PPMP20009 - Leading Lean Projects: FIFA World Cup 2018 Management
VerifiedAdded on 2023/06/08
|15
|4250
|278
Essay
AI Summary
This essay provides a comprehensive project plan for managing the FIFA World Cup 2018 using lean project management principles. It identifies and elaborates on key concepts such as Voice of the Customer (VOC), Critical to Customer Requirements (CCR), and Critical to Quality (CTQ) parameters, highlighting their importance in ensuring the event's success. The paper discusses how lean project management can be implemented to improve event series, deliver events on time, manage budgets, eliminate resource wastage, and add value to services for footballers and audiences. Furthermore, it evaluates various project management methodologies, including PMBOK, PRINCE2, Agile practices, and Lean Six Sigma (DMAIC methodology), justifying their potential application in managing the FIFA World Cup event to ensure quality, controlled environments, and iterative requirement delivery.

Running head: MANAGING THE LEAN PROJECT
MANAGING THE LEAN PROJECT
Name of the Student:
Name of the University:
Author Note:
MANAGING THE LEAN PROJECT
Name of the Student:
Name of the University:
Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1MANAGING THE LEAN PROJECT
Table of Contents
Introduction......................................................................................................................................2
Discussion........................................................................................................................................2
Management of the lean project management:............................................................................5
Selection of the project management methodology for the implementation and managing of
FIFA World Cup:.........................................................................................................................6
Application of DMAIC Methodology:......................................................................................10
Conclusion.....................................................................................................................................10
References......................................................................................................................................12
Table of Contents
Introduction......................................................................................................................................2
Discussion........................................................................................................................................2
Management of the lean project management:............................................................................5
Selection of the project management methodology for the implementation and managing of
FIFA World Cup:.........................................................................................................................6
Application of DMAIC Methodology:......................................................................................10
Conclusion.....................................................................................................................................10
References......................................................................................................................................12

2MANAGING THE LEAN PROJECT
Introduction
FIFA World Cup 2018 has been organized by FIFA. The place of the event is in Russia.
There are 18 teams going to participate in the FIFA World Cup. The main objective of this paper
is to prepare a project plan that will help the organizer to maintain a schedule and proper
management plan for handling this event. There are different types of events going to happen in
the world cup. The world cup authority is needed to develop the synchronization between the
different events of the world cup. Apart from that the application of the technology is an
important part in the world cup (Matheson at al.,2018). The evaluation of the project
management planning along with the discussion regarding the various components in the project
management planning will help to get the overview of the proper project management planning
of this event (Makarychev & Yatsyk, 2015). Apart from the discussion regarding the selection of
the project management methodology and the justification of the selection of the particular
methodology has been done in this paper. The implementation of the lean project is also included
in this paper.
Discussion
There are certain factors regarding this project for the evaluation. The components of this
project have been discussed in the first place in order to capture the basic requirements of the
project. Some of the concerned factors regarding the implementation of this project are-
Voice of Customer: The voice of consumer is the process for knowing the concern and
the experience of the consumers regarding the outcome of the project. The experience of the
Introduction
FIFA World Cup 2018 has been organized by FIFA. The place of the event is in Russia.
There are 18 teams going to participate in the FIFA World Cup. The main objective of this paper
is to prepare a project plan that will help the organizer to maintain a schedule and proper
management plan for handling this event. There are different types of events going to happen in
the world cup. The world cup authority is needed to develop the synchronization between the
different events of the world cup. Apart from that the application of the technology is an
important part in the world cup (Matheson at al.,2018). The evaluation of the project
management planning along with the discussion regarding the various components in the project
management planning will help to get the overview of the proper project management planning
of this event (Makarychev & Yatsyk, 2015). Apart from the discussion regarding the selection of
the project management methodology and the justification of the selection of the particular
methodology has been done in this paper. The implementation of the lean project is also included
in this paper.
Discussion
There are certain factors regarding this project for the evaluation. The components of this
project have been discussed in the first place in order to capture the basic requirements of the
project. Some of the concerned factors regarding the implementation of this project are-
Voice of Customer: The voice of consumer is the process for knowing the concern and
the experience of the consumers regarding the outcome of the project. The experience of the

3MANAGING THE LEAN PROJECT
consumers can be captured through the form of feedbacks or surveys. The improvisation of the
project can be done on the basis of the voice or of customers.
