This report provides a comprehensive analysis of the environmental management practices and processes employed during the demolition of the Yorkshire Brewery (14-21 Robert Street Collingwood) in preparation for high-rise construction. It details the demolition process, emphasizing the importance of environmental considerations, and examines the policies of Nema Demolition Company regarding pollution prevention, regulatory compliance, and the implementation of an integrated management system. The report identifies key stakeholders, including safety officers, engineers, environmental conservation bodies, and municipal council officials, and outlines environmental issues associated with demolition waste, such as timber, palm wood, and asphalt. It further explores waste management practices, including reuse and recycling, and addresses statutory requirements for scheme planning. The second part of the report focuses on an environmental management plan, incorporating public awareness, political goodwill, and the establishment of a specific site for landfill disposal. The plan emphasizes sustainability, planning, and continuous improvement through the ISO 14001 framework, concluding with a procedural overview aligned with environmental regulations and Australian (Victoria State) provisions.
Document Page
MANAGE ENVIRONMENTAL MANAGEMENT PRACTICES AND
PROCESSES IN BUILDING AND CONSTRUCTION
Student Name
Course
Instructor
Institution
Location
Date
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Introduction
In simple terms, demolition can be defined as taking out of any load-supporting structural
element or wrecking of a building. Today the demolition industries have become very
sophisticated hence requires competence and expertise from the involved individuals. There has
been some misconception which is very popular that demolitions are simply knocking a structure
down before having all the debris hauled to a landfill (Akanni, Oke and Akpomiemie 2015). This
kind of assumption is actually wrong. In Australia, the process of the demolition is actually
enhanced due to the practice of erecting high rise structures in the places that were initially
occupied with the low-rise structures.
The selection of the techniques for the demolition is thus guided by the experience and
the relevant knowledge. This particular study seeks to provide a detailed report on the
management in regard to the environmental practices during the demolition of Yorkshire
brewery (14-21 Robert Street Collingwood) to create space for high rise construction while
retaining the heritage of the surrounding or adjacent buildings.
Policies of the companies in regard to the demolition exercise
Nema Demolition Company is committed to the delivery of the demolition services for
Yorkshire brewery (14-21 Robert Street Collingwood) in a manner considered to be
environmentally friendly. This is achieved by:
Pollution prevention
Current legislation compliance as well as other applicable requirements for the aspects of
the company
Document Page
Implementation of the Integrated System of the Management which incorporates the
specifications by ISO 14001
Reviewing and setting of the environmental objectives as well as targets to assist in
driving the continuous improvement of the environment.
Material and additional resource provision as considered appropriate in the required
implementation for the environmental policy statement
Development of environmental awareness of the workers through effective training and
education.
Effective communication to ensure that other parties that work for the company including
sub-contractors adhere to the policies as well as procedures of the company.
Stakeholders involved in the demolition projects
During the demolition of the Yorkshire brewery (14-21 Robert Street Collingwood),the
following stakeholders were involved:
Safety officers: Demolition process is usually characterized by the falling debris among
other hazardous objects. The safety officer will ensure that relevant materials including
PPEs are made available.
Engineers: There is an evaluation of very many facts during, before and after the process
of the demolition. Prior to the exercise of the demolition, there is a need for the engineers
to properly understand the project demolition impact on the nearby structures.
Considering that the building which is taken through demolition was close to others, the
structural engineer in collaboration with the civil engineer will establish the degree or the
impact of the intended demolition.
Document Page
A representative from Environmental Conservation Bodies provides information in
regard to the appropriate area for the disposal of the landfill. This should be a place
where they will least cause a disturbance.
Officials of the Municipal Council: Assist in the provision of the permit to allow for the
demolition
Environmental issues during demolition and the procedures of the management
Demolition waste is actually becoming an environmental issue in most of the cases. This has
made minimization of wastes as well as their effective management(Wong and Zhou 2015). The
wastes that are generated from demolition is usually difficult to have them separated(Pilehchian,
Staub and Nepal 2015). The items that are reusable, as well as those recyclable, can be recovered
before the actual exercise of the demolition starts. The demolition of Yorkshire brewery (14-21
Robert Street Collingwood) generated wastes from which constitute the following materials:
Timber
Palm Wood
Asphalt
Management Practices
Re-use of wastes: waste material re-use is one of the crucial ways of preventing pollution. This is
because the changes are meant to reduce the quantity of generated wastes every year. The
company has therefore considered the re-use.
