Project Management for Family Life Resort Technology Project

Verified

Added on  2020/01/23

|29
|4969
|36
Project
AI Summary
This project management report analyzes the implementation of a technological system at the Family Life Tropical Resort in Turkey. The report is structured into three main tasks: a project proposal, a comprehensive report, and a project execution plan. The project proposal outlines the principles of project management, success and failure factors, resource utilization, and project closure stages. The report delves into human resource planning, project coordination, project qualities, organizational structure, and leadership requirements. The project execution plan provides a detailed project plan, project scheduling tools, project performance analysis, and change control procedures. The overall aim is to address the resort's challenges, such as the lack of an online reservation system and a weak online presence, by integrating technology to enhance customer experience and attract a wider clientele. The report emphasizes the importance of factors such as tourist involvement, executive support, clear requirements, and effective planning for project success. The project also addresses the critical stages of project closing, including project tourist acceptance, project assessment, and document archiving. This document is available on Desklib, providing valuable insights for students studying project management.
Document Page
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
PROJECT MANAGEMENT
FOR BUSINESS
Document Page
2
Table of Contents
Introduction.................................................................................................. .3
Task 1: Project Proposal ....................................................................................3
1. Project Management and its Principles in implementing the technological
development task 3
2. Success and Failure Factor of Project ................................................................5
3. Principles behind setting up the procedures and systems for the effective
utilization of re- sources
7
4. Key stages of closing down the project or appraisal
...............................................8
Task 2: Report ............................................................................................... .9
2.1 Planning of human
resources .........................................................................9
2.2 Coordinate and Control a Project .....................................................................9
2.3 Project Qualities and Leadership requirements...................................................10
2.4 Organization Structure ................................................................................12
Task 3: Project Execution Plan ...........................................................................12
3.1 Detailed project plan for the project...............................................................12
3.2 Project Scheduling Tools to plan the Project Activates
..........................................14
3.3 Analysis of Project Performance .....................................................................17
3.4 Change control procedure for evaluation of project
.............................................18
Conclusion .................................................................................................. .19
References .................................................................................................. .20
Document Page
3
Introduction
The Family Life Tropical Resort is considered as a premium resort which is situated in
Sarigerme, Dalaman area in Turkey. The resort is famous due to its attractiveness and high-level
facilities. The main reason behind its attractiveness is the way of blended the combining sea, the
sun, and sand. All this provide a great enjoyment and dream holiday right to its customers. It has
become the most popular destination in its region, due to its reputation for beautifully landscaped
tropical gardens, excellent customer service, and the promise of a perfect stay to its guests. But,
the resort also faces some problems in its life. The major problem is the absence of online reser-
vation system and strong online presence. This will lose the interest of customers in the resort. In
the absence of online system, the resort is not able to attract corporate clients and VIP tourists. In
this paper, we will discuss the implementation of the technological system in the resort. This will
help the resort to solve its problems in an efficient way. Implementation of technological system
connects the resort with the worldwide internet map (Kerzner, 2013). It facilitates the tourists
and clients to look holiday destinations online and also allow them to communicate with the re-
sort to resolve their different queries.
Task 1: Project Proposal
1. Project Management and its Principles in implementing the technological devel-
opment task
Project Management is considered as the application of skills, methods, processes experience,
and knowledge to achieve the predetermined project objectives and success criteria’s. On the
other hand, a project is known as a temporary endeavor developed to manufacture a different
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
product, result or service with a defined end and beginning constraints. The main challenge of
project management is to attain all the objectives of the project within predetermined constraints.
For successful implementation of technological system the project management team of resort
should follow below-mentioned principles:
Project Structure: Management of technological system project in resort mainly revolves
around three main areas which are quality, time and resources. Project manager of the resort
should determine the clear structure of projects such as project milestone, timeline, order and its
goal so that no any problem can face by the resort in future (Burke, 2013).