In case of organization of the FIFA World Cup, the authority of the organizations is
aware about the vastness of this event. The consumers, here are the audiences. The audiences
here are of two types. Many of the audiences and supports of the different teams from different
countries are coming to Russia for watching the live football match. On the other hand many
people will be watching the live telecast of the show from all over the world. In this case, the
broadcast of the match is needed to be done in a proper way.
In order to evaluate the voice of customer different tools and techniques are provided.
The need of the customer plays a significant role for the delivery of the successful outcome of
the project. In this case, there are two primary needs of the audiences which are needed to be
implemented. The large number of audiences are coming to Russia for watching live football
match (Parisi et al.,2016). The FIFA is needed to inspect the grounds and the gallery of the
different stadiums in order to make it ensured that all those galleries are capable to accommodate
those large numbers of audiences. Apart from the broadcasting is needed to be done in a proper
way so that the audiences from around the world can catch the live show from different parts of
the world. Different advanced broadcasting technologies and the use of satellite can be done in
this case.
Apart from the audiences, the players and the support stuffs are the important people and
the stakeholders in the tournament. FIFA is needed to take care of them by providing the proper
accommodation and good environment for playing the game. The proper care of all these
concerns will help to the event to deliver the right outcome.
consumers can be captured through the form of feedbacks or surveys. The improvisation of the
project can be done on the basis of the voice or of customers.
In case of organization of the FIFA World Cup, the authority of the organizations is
aware about the vastness of this event. The consumers, here are the audiences. The audiences
here are of two types. Many of the audiences and supports of the different teams from different
countries are coming to Russia for watching the live football match. On the other hand many
people will be watching the live telecast of the show from all over the world. In this case, the
broadcast of the match is needed to be done in a proper way.
In order to evaluate the voice of customer different tools and techniques are provided.
The need of the customer plays a significant role for the delivery of the successful outcome of
the project. In this case, there are two primary needs of the audiences which are needed to be
implemented. The large number of audiences are coming to Russia for watching live football
match (Parisi et al.,2016). The FIFA is needed to inspect the grounds and the gallery of the
different stadiums in order to make it ensured that all those galleries are capable to accommodate
those large numbers of audiences. Apart from the broadcasting is needed to be done in a proper
way so that the audiences from around the world can catch the live show from different parts of
the world. Different advanced broadcasting technologies and the use of satellite can be done in
this case.
Apart from the audiences, the players and the support stuffs are the important people and
the stakeholders in the tournament. FIFA is needed to take care of them by providing the proper
accommodation and good environment for playing the game. The proper care of all these
concerns will help to the event to deliver the right outcome.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4MANAGING THE LEAN PROJECT
Critical to customer requirements: The critical to customer requirements of the projects
denotes if the requirements regarding the requirements of the customers are getting fulfilled in
the course of the compilation of the project. The project or event can be said to be successful if
all the requirements of the customer regarding the project has delivered through the outcome of
the project. In this case, FIFA is aware about the requirements of the audiences (Stettina &
Hörz, 2015). The organization is taking steps according to the requirements of the audiences. It
can be said proper planning and the management of the event in World cup can help the
successful implementation of critical to customer requirements.
Critical to the quality parameters: Critical to the quality parameters are the set or list of
quality list or requirements those are needed to be met during the development of the project in
order to control the quality of the project. The quality control is an important part of the project
or the event as it helps to deliver the right outcome maintaining the standards. There are lots of
scope for controlling the quality of the World Cup tournament (Conforto et al.,2014). FIFA is
concerned about maintaining the quality of the accommodation of the footballers. Apart from
that FIFA is aware about the quality of the playing ground can affect the playing condition
(Fleming & Koppelman, 2016). In that case, the inspection from this organization has been done
before the beginning of the event. Apart from that FIFA has made it assured that the galleries are
capable to accommodate the large number of players. Apart from that for the easy availability of
the tickets, FIFA has implemented the advanced technology so that the consumers can easily
avail the tickets for watching the matches (Drohomeretski et al.,2014). The organization has also
joined with some of the famous broadcasting companies so that the live telecast of the match can
be done maintaining the quality of the live broadcast (Müller,2015). Moreover FIFA is
Critical to customer requirements: The critical to customer requirements of the projects
denotes if the requirements regarding the requirements of the customers are getting fulfilled in
the course of the compilation of the project. The project or event can be said to be successful if
all the requirements of the customer regarding the project has delivered through the outcome of
the project. In this case, FIFA is aware about the requirements of the audiences (Stettina &
Hörz, 2015). The organization is taking steps according to the requirements of the audiences. It
can be said proper planning and the management of the event in World cup can help the
successful implementation of critical to customer requirements.
