This report outlines a verification plan for the implementation of an Enterprise Resource Planning (ERP) system at ABC Pvt. Ltd., a stationary manufacturing company. The plan addresses the need for automation to replace manual processes across various departments, including production, logistics, finance, accountancy, and human resources. The system's development follows the waterfall method, with a dedicated verification phase. The verification process involves feedback from departmental shareholders, with distinct plans tailored to each department's functional requirements. The report defines pass/fail criteria and failure classifications to determine the severity of issues. Testing encompasses both functional and non-functional requirements, including maintainability, security, availability, interoperability, performance, and usability. Various testing methods, such as component, integration, system, and acceptance testing, are employed to ensure the ERP system functions accurately and meets all requirements. The report emphasizes the importance of thorough verification to ensure data integrity and system reliability.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
COVER PAGE
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Contents
1 Introduction..............................................................................................................................................3
2 Verification plan.......................................................................................................................................3
2.1 Feedback plan....................................................................................................................................3
2.2 Criteria...............................................................................................................................................3
2.3 Test cases...........................................................................................................................................4
2.3.1 Functional requirements............................................................................................................4
2.3.2 Non-Functional requirements.....................................................................................................4
4 References................................................................................................................................................4
Document Page
1 Introduction
ABC Pvt. Ltd. is a stationary manufacturing company dealing with both manufacturing and supply of the
stationaries to all its clients across the country. The company is purely relying on manual records for
data recording for all its processes. This processes includes production, logistics, accounting and human
resource processes. Manual processes of record keeping are acting as a bottleneck to the company
because of the high number of processes undertaken by over 1000 employees in every branch owned by
the company. Thus, there is need for an ERP to be deployed in the company to help automate most the
processes currently being undertaken manually. By deploying the ERP the company will help reduce the
workload of its employees by a significant margin. The ERP system will also provide a more efficient way
of record keeping as retrieval and processing of the large sets of data will be more efficient.
The ERP system will deal with very critical data thus there is need for verification and validation of the
system to make sure that all functionalities are working according to the requirements and all data is
stored and processed accurately.
2 Verification plan
The system will be developed using the waterfall method thus there is a distinct phase in the model
where all the verification is done and only until the verification phase is complete will the system be
deployed (Nadig, 2018).
2.1 Feedback plan
The ERP system will operate differently in different departments making up the company thus to verify
the system the feedback plans will differ from department to department. The following departments
will be captured as modules in the system;
Production
Logistics
Finance
Accountancy
Human Resource
Each department has shareholders who will be involved in verification of the system. The verification
will be different for every department where by each department will be presented with a verification
plan depending on the functional requirements of that department.
2.2 Criteria
A pass or fail criteria has to be defined in order to define what tests have passed or failed. To know the
severity of the failure all failures must be classified in order to determine the impact of the failure on the
system and the type of action needed to resolve the failure.
The types of failure classifications are;
Fatal- Failure leading to breakdown of the system or possible loss of data
Very serious- Malfunctioning of the system causing a standstill to many users for example to a
whole department
Document Page
Serious failure- Requirement implemented incorrectly or partially leading to a standstill for a
few users
Moderate Failure- Minor failure affecting counted users only
Mild Failure- Very minor error for example spelling errors.
2.3 Test cases
Testing will be done for two types of requirements;
Functional requirements
Non-functional requirements
2.3.1 Functional requirements
To test the functional requirements all the functional requirements will be classified in their respective
departments and the stakeholder for each department will test every requirement (Guru99, 2018).
2.3.2 Non-Functional requirements
The following non-functional requirements will be tested;
Maintainability
Security and privacy
Availability
Interoperability
Performance
Usability
The following types of tests will be done on both the functional and non-functional requirements;
Component testing
Integration testing
System testing
Acceptance testing
4 References
Guru99. (2018, March 15). How to Create a Test Plan. Retrieved March 24, 2018, from
https://www.guru99.com/what-everybody-ought-to-know-about-test-planing.html
Nadig, S. (2018). How to Plan and Manage Testing Projects Effectively (Tips). Retrieved March 24, 2018,
from http://www.softwaretestinghelp.com/test-project-planning/
chevron_up_icon
1 out of 4
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]