Definition Phase: This principle is very necessary to follow. It is because definition phase is the
starting phase of the project. So, the project manager of a technological development project in
resort should focus more on conducting overall planning of the project. The project may fail in
the absence of clear definition. It is because a definition is muddled due to the involvement of
various stakeholders.
Clear Goals: The project manager of the technological project of the resort is responsible for the
attainment of a project goal. The project manager should clear define the goals of the project by
using SMART paradigm such as measurable, time-bounded, specific, and realistic (Schwalbe,
2015).
Transparency about Project Status: Milestone, structure plan, and flow chart are important
tools which help the project manager in stay on track. The project manager of the resort project
should able to draw a short and concise report of its project so that he can present it in a meeting
in an efficient manner.
Document Page
5
2. Success and Failure Factor of Project
Project Success factor
Technological system in resort can efficiently developed by focusing on following factors:
• Tourist Involvement: The absence of tourist involvement influence the success of the
project in high context. The project may fail if needs of tourists do not meet in an effi-
cient manner. Even when delivered on predetermined budget, and time. If lack involve-
ment of tourist is there, the whole project can become a failure. So, tourist needs and the
requirement should focus during an implementation of a project.
• Support of Executive Management: This affects the progress and process of project and
absence of input from executive can put a project at a serious disadvantage.
• Clear Statement of requirements: This refers to the required and base level requirements.
The project manager is able to reduce the effect of change by creating an obtainable and
base level of requirements (Fitzsimmons, 2013). The high benefit of this factor is that
project manager can better prepare towards priorities of the next phase of a project.
• Proper Planning: It is the key factor which influences overall success of the project. Cre-
ating a project plan should be the priority of project manager. In the absence of it, project
objective cannot achieve in an efficient manner.
Apart from all this success of resort project is highly depends on competent staff, realistic expec-
tations, hard-working and focused staff, ownership and smaller project milestones. If all these
Document Page
6
things are focused by the project manager in an efficient manner, he will be able to gain his pre-
determined project objectives in the required manner.
Project Failure factor
Project of technological system implementation in resort may fail due to the following factor:
• Estimation and Planning Factor: If schedule and the initial cost of the project are not es-
timated in right manner than the overall project can fail. The estimation may be wrong if
the project manager finds more information available for the project (Walker, 2015). In
the same manner, if plans are not utilized in right direction to guide the project onward,
thus causing the overall project to fail.
• Implementation Factor: This is caused by wrong use of project methodology, changes in
project scope, changes in testing and requirements, and poor inspection.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
3. Principles behind setting up the procedures and systems for the effective utiliza-
tion of resources
It is the responsibility of the project manager to set the procedures and systems in such a way
through which the available resources can be utilized in an efficient manner. The following prin-
ciples should follow by the project manager of resort project for efficient utilization of resources:
• Infrastructure Management: The main motive behind the infrastructure management is to
contribute to the right in sequence, with the right people, at the right time, and in the right
arrangement. Effective management of infrastructure enables the project manager to uti-
lize the available resources in the desired manner so that project objective can be attained
successfully.
• Communication Management: Project manager can implement the communication man-
agement by three important processes which are identification, allocation, and coverage
(Verzuh, 2015). These help the project manager in creating healthy communication envi-
ronment which facilitate effective utilization of available resources.
Document Page
8
Apart from these principles project manager of the resort project can also formulate standards
related to the quality and implementation of the project. This helps the project manager in effec-
tive utilization of available resources to meet standard criteria.
PMIS is referred as project management information system which is one of the software
application and methodical procedure that assist in collection and use of information associated
with project. The particular electronic system act as an aid in planning, executing as well a close
goals of the project management. It varies in terms of scope, design as well as features depending
on the business operational needs. In other words it is typically regarded as computer driven
system that assist the project manager in developing the project.
There is presence of several components in relation with the project management information
system. Such involves project performance indicator tracking system, procurement planning and
monitoring system, disbursement planning and tracking system, procurement activity tracking
system as well as project planning and system of scheduling. A typical PMIS software possess
the elements that includes WBS creation tools, calendaring features, scheduling abilities, quality
control charts, PERT Charts, Gantt charts, reporting functionality, resources tracking as well a
leveling etc.