Critical to the quality parameters: Critical to the quality parameters are the set or list of
quality list or requirements those are needed to be met during the development of the project in
order to control the quality of the project. The quality control is an important part of the project
or the event as it helps to deliver the right outcome maintaining the standards. There are lots of
scope for controlling the quality of the World Cup tournament (Conforto et al.,2014). FIFA is
concerned about maintaining the quality of the accommodation of the footballers. Apart from
that FIFA is aware about the quality of the playing ground can affect the playing condition
(Fleming & Koppelman, 2016). In that case, the inspection from this organization has been done
before the beginning of the event. Apart from that FIFA has made it assured that the galleries are
capable to accommodate the large number of players. Apart from that for the easy availability of
the tickets, FIFA has implemented the advanced technology so that the consumers can easily
avail the tickets for watching the matches (Drohomeretski et al.,2014). The organization has also
joined with some of the famous broadcasting companies so that the live telecast of the match can
be done maintaining the quality of the live broadcast (Müller,2015). Moreover FIFA is

5MANAGING THE LEAN PROJECT
concerned about the security during the match. All these steps and concerns regarding the event
have enabled the enhancement of the quality of conduction of the whole event.
Management of the lean project management:
The main objective of the lean project management is to manage the compilation of the
lean projects using proper tools and techniques (Verweij, Teisman & Gerrits, 2017). There are
certain principals for managing the lean projects. The main focus of the lean project management
is to reduce all the wastes in the process of the project.
The managing of the FIFA world cup is done by the lean project management. In order to do
this certain steps have been taken:
Improvement of the final series of events.
Delivering all the modules or the events in the process in time. In this case, it can be said
under this section the compilation of all the matches are needed to be done in a proper
way.
The compilation of all the matches including final and semifinals are done in a proper
way maintaining the budget of the project and compilation time of the project. This leads
to the mitigation of the resources of the projects.
Elimination of wastage of resources during the happening f the events. This also includes
maintaining the proper security and managing the large audiences during the running of
the matches.
Adding the value to the services provided to the footballers and the audiences is the main
challenge for FIFA. FIFA is concerned about the fact that there are lots of responsibilities
for them regarding the presentation of the live matches. Apart from that better
concerned about the security during the match. All these steps and concerns regarding the event
have enabled the enhancement of the quality of conduction of the whole event.
Management of the lean project management:
The main objective of the lean project management is to manage the compilation of the
lean projects using proper tools and techniques (Verweij, Teisman & Gerrits, 2017). There are
certain principals for managing the lean projects. The main focus of the lean project management
is to reduce all the wastes in the process of the project.
The managing of the FIFA world cup is done by the lean project management. In order to do
this certain steps have been taken:
Improvement of the final series of events.
Delivering all the modules or the events in the process in time. In this case, it can be said
under this section the compilation of all the matches are needed to be done in a proper
way.
The compilation of all the matches including final and semifinals are done in a proper
way maintaining the budget of the project and compilation time of the project. This leads
to the mitigation of the resources of the projects.
Elimination of wastage of resources during the happening f the events. This also includes
maintaining the proper security and managing the large audiences during the running of
the matches.
Adding the value to the services provided to the footballers and the audiences is the main
challenge for FIFA. FIFA is concerned about the fact that there are lots of responsibilities
for them regarding the presentation of the live matches. Apart from that better

6MANAGING THE LEAN PROJECT
management of the audiences and providing them proper guidelines for ticket booking
system and helping them to abide by the rules and regulations regarding the watching of
the matches.
There are certain principals for managing the lean project which can be applicable for the
managing the FIFA World Cup event. Some of these principals are-
Specification of the values for the customer.
Identification of the significance and the brand value for the event.