Recycling
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Wastes like wood that have no integrity issues can be recycled so as to prevent their
accumulation.
Statutory Requirements for the scheme planning
The management of demolition wastes will follow the recommended procedure of indicator
system so as to establish their effectiveness. This will be done at the three levels-Indicators of the
first level, indicators of the second level and finally the indicators of the third level.
Part 2
Environmental Management Plan
This particular research work focuses on the analysis of waste management as well as
technologies of their disposal by the means of thinking approach. The selected method was,
therefore, an integrated approach with the three elements of sustainability. The relationship that
exists between different actors and the perceived influence factors are illustrated by the causal
loop diagram shown below(Ajayi et al 2015). An important issue here is that demolition solid
wastes commonly referred to as DSW when mishandled results into effects of the environmental
Document Page
pollution which in turn must be minimized through application of an integrated management
system for wastes. It has been discovered that one of the devastating effects of demolition waste
management is an economic burden to the respective companies, to the public indirectly and
government hence the introduction of tax can be treated as one of the environmental
management plans(Mok, Shen. and Yang 2015).
Figure 1: Interconnection of factors(Mok, Shen. and Yang 2015)
The management plan thus focuses on the following fundamental areas:
Public awareness creation: Educating the public on their role of avoiding sites perceived to be
dangerous during the demolition exercise. This goes alongside reporting cases of demolition
Document Page
exercises that are not in compliance with the ISO14001. This can be facilitated by the use of the
posters.
Political goodwill: This includes enactments of the strict rules concerning environmental
conservation to monitor as well as regulate the exercises of the demolition
Establishment of a specific site for landfill disposal: There will need to secure a specific point
that has the recommended dimensions as per the Victoria policies of the environmental
management. The area should be far away from the sensitive areas like the residential places,
hospitals among other and generally be in compliance with the ISO 14001(Tabassi et al 2016).
MOTTO SUSTAINABILITY IN DEMOLITION
PLAN Identification of Planning as a key to
success in environmental conservation
DO
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Do As Planned
CHECK
Checking for the benefits of EIA
ACT
Instant Remedial Measure as per ISO 14001,
l
Certification ISO 14001
OR
Adoption of ISO 14001 EMS for Self-declaration
Document Page
Conclusion
The processes of demolition of Yorkshire brewery (14-21 Robert Street Collingwood) has been
captured in a procedural manner in line with the regulations that are stipulated by various
environmental bodies including ISO 14001.aAlthough the focus of the paper was on the
demolition of Yorkshire brewery (14-21 Robert Street Collingwood) while considering the
impacts of the exercise to the environment, the provision of the solution was in context with the
Australian(Victoria State) Provisions.
Document Page
REFERENCES
Ajayi, S.O., Oyedele, L.O., Bilal, M., Akinade, O.O., Alaska, H.A., Owolabi, H.A. and Kadiri,
K.O., 2015. Waste effectiveness of the construction industry: Understandin
g the impediments and requisites for improvements. Resources, Conservation and
Recycling, 102, pp.101-112.
Akanni, P.O., Oke, A.E. and Akpomiemie, O.A., 2015. Impact of environmental factors on
building project performance in Delta State, Nigeria. HBRC Journal, 11(1), pp.91-97.
Mok, K.Y., Shen, G.Q. and Yang, J., 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management, 33(2), pp.446-457.
Pilehchian, B., Staub-French, S. and Nepal, M.P., 2015. A conceptual approach to track design
changes within a multi-disciplinary building information modeling environment. Canadian
Journal of Civil Engineering, 42(2), pp.139-152.
Tabassi, A.A., Roufechaei, K.M., Ramli, M., Bakar, A.H.A., Ismail, R. and Pakir, A.H.K., 2016.
Leadership competencies of sustainable construction project managers. Journal of Cleaner
Production, 124, pp.339-349.
Wong, J.K.W. and Zhou, J., 2015. Enhancing environmental sustainability over building life
cycles through green BIM: A review. Automation in Construction, 57, pp.156-165.
chevron_up_icon
1 out of 10
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]