Anusha Khand's HND Project: Evaluating AI Lighting System Controller
VerifiedAdded on 2021/04/16
|53
|15020
|77
Report
AI Summary
This report, prepared by Anusha Khand for a HND project, details the evaluation of an automatic controller for a room's lighting system. The project aims to assess how people manage their lights and identify problems. It includes a project management plan with a scope document, work breakdown structure, milestone schedule, communication plan, risk action plan, and budget estimation. The research employs both qualitative and quantitative methods, including surveys and questionnaires, to gather data. The report analyzes the survey results and questionnaires, reflecting on the research's value, performance reviews, and evaluates the accuracy of the methods, tools, and project management processes. Critical evaluations of the project outcomes, decision-making, and changes to the initial plan are also included. The project's focus is on helping visually impaired and handicapped people, along with those who work at night.

1/1/2019
HND/ Second Semester Sec-B)
Managing a
Successful
Computing
Project
Anusha Khand
HND/ Second Semester Sec-B)
Managing a
Successful
Computing
Project
Anusha Khand
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Managing a Successful Computing Project 2019
Layout of Assignment:
1. Cover Page
2. Student declaration form (Collect from college reception)
3. Turnitin report
4. Assignment question ( Released from college)
5. Table of content
6. Assignment tasks
7. Reference
Anusha Khand (HND/ Second Semester Sec-B)
2
Layout of Assignment:
1. Cover Page
2. Student declaration form (Collect from college reception)
3. Turnitin report
4. Assignment question ( Released from college)
5. Table of content
6. Assignment tasks
7. Reference
Anusha Khand (HND/ Second Semester Sec-B)
2

Managing a Successful Computing Project 2019
Contents
Part 1:.....................................................................................................................................................5
Report on Project management plan and schedule:...............................................................................5
Executive summary............................................................................................................................7
Project Title:...........................................................................................................................................8
Introduction:.......................................................................................................................................8
Project Aims and Objectives:.............................................................................................................8
Project Aim:...................................................................................................................................8
Project Objectives:.........................................................................................................................8
Project management plan:......................................................................................................................8
Project Scope Document....................................................................................................................8
Project Title:...................................................................................................................................8
Project Justification:.......................................................................................................................8
Project Scope:.................................................................................................................................8
Project Objectives..........................................................................................................................9
Project Deliverables:......................................................................................................................9
Project Success:..............................................................................................................................9
Work Breakdown Structure:.............................................................................................................10
Milestone schedule:..........................................................................................................................13
Communication Plan:.......................................................................................................................14
Risk action plan:...............................................................................................................................17
Budget Estimation:...........................................................................................................................23
Part 2:...................................................................................................................................................24
Report on evaluating the use of our system.........................................................................................24
Executive summary..............................................................................................................................26
Qualitative research method:................................................................................................................27
Quantitative research method:..............................................................................................................27
Anusha Khand (HND/ Second Semester Sec-B)
3
Contents
Part 1:.....................................................................................................................................................5
Report on Project management plan and schedule:...............................................................................5
Executive summary............................................................................................................................7
Project Title:...........................................................................................................................................8
Introduction:.......................................................................................................................................8
Project Aims and Objectives:.............................................................................................................8
Project Aim:...................................................................................................................................8
Project Objectives:.........................................................................................................................8
Project management plan:......................................................................................................................8
Project Scope Document....................................................................................................................8
Project Title:...................................................................................................................................8
Project Justification:.......................................................................................................................8
Project Scope:.................................................................................................................................8
Project Objectives..........................................................................................................................9
Project Deliverables:......................................................................................................................9
Project Success:..............................................................................................................................9
Work Breakdown Structure:.............................................................................................................10
Milestone schedule:..........................................................................................................................13
Communication Plan:.......................................................................................................................14
Risk action plan:...............................................................................................................................17
Budget Estimation:...........................................................................................................................23
Part 2:...................................................................................................................................................24
Report on evaluating the use of our system.........................................................................................24
Executive summary..............................................................................................................................26
Qualitative research method:................................................................................................................27
Quantitative research method:..............................................................................................................27
Anusha Khand (HND/ Second Semester Sec-B)
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Managing a Successful Computing Project 2019
Difference between Qualitative and Quantitative research method:....................................................28
Survey:.................................................................................................................................................29
Questionnaires:.....................................................................................................................................31
Analysis of the survey taken:...............................................................................................................32
Analysis of Questionnaires:.................................................................................................................40