Making the right flow o the value by mitigation of the wastage in the development of the
event.
Let the consumer to tell their requirements before the delivering of the events.
Selection of the project management methodology for the implementation and managing of
FIFA World Cup:
There are various project management methodologies for the implementation and
managing of the project. The selection of the project management methodology depends on the
type of the project. Some of the popular project management methodologies are PMBOK,
PRINCE2, Agile practice and Lean Six Sigma.
In order to select the right project management methodology for management of the
FIFA World Cup the details regarding the working principal of the mentioned project
management methodology is needed to be known.
The PMBOK is not a project management methodology. It can be described as the
project management guideline for managing the project. According to the PMBOK the
compilation of the project management follows the project development life cycle. There are five
management of the audiences and providing them proper guidelines for ticket booking
system and helping them to abide by the rules and regulations regarding the watching of
the matches.
There are certain principals for managing the lean project which can be applicable for the
managing the FIFA World Cup event. Some of these principals are-
Specification of the values for the customer.
Identification of the significance and the brand value for the event.
Making the right flow o the value by mitigation of the wastage in the development of the
event.
Let the consumer to tell their requirements before the delivering of the events.
Selection of the project management methodology for the implementation and managing of
FIFA World Cup:
There are various project management methodologies for the implementation and
managing of the project. The selection of the project management methodology depends on the
type of the project. Some of the popular project management methodologies are PMBOK,
PRINCE2, Agile practice and Lean Six Sigma.
In order to select the right project management methodology for management of the
FIFA World Cup the details regarding the working principal of the mentioned project
management methodology is needed to be known.
The PMBOK is not a project management methodology. It can be described as the
project management guideline for managing the project. According to the PMBOK the
compilation of the project management follows the project development life cycle. There are five
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7MANAGING THE LEAN PROJECT
stages in the project development life cycle. The development of the project starts with the
initialization of the project and gathering of the requirements (Snyder & Dionisio, 2017). The
proper gathering of the requirements and the documentation of the requirements eliminates the
chances of the project scope creep. This phase is followed by project planning. In the planning
phase, the planning of the execution of the project is done. In the execution phase, the execution
of the blueprint of the planning is done in a proper way. The evaluation of the functioning of the
system is done in the monitoring and control phase of the project management. The project
closes with the closing or ending of the project.
PRINCE2 methodology is the project management methodology that helps to develop the
project in controlled environment. This methodology is based on the seven principals. There are
seven themes in the PRINCE2 methodology, they are- progress, change, quality, business case,
risk, organization, plans. Apart from that there are seven processes involved in this
methodology. According to this methodology the initialization of the project starts with the
starting up of the project. In a project team there should be a executive and the project manager
(Kazerouni et al.,2017). The planning of the project is introduced in this section. The
initialization of the project starts with the documentation of the requirements. The directing of
the project involves the decision making regarding the progress of the project (Kempe &
Memmert,2018). The control stage of the project involves the decision making regarding the
controlling of the each stages of the project and assigning the work packages and authorization
for the each part of the work (Nunkoo et al.,2018). The main objective of this section is to
maintain the link between the team manager and the project manager so that the delivery of the
project can be happened in right order. The management of the stage boundaries in this
methodology is an important part as it indicates the transition phase of the project from one stage
stages in the project development life cycle. The development of the project starts with the
initialization of the project and gathering of the requirements (Snyder & Dionisio, 2017). The
proper gathering of the requirements and the documentation of the requirements eliminates the
chances of the project scope creep. This phase is followed by project planning. In the planning
phase, the planning of the execution of the project is done. In the execution phase, the execution
of the blueprint of the planning is done in a proper way. The evaluation of the functioning of the
system is done in the monitoring and control phase of the project management. The project
closes with the closing or ending of the project.