PMIS possess several features that are stated in the manner as below:
ï‚· It is considered as system tool that is being utilized in the project management for the sake
of delivering information
ï‚· It is utilized by lower and upper management for communicating with one another
ï‚· Another feature of PMIS is that it is an automated system that quickly makes creation,
manage as well as streamline the project management procedure.
ï‚· It assist in planning, execution as well as closure of project management targets.
Document Page
9
4. Key stages of closing down the project or appraisal
This stage of the project is considered as an important process improvement activity for future
projects. The following stages should be while closing down the technological project of Resort:
• Project Tourist Acceptance: Project is not completed till tourists of the resort give their
acceptance. At this stage, the project manager conducted meeting with the sponsor of a
project to discuss closure around the acceptance criteria for the project.
• Conduct Project Assessment: It is necessary to take feedback from the tourists of the re-
2.3 Project Qualities and Leadership requirementssort as well as the team of project
also. This is done to enhance opportunities for im- provement in future products.
• Complete Archive of Project: It is the big part of the whole project. It is necessary for the
project management team of the resort to manage their project documents in an efficient
manner.
After following all these stages, the team of the project can successfully announce project com-
pletion. This can be announced by providing a party to its project members and other members of
the resort. A post-project appraisal can do with the help of questionnaire. After completing the
project successfully, the project manager can distribute questionnaire to tourists and resort mem-
bers (Gido, 2014). This enables the project manager to know the view of the members towards
change so that further changes can be performed as per requirement.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
Task 2: Report
2.1 Planning of human resources
Human Resources are the key factors behind the success of the project. We required following
human beings to complete the project in the desired manner:
Position/Role Responsibilities
Sponsor He is responsible for providing approvals re-
lated to scope and cost of the project. In addi-
tion, risk prioritization, and requirements
management also perform by sponsor.
Project Manager Feasibility Evaluation, Resource utilization,
Budget, and Management.
Business Analyst Scope Management, Requirement manage-
ment, and Communication with the stake-
holders.
Designer Component and Website layout design.
Developer Website developer
Tester The testing website for possible issues. It also
includes performance testing.
Network Analyst Development of different web related issues
with the domain and server.
2.2 Coordinate and Control a Project
The project manager can coordinate and control the overall project through formulating their
roles and responsibilities as the member of a project team and their management strategy
(Marchewka, 2014). This can be understood by the following table:
Document Page
11
Current Engagement Potential Management Strategy
Project Manager Communicating strategy and changes to
project to the whole team. Work with the de-
veloper in close proximity, to ensure that all
activities are performed in a predetermined
manner.
Designer Following up with the Project manager and
the developer to ensure that selected design is
aligned as per the requirements.
Sponsor Continuous meeting with the team and the
project manager to check the additional re-
quirements and progress if any.
Business Analyst Keeping Stakeholders and project manager on
the same page through providing the required
information on a continuous basis.
Tester Generating different reports of project and
communicate any issue to both developer and
business Analyst
Network Analyst Necessary working is at the time of pre-de-
ployment testing and time of UAT. Coordinat-
ing with the different team members by email
and reporting them about the required
changes.
Developer Collecting testing results and developing a
component in parallel from the Tester.
The monitoring and control process is comprised of all the procedure that are being performed for
the sake of observing the execution of the project so that issues can be determined on time and
corrective actions can be taken where important in order to ensure controlling of the project. It can
be stated that project monitoring and controlling takes place in parallel with the execution of the
project so that when the execution of the project is done its monitoring can be carried out. Further
project can be controlled through implementation of the suitable oversight level as well as remedial
actions.
The steps that are included in the monitoring and control process are as under:
chevron_up_icon
1 out of 29
circle_padding
hide_on_mobile
zoom_out_icon