This report addresses the EWB Challenge, focusing on the development of a water supply management system for Bonalbo, Australia. The student identifies the background of the EWB challenge and the issues faced by the Bonalbo community, including water scarcity due to population growth and lack of proper resources. The report outlines the current water supply situation, identifies key stakeholders such as the Bonalbo water authority and Kyogle Council, and defines client needs and the problem statement. The student proposes solutions like promoting groundwater use, rainwater harvesting, and developing water storage. The project aims to provide a continuous supply of safe water and manage water resources sustainably. The report also includes references to relevant research papers and highlights the importance of stakeholder collaboration in addressing the water scarcity challenges faced by the community.
Document Page
Running head: THE EWB CHALLENGE
THE EWB CHALLENGE- Water supply management system
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
THE EWB CHALLENGE
Executive summary
The aim of the assessment is to select one suitable design projects that will be capable of
identifying the challenges that are faced by EWB. The report will focus on providing a clear
background of the EWB challenge, the issues faced by the community, and the project. There is
a need to understand the way community measures can be developed for the purpose of
minimizing the use of water. There is a need to manage the way water supply is used and
organized within the community. The report will focus entirely on outlining the essential factors
associated with the development water supply system. Hence with the help of this proposal it
will become easy to understand the way renewable resources must be utilized and protected.
Document Page
2
THE EWB CHALLENGE
Table of Contents
Background on EWB challenge.......................................................................................................3
Selected challenge project...........................................................................................................3
Background of the communities......................................................................................................3
Bonalbo current water supply......................................................................................................4
Identification of stakeholders relevant to the design area...............................................................5
Client needs problem statement.......................................................................................................6
Reference.........................................................................................................................................7
Document Page
3
THE EWB CHALLENGE
Background on EWB challenge
EWB challenge is the concept that was being published in the year 2007 with the objective of
providing better facilities and services towards the people of communities. These include
preparing creative solutions for the purpose of resolving the real world problems. EWB
challenge was introduced for the purpose of solving the issues that our faces with real designs. It
becomes easy to enhance the students of engineering through the use of proper technique and
learning. Through this program the designs that are prepared by the university students are
shared to the community people so that they can implement it in real life. This will enhance the
way of living and will also ensure that the resources are being used efficiently (Poff et al. 2016).
Thus it can be stated that with an efficient and well engaged project it becomes easy to provide
proper facilities towards the community members. However the engineering projects are shared
indirectly towards the community members. Thus it is important to ensure that no student is
under any circumstances get any access it to contact any community members.
Selected challenge project
EWB challenge close it is mainly concerned with providing proper facilities to words each
member of the community. Bonalbo in Australia faces several issues with proper water
management. Does in that area it becomes very essential to manage the water efficiently so that
every member of the village can receive sufficient amount of water (Ntuli and Abu-Mahfouz
2016). The EWB challenge focuses on providing and managing the water supply in the village
area.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
THE EWB CHALLENGE
Background of the communities
Bonalbo is a community that belongs to Australia. This is located extremely in the forest region
of the Austria. This is considered to be in the outskirts and does not have any proper supply of
water to certain districts. Hence there is a need to ensure that proper water supply system is
implemented within the area so that it can offer better support towards the community people.
The water supply systems will be developed for the purpose of providing continuous supply of
safe water in metered connections to the premises (Michael et al. 2019).
Water Resources Management has been implemented with the objective of managing the
sustainability, economically efficiency and proper use of the water resources. There are certain
factors that are essential for successfully developing a water supply system. This includes
identifying the water pressure, determining the water flow rate, developing mains connection and
designing with proper materials. It is expected that by the end of the project it will become easy
to meet the need of water by the community people (Rajala 2012). By the execution of the
project it is expected that the Bonalbo will be able to meet their daily water needs.
