software Process Context: An
Exploratory Study. In ICSOFT (pp. 330-337).
Lee, J., Park, J.G. and Lee, S 2015, Raising team social capital with knowledge and
communication in information systems development projects. International Journal of
Project Management, Vol.33, No.4, pp.797-807.
Mueller, J 2015, Formal and informal practices of knowledge sharing between project teams
and enacted cultural characteristics. Project Management Journal, No.46, Vol.1, pp.53-68.
1 out of 7
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.