Reflect on the value of undertaking the research:................................................................................44
Performance Review:...........................................................................................................................44
Evaluation of accuracy and reliability of different research methods:.............................................47
Evaluation of selected appropriate tools and techniques for accuracy and authenticity:.................47
Evaluation of use of project management process and use of quality research:..............................48
Critical evaluation of project management process:............................................................................49
Critical evaluation of appropriate research methodologies applied:................................................51
Critical evaluation and reflection on the project outcomes, decision making process and changes or
developments of the initial project management plan:.....................................................................51
Anusha Khand (HND/ Second Semester Sec-B)
4
Difference between Qualitative and Quantitative research method:....................................................28
Survey:.................................................................................................................................................29
Questionnaires:.....................................................................................................................................31
Analysis of the survey taken:...............................................................................................................32
Analysis of Questionnaires:.................................................................................................................40
Reflect on the value of undertaking the research:................................................................................44
Performance Review:...........................................................................................................................44
Evaluation of accuracy and reliability of different research methods:.............................................47
Evaluation of selected appropriate tools and techniques for accuracy and authenticity:.................47
Evaluation of use of project management process and use of quality research:..............................48
Critical evaluation of project management process:............................................................................49
Critical evaluation of appropriate research methodologies applied:................................................51
Critical evaluation and reflection on the project outcomes, decision making process and changes or
developments of the initial project management plan:.....................................................................51
Anusha Khand (HND/ Second Semester Sec-B)
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Managing a Successful Computing Project 2019
Part 1:
Report on Project management plan and schedule:
Report prepared by: Anusha Khand
Report submitted to: Kelvin Mart (Head Manager)
Anusha Khand (HND/ Second Semester Sec-B)
5
Part 1:
Report on Project management plan and schedule:
Report prepared by: Anusha Khand
Report submitted to: Kelvin Mart (Head Manager)
Anusha Khand (HND/ Second Semester Sec-B)
5

Managing a Successful Computing Project 2019
Content
Part 1:.....................................................................................................................................................5
Report on Project management plan and schedule:...............................................................................5
Executive summary............................................................................................................................7
Project Title:...........................................................................................................................................8
Introduction:.......................................................................................................................................8
Project Aims and Objectives:.............................................................................................................8
Project Aim:...................................................................................................................................8
Project Objectives:.........................................................................................................................8
Project management plan:......................................................................................................................8
Project Scope Document....................................................................................................................8
Project Title:...................................................................................................................................8
Project Justification:.......................................................................................................................8
Project Scope:.................................................................................................................................8
Project Objectives..........................................................................................................................9
Project Deliverables:......................................................................................................................9
Project Success:..............................................................................................................................9
Work Breakdown Structure:.............................................................................................................10
Milestone schedule:..........................................................................................................................13
Communication Plan:.......................................................................................................................14
Risk action plan:...............................................................................................................................17
Budget Estimation:...........................................................................................................................23
Anusha Khand (HND/ Second Semester Sec-B)
6
Content
Part 1:.....................................................................................................................................................5
Report on Project management plan and schedule:...............................................................................5
Executive summary............................................................................................................................7
Project Title:...........................................................................................................................................8
Introduction:.......................................................................................................................................8
Project Aims and Objectives:.............................................................................................................8
Project Aim:...................................................................................................................................8
Project Objectives:.........................................................................................................................8
Project management plan:......................................................................................................................8
Project Scope Document....................................................................................................................8
Project Title:...................................................................................................................................8
Project Justification:.......................................................................................................................8
Project Scope:.................................................................................................................................8
Project Objectives..........................................................................................................................9
Project Deliverables:......................................................................................................................9
Project Success:..............................................................................................................................9
Work Breakdown Structure:.............................................................................................................10
Milestone schedule:..........................................................................................................................13
Communication Plan:.......................................................................................................................14
Risk action plan:...............................................................................................................................17
Budget Estimation:...........................................................................................................................23
Anusha Khand (HND/ Second Semester Sec-B)
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Managing a Successful Computing Project 2019
Executive summary
Here I am explaining my aims and objectives for the project and outline objectives and timeframes
based on my project. This project is made for the visually impaired people. Also, here I will provide
an appropriate project management plan that includes relevant actions to meet objectives and
timeframes and conduct a research to generate knowledge which will form the basis for analysis of
the scenario posed in the brief. I will make work breakdown structure and Gantt chart as a schedule.