Bonalbo current water supply
With the huge rise in the population of Bonalbo it has been observed that the water scarcity
chances also increased. Bolnalbo has developed several modifications in the surrounding that
includes domestic, industrial, municipal and agriculture systems. This are developed within the
area. This is leading to water scarcity in several areas of Bonalbo (Meng et al. 2018). There are
no proper water resources and that is the main reason behind the huge scarcity of water. Hence
with the EWB challenge it is expected that the water supply system will be enhanced. This will
also lead to storing the resources efficiently and will ensure that the water are supplied to each
member of community sufficiently.
Document Page
5
THE EWB CHALLENGE
Identification of stakeholders relevant to the design area
Water supply system is crucial and thus it is important to ensure that proper management has
been carried out within the Bonalbo village for managing the water scarcity. The project plays a
crucial role as this will be capable of reducing the chances of water scarcity and will ensure that
proper support is offered towards the individuals of the Bonalbbo (Mehta and Gorski 2016). The
important lists of stakeholders are discussed below:
Name of the
Stakeholder
Responsibility Influence
Bonalbo water
authority
Responsible for designing a suitable water
supply management system
High influence with high
interest in the project
Kyogle Council Responsible for approving the
implementation of water supply management
system
Interest rate is medium and
influence is high
Water supplier Responsible for constructing the water supply
management system
Influence high
Northern Rivers
region of New South
Wales
Responsible for analyzing the project impacts Impact medium and
influence medium
Document Page
6
THE EWB CHALLENGE
Client needs problem statement
The main problem that is faced with the village and the community members is with improper
management of water. It has been observed that the municipality failed to provide sufficient
amount of water to different parts of Bonalbo. There is a need to implement proper measures that
will be capable of resolving the issues. Water is the key resource and thus it is important to
ensure that proper and efficient engineering solution is developed after managing the key
stakeholders (Siller Cook and Johnson 2016). It is important for every community member to act
effectively so that they can restore maximum water resources at a time. Measures such as
protecting the natural resources along with management will enhance the overall water ratio. The
key objectives that will be fulfilled with the execution of the project are listed below:
Promoting use of ground water
Utilizing proper resources
Encouraging rain water harvesting
Implementing hand pumps and tube wells at different locations
Developing dam for managing the water resources
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
THE EWB CHALLENGE
Reference
Mehta, K. and Gorski, I., 2016, October. Preparing engineers for careers in social innovation and
sustainable development. In 2016 IEEE Frontiers in Education Conference (FIE) (pp. 1-5).
IEEE.
Meng, Y., Chen, G., Sun, M., Sun, Z. and Gao, W., 2018, April. Introduction on the Importance
of Engineering Survey in Project Management. In 2018 International Conference on Computer
Modeling, Simulation and Algorithm (CMSA 2018). Atlantis Press.
Michael, R.N., Howell, S. and Campbell, C., 2019. The Use of PebblePad ePortfolio as a Tool
for Teaching First-Year Engineering Design Practice. In Blended Learning Designs in STEM
Higher Education (pp. 289-310). Springer, Singapore.
Ntuli, N. and Abu-Mahfouz, A., 2016. A simple security architecture for smart water
management system. Procedia Computer Science, 83, pp.1164-1169.
Poff, N.L., Brown, C.M., Grantham, T.E., Matthews, J.H., Palmer, M.A., Spence, C.M., Wilby,
R.L., Haasnoot, M., Mendoza, G.F., Dominique, K.C. and Baeza, A., 2016. Sustainable water
management under future uncertainty with eco-engineering decision scaling. Nature Climate
Change, 6(1), pp.25-34.
Rajala, S.A., 2012. Beyond 2020: Preparing engineers for the future. Proceedings of the
IEEE, 100(Special Centennial Issue), pp.1376-1383.
Siller, T., Cook, A. and Johnson, G., 2016. Creating International Experiences for First-Year
Engineers Through the EWB Australia Challenge Project. In 2016 ASEE Annual Conference &
Exposition.
chevron_up_icon
1 out of 8
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]