PRINCE2 methodology is the project management methodology that helps to develop the
project in controlled environment. This methodology is based on the seven principals. There are
seven themes in the PRINCE2 methodology, they are- progress, change, quality, business case,
risk, organization, plans. Apart from that there are seven processes involved in this
methodology. According to this methodology the initialization of the project starts with the
starting up of the project. In a project team there should be a executive and the project manager
(Kazerouni et al.,2017). The planning of the project is introduced in this section. The
initialization of the project starts with the documentation of the requirements. The directing of
the project involves the decision making regarding the progress of the project (Kempe &
Memmert,2018). The control stage of the project involves the decision making regarding the
controlling of the each stages of the project and assigning the work packages and authorization
for the each part of the work (Nunkoo et al.,2018). The main objective of this section is to
maintain the link between the team manager and the project manager so that the delivery of the
project can be happened in right order. The management of the stage boundaries in this
methodology is an important part as it indicates the transition phase of the project from one stage

8MANAGING THE LEAN PROJECT
to another. The ending of the project is done through the closing of the project (Hinde, 2018).
This structure of this project management methodology is suitable for managing the construction
project as the emphasis is given on quality of the delivered project and the transitional phase of
the product from one stage to another.
Agile project management methodology is another approach for the management of the
project. The main advantage of this methodology is to deliver the requirements of the project
iteratively throughout the life cycle of the project (Moore,2017). The main advantage of the agile
project management is that the methodology is flexible enough for adopting any certain changes
in the course of the development of the project (Cucoranu, Parwani & Pantanowitz, 2014). This
methodology is useful for the development of the software projects where change in the
requirements can happen at any time. The methodology is helpful for delivering the products
with the added value and meeting all the requirements of the clients. The development of the nest
steep of the project is done on the feedback given for the particular part in the project.
Lean six sigma is a project management methodology that allows the team to work in a
cooperative manner so that the delivery of the project or event can be done in a proper way and
mitigation of the wastage in the course of the development can be achieved (Kerzner & Kerzner,
2017). In order to mitigate the wastage the merging of the lean manufacturing and six sigma is
needed to be done. The objective is to reduce the wastage of eight kinds. Lean six sigma is
helpful to reduce the wastage in the development and providing the framework for the
development of the project. In this process there are two tools for the development of the project-
lean and six sigma (Wong & Chadwick, 2017). This can be applicable for the development or
organizing the event that will deliver the fruitful outcome.
to another. The ending of the project is done through the closing of the project (Hinde, 2018).
This structure of this project management methodology is suitable for managing the construction
project as the emphasis is given on quality of the delivered project and the transitional phase of
the product from one stage to another.
Agile project management methodology is another approach for the management of the
project. The main advantage of this methodology is to deliver the requirements of the project
iteratively throughout the life cycle of the project (Moore,2017). The main advantage of the agile
project management is that the methodology is flexible enough for adopting any certain changes
in the course of the development of the project (Cucoranu, Parwani & Pantanowitz, 2014). This
methodology is useful for the development of the software projects where change in the
requirements can happen at any time. The methodology is helpful for delivering the products
with the added value and meeting all the requirements of the clients. The development of the nest
steep of the project is done on the feedback given for the particular part in the project.
Lean six sigma is a project management methodology that allows the team to work in a
cooperative manner so that the delivery of the project or event can be done in a proper way and
mitigation of the wastage in the course of the development can be achieved (Kerzner & Kerzner,
2017). In order to mitigate the wastage the merging of the lean manufacturing and six sigma is
needed to be done. The objective is to reduce the wastage of eight kinds. Lean six sigma is
helpful to reduce the wastage in the development and providing the framework for the
development of the project. In this process there are two tools for the development of the project-
lean and six sigma (Wong & Chadwick, 2017). This can be applicable for the development or
organizing the event that will deliver the fruitful outcome.

9MANAGING THE LEAN PROJECT
The discussion about various project management methodologies indicates the working
principals of the different project. The working principal of the different project management
methodologies indicates their effectiveness in for the different project management.
The selection of the right project management methodology can be done from the list of
this mentioned project management methodologies for the development of the event for FIFA
world cup. The event regarding the development of the FIFA World Cup needs to deliver all the
requirements with values and standard quality (Baham et al.,2017). Apart from that the main
objective of the organizers is to reduce the wastage during organizing the event of the World
Cup. Proper arrangement of the events needs the cooperation of the FIFA with different other
organizations. Apart from that the security during the event is important matter for both the
organizers and the audiences. Moreover, FIFA needs to arrange the system with the other
broadcasting companies for live broadcast of the matches. The whole project needs a flexible
system or the methodology for the development of the event. Apart from that the delivery of the
service also needs to meet all the requirements of the audiences and clients. The wastage of the
project is needed to be reduces at the same level so that the proper resource management can be
achieved. In this case, considering all the factors the for the development of the event regarding
the FIFA world cup , lean six sigma can be applicable (Preuss & Schnitzer,2015). This will help
the organizers to identify the scopes and the opportunities in the delivery of the series of the
events in the World Cup (Trzeciak et al.,2018). Apart from that the management of the resources
and the mitigation of the waste during the development of the project or the events can be done
through the application of the six sigma. The development of the lean project is dependent on the
basic principals those are responsible for adding the value in the service delivered through the
project.