Anusha Khand (HND/ Second Semester Sec-B)
7
Executive summary
Here I am explaining my aims and objectives for the project and outline objectives and timeframes
based on my project. This project is made for the visually impaired people. Also, here I will provide
an appropriate project management plan that includes relevant actions to meet objectives and
timeframes and conduct a research to generate knowledge which will form the basis for analysis of
the scenario posed in the brief. I will make work breakdown structure and Gantt chart as a schedule.
Anusha Khand (HND/ Second Semester Sec-B)
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Managing a Successful Computing Project 2019
Project Title:
Evaluate the use of Automatic controller for lighting system of a room.
Introduction:
My project is on the evaluation of the use of automatic controller for lighting system of a room. It is
mainly based on those people who need to look after babies and handicapped people and also for
those who have habit of working in night time.
Project Aims and Objectives:
Project Aim:
To know about how people are managing their lights
To know how many of them are having problem managing them
Project Objectives:
Taking online survey
Taking paper survey i.e. questionnaires
Taking experts interview
Doing secondary research through books and people
Project management plan:
Project Scope Document
Project Title:
Evaluate the use of Automatic controller for lighting system of a room.
Project Justification:
This research project is evaluating the effectiveness of using AI in light which will manage the
brightness of the lights according to the environment and the physical needs. After doing this
research, we will be able to know how many people are having problem with the manual lighting
system. If this research gets successful, many people will know about the use of AI in light and try to
implement it.
Anusha Khand (HND/ Second Semester Sec-B)
8
Project Title:
Evaluate the use of Automatic controller for lighting system of a room.
Introduction:
My project is on the evaluation of the use of automatic controller for lighting system of a room. It is
mainly based on those people who need to look after babies and handicapped people and also for
those who have habit of working in night time.
Project Aims and Objectives:
Project Aim:
To know about how people are managing their lights
To know how many of them are having problem managing them
Project Objectives:
Taking online survey
Taking paper survey i.e. questionnaires
Taking experts interview
Doing secondary research through books and people
Project management plan:
Project Scope Document
Project Title:
Evaluate the use of Automatic controller for lighting system of a room.
Project Justification:
This research project is evaluating the effectiveness of using AI in light which will manage the
brightness of the lights according to the environment and the physical needs. After doing this
research, we will be able to know how many people are having problem with the manual lighting
system. If this research gets successful, many people will know about the use of AI in light and try to
implement it.
Anusha Khand (HND/ Second Semester Sec-B)
8

Managing a Successful Computing Project 2019
Project Scope:
This project includes the research information about the use of automatic controller for lighting
system of a room. By doing this research project we will be able to evaluate the use of AI element in
google map. For designing the format of questionnaires MS-Excel and survey will be designed from
survey monkey website and the link will be shared to everyone and anyone can do the survey. For
the expenditure of my research I have estimated around Rs. 30,000 budgets. I will conduct the survey
and questionnaires around the end of the July or at the starting of the August. My research conclusion
will be made by the middle of August.