The discussion about various project management methodologies indicates the working
principals of the different project. The working principal of the different project management
methodologies indicates their effectiveness in for the different project management.
The selection of the right project management methodology can be done from the list of
this mentioned project management methodologies for the development of the event for FIFA
world cup. The event regarding the development of the FIFA World Cup needs to deliver all the
requirements with values and standard quality (Baham et al.,2017). Apart from that the main
objective of the organizers is to reduce the wastage during organizing the event of the World
Cup. Proper arrangement of the events needs the cooperation of the FIFA with different other
organizations. Apart from that the security during the event is important matter for both the
organizers and the audiences. Moreover, FIFA needs to arrange the system with the other
broadcasting companies for live broadcast of the matches. The whole project needs a flexible
system or the methodology for the development of the event. Apart from that the delivery of the
service also needs to meet all the requirements of the audiences and clients. The wastage of the
project is needed to be reduces at the same level so that the proper resource management can be
achieved. In this case, considering all the factors the for the development of the event regarding
the FIFA world cup , lean six sigma can be applicable (Preuss & Schnitzer,2015). This will help
the organizers to identify the scopes and the opportunities in the delivery of the series of the
events in the World Cup (Trzeciak et al.,2018). Apart from that the management of the resources
and the mitigation of the waste during the development of the project or the events can be done
through the application of the six sigma. The development of the lean project is dependent on the
basic principals those are responsible for adding the value in the service delivered through the
project.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

10MANAGING THE LEAN PROJECT
Application of DMAIC Methodology:
DMAIC methodology is approved by the practice of six sigma. The application of the
DMAIC methodology can be done in organizing the FIFA World Cup event. There are five
factors in the DMAIC application-
Define: This factor is related to define the scope of the project. The scope the project in this case
is the proper management of the events for the FIFA World Cup.
Measure: The measure of the project will define the areas for exploring the opportunities and
scope. The project in this case is measurable as the scope of the project is clear.
Analysis: The analysis part defines the analysis of the challenges and opportunities related in the
project.
Improve: The FIFA organization can improve the management of the happening of the project
through the enhancement of the security and mitigation of the wastage in the project.
Control: The control of the project defines the controlling of the performance of the project. In
this case, FIFA will be responsible for the controlling of the ongoing events.
Conclusion
The discussion is regarding the implementation of the FIFA World Cup. The type of the
development of the project is lean and can be managed by the lean six sigma project
management methodology. The discussion about the development of the events of this project
management has been discussed form the different perspective. There are different components
needed to be discussed to understand the engagement of the different stakeholders in this event.
Those have been discussed with respect to the different terms in the project management. There
Application of DMAIC Methodology:
DMAIC methodology is approved by the practice of six sigma. The application of the
DMAIC methodology can be done in organizing the FIFA World Cup event. There are five
factors in the DMAIC application-
Define: This factor is related to define the scope of the project. The scope the project in this case
is the proper management of the events for the FIFA World Cup.
Measure: The measure of the project will define the areas for exploring the opportunities and
scope. The project in this case is measurable as the scope of the project is clear.
Analysis: The analysis part defines the analysis of the challenges and opportunities related in the
project.
Improve: The FIFA organization can improve the management of the happening of the project
through the enhancement of the security and mitigation of the wastage in the project.
Control: The control of the project defines the controlling of the performance of the project. In
this case, FIFA will be responsible for the controlling of the ongoing events.
Conclusion
The discussion is regarding the implementation of the FIFA World Cup. The type of the
development of the project is lean and can be managed by the lean six sigma project
management methodology. The discussion about the development of the events of this project
management has been discussed form the different perspective. There are different components
needed to be discussed to understand the engagement of the different stakeholders in this event.