Project Objectives
To know about how people are managing their lights
To know how many of them are having problem managing them
Project Deliverables:
Number of peoples who are having difficulties managing the light brightness
Project Success:
If the answers from the people who took the questionnaires and survey of my research meet’s the pre
expected answers of mine expectation then my research will be considered successful. If the demand
of my research project increases in the market my research will be considered successful.
Anusha Khand (HND/ Second Semester Sec-B)
9
Project Scope:
This project includes the research information about the use of automatic controller for lighting
system of a room. By doing this research project we will be able to evaluate the use of AI element in
google map. For designing the format of questionnaires MS-Excel and survey will be designed from
survey monkey website and the link will be shared to everyone and anyone can do the survey. For
the expenditure of my research I have estimated around Rs. 30,000 budgets. I will conduct the survey
and questionnaires around the end of the July or at the starting of the August. My research conclusion
will be made by the middle of August.
Project Objectives
To know about how people are managing their lights
To know how many of them are having problem managing them
Project Deliverables:
Number of peoples who are having difficulties managing the light brightness
Project Success:
If the answers from the people who took the questionnaires and survey of my research meet’s the pre
expected answers of mine expectation then my research will be considered successful. If the demand
of my research project increases in the market my research will be considered successful.
Anusha Khand (HND/ Second Semester Sec-B)
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Managing a Successful Computing Project 2019
Work Breakdown Structure:
A structure of design which keeps record of our works which we will be doing for some specific task
is work breakdown structure. It is also known as key project deliverable which organizes team’s
work into manageable section. Work breakdown structure has been used for numerous purpose. It
helps us in managing our work in a sequential format. Making a work breakdown structure for any
project is very helpful. There are four phases in it. They are:
Initiation and planning phase:
This is the starting phase of work breakdown structure. Those things which we are going to do at the
starting of any project are listed here in sequential form.
Execution phase:
After the works of initial phase are completed other works which need evaluation are done here.
Those things which are listed in initial phase all those are useless unless we don’t do this execution
phase.
Monitoring phase:
Those work which we are going to do in a project is monitored being considered as a part of
monitoring phase.
Closure phase:
This is the last phase of any project. All the things which are needed to close any project or those
things which closes any project are listed in closure phase.
Here is my work breakdown structure for my research project. It was developed in visio and it is a
screenshot of that work breakdown structure.
Anusha Khand (HND/ Second Semester Sec-B)
10
Work Breakdown Structure:
A structure of design which keeps record of our works which we will be doing for some specific task
is work breakdown structure. It is also known as key project deliverable which organizes team’s
work into manageable section. Work breakdown structure has been used for numerous purpose. It
helps us in managing our work in a sequential format. Making a work breakdown structure for any
project is very helpful. There are four phases in it. They are:
Initiation and planning phase:
This is the starting phase of work breakdown structure. Those things which we are going to do at the
starting of any project are listed here in sequential form.
Execution phase:
After the works of initial phase are completed other works which need evaluation are done here.
Those things which are listed in initial phase all those are useless unless we don’t do this execution
phase.
Monitoring phase:
Those work which we are going to do in a project is monitored being considered as a part of
monitoring phase.
Closure phase:
This is the last phase of any project. All the things which are needed to close any project or those
things which closes any project are listed in closure phase.
Here is my work breakdown structure for my research project. It was developed in visio and it is a
screenshot of that work breakdown structure.
Anusha Khand (HND/ Second Semester Sec-B)
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Managing a Successful Computing Project 2019
All the works of work breakdown structure are scheduled in Gantt chart. Here is also a screenshot of
my Gantt chart schedule.
Anusha Khand (HND/ Second Semester Sec-B)
11
All the works of work breakdown structure are scheduled in Gantt chart. Here is also a screenshot of
my Gantt chart schedule.
Anusha Khand (HND/ Second Semester Sec-B)
11

Managing a Successful Computing Project 2019
Anusha Khand (HND/ Second Semester Sec-B)
12
Anusha Khand (HND/ Second Semester Sec-B)
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 53
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.