Those have been discussed with respect to the different terms in the project management. There

11MANAGING THE LEAN PROJECT
are some of the factors those are needed to be considered during the development of the series of
the events. Maintaining the security during the running of the match is one of the major issues.
Apart from that meeting all the requirements from the audiences and the footballers from the
different parts of the country are the major challenges for FIFA. In order to manage all the
challenges and requirements the selection of the right project management methodology is
needed to be adopted. In order to do this the characteristics of the lean project management has
been discussed. There are several project management methodologies available for the
development of the project. The detailed discussion regarding the working principals of the
different project management methodologies have been discussed. This discussion helps to
choose the right project management methodology for the development of the series of events for
the FIFA World Cup. It can be said the adaptation of the lean six sigma can be helpful for the
development of this project management. It can be concluded that the adaptation of the six
sigma can be helpful for the organizers for the development of the events along with delivering
the right outcome in right time with maintaining the required standards.
are some of the factors those are needed to be considered during the development of the series of
the events. Maintaining the security during the running of the match is one of the major issues.
Apart from that meeting all the requirements from the audiences and the footballers from the
different parts of the country are the major challenges for FIFA. In order to manage all the
challenges and requirements the selection of the right project management methodology is
needed to be adopted. In order to do this the characteristics of the lean project management has
been discussed. There are several project management methodologies available for the
development of the project. The detailed discussion regarding the working principals of the
different project management methodologies have been discussed. This discussion helps to
choose the right project management methodology for the development of the series of events for
the FIFA World Cup. It can be said the adaptation of the lean six sigma can be helpful for the
development of this project management. It can be concluded that the adaptation of the six
sigma can be helpful for the organizers for the development of the events along with delivering
the right outcome in right time with maintaining the required standards.

12MANAGING THE LEAN PROJECT
References
Baham, C., Hirschheim, R., Calderon, A. A., & Kisekka, V. (2017). An Agile Methodology for
the Disaster Recovery of Information Systems Under Catastrophic Scenarios. Journal of
Management Information Systems, 34(3), 633-663.
Bean, B. W. (2015). An Interim Essay on FIFA's World Cup of Corruption: The Desperate Need
for International Corporate Governance Standards at FIFA. ILSA J. Int'l & Comp. L., 22,
367.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014). Can
agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Cucoranu, I. C., Parwani, A. V., & Pantanowitz, L. (2014). Lean Six Sigma. In Practical
Informatics for Cytopathology(pp. 113-119). Springer, New York, NY.
Drohomeretski, E., Gouvea da Costa, S. E., Pinheiro de Lima, E., & Garbuio, P. A. D. R. (2014).
Lean, Six Sigma and Lean Six Sigma: an analysis based on operations
strategy. International Journal of Production Research, 52(3), 804-824.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Hinde, D. (2018). PRINCE2 Study Guide: 2017 Update. John Wiley & Sons.
Kazerouni, A. M., Edwards, S. H., Hall, T. S., & Shaffer, C. A. (2017, June). DevEventTracker:
Tracking development events to assess incremental development and procrastination.
References
Baham, C., Hirschheim, R., Calderon, A. A., & Kisekka, V. (2017). An Agile Methodology for
the Disaster Recovery of Information Systems Under Catastrophic Scenarios. Journal of
Management Information Systems, 34(3), 633-663.
Bean, B. W. (2015). An Interim Essay on FIFA's World Cup of Corruption: The Desperate Need
for International Corporate Governance Standards at FIFA. ILSA J. Int'l & Comp. L., 22,
367.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., & de Almeida, L. F. M. (2014). Can
agile project management be adopted by industries other than software
development?. Project Management Journal, 45(3), 21-34.
Cucoranu, I. C., Parwani, A. V., & Pantanowitz, L. (2014). Lean Six Sigma. In Practical
Informatics for Cytopathology(pp. 113-119). Springer, New York, NY.
Drohomeretski, E., Gouvea da Costa, S. E., Pinheiro de Lima, E., & Garbuio, P. A. D. R. (2014).
Lean, Six Sigma and Lean Six Sigma: an analysis based on operations
strategy. International Journal of Production Research, 52(3), 804-824.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Hinde, D. (2018). PRINCE2 Study Guide: 2017 Update. John Wiley & Sons.
Kazerouni, A. M., Edwards, S. H., Hall, T. S., & Shaffer, C. A. (2017, June). DevEventTracker:
Tracking development events to assess incremental development and procrastination.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

13MANAGING THE LEAN PROJECT
In Proceedings of the 2017 ACM Conference on Innovation and Technology in Computer
Science Education (pp. 104-109). ACM.
Kempe, M., & Memmert, D. (2018). “Good, better, creative”: the influence of creativity on goal
scoring in elite soccer. Journal of sports sciences, 1-5.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Makarychev, A., & Yatsyk, A. (2015). Brands, cities and (post-) politics: A comparative analysis
of urban strategies for the Universiade 2013 and the World Football Cup 2018 in
Russia. European Urban and Regional Studies, 22(2), 143-160.
Matheson, V. A., Schwab, D., & Koval, P. (2018). Corruption in the Bidding, Construction and
Organisation of Mega-Events: An Analysis of the Olympics and World Cup. In The
Palgrave Handbook on the Economics of Manipulation in Sport (pp. 257-278). Palgrave
Macmillan, Cham.
Moore, K. (2017). A second ‘Maracanazo’? The 2014 FIFA World Cup in historical
perspective. Sport in Society, 20(5-6), 555-571.
Müller, M. (2015). What makes an event a mega-event? Definitions and sizes. Leisure
Studies, 34(6), 627-642.
Nunkoo, R., Ribeiro, M. A., Sunnassee, V., & Gursoy, D. (2018). Public trust in mega event
planning institutions: The role of knowledge, transparency and corruption. Tourism
Management, 66, 155-166.
In Proceedings of the 2017 ACM Conference on Innovation and Technology in Computer
Science Education (pp. 104-109). ACM.
Kempe, M., & Memmert, D. (2018). “Good, better, creative”: the influence of creativity on goal
scoring in elite soccer. Journal of sports sciences, 1-5.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Makarychev, A., & Yatsyk, A. (2015). Brands, cities and (post-) politics: A comparative analysis
of urban strategies for the Universiade 2013 and the World Football Cup 2018 in
Russia. European Urban and Regional Studies, 22(2), 143-160.
Matheson, V. A., Schwab, D., & Koval, P. (2018). Corruption in the Bidding, Construction and
Organisation of Mega-Events: An Analysis of the Olympics and World Cup. In The
Palgrave Handbook on the Economics of Manipulation in Sport (pp. 257-278). Palgrave
Macmillan, Cham.
Moore, K. (2017). A second ‘Maracanazo’? The 2014 FIFA World Cup in historical
perspective. Sport in Society, 20(5-6), 555-571.
Müller, M. (2015). What makes an event a mega-event? Definitions and sizes. Leisure
Studies, 34(6), 627-642.
Nunkoo, R., Ribeiro, M. A., Sunnassee, V., & Gursoy, D. (2018). Public trust in mega event
planning institutions: The role of knowledge, transparency and corruption. Tourism
Management, 66, 155-166.

14MANAGING THE LEAN PROJECT
Parisi, C., Prescott, S. R., Yorg, R. A., Coleman, J. L., & Szilard, R. H. (2016). External Events
Analysis for LWRS/RISMC Project: Methodology Development and Early
Demonstration (No. INL/CON-16-37839). Idaho National Lab.(INL), Idaho Falls, ID
(United States).
Preuss, H., & Schnitzer, M. (2015). Organization costs for a FIFA World Cup and their
significance during a bid. Event Management, 19(1), 57-72.
Snyder, C., & Dionisio, C. S. (2017). A project manager's book of forms: A companion to the
PMBOK guide. John Wiley & Sons.
Stettina, C. J., & Hörz, J. (2015). Agile portfolio management: An empirical perspective on the
practice in use. International Journal of Project Management, 33(1), 140-152.
Trzeciak, S., Mercincavage, M., Angelini, C., Cogliano, W., Damuth, E., Roberts, B. W., ... &
Mazzarelli, A. J. (2018). Lean Six Sigma to Reduce Intensive Care Unit Length of Stay
and Costs in Prolonged Mechanical Ventilation. Journal for Healthcare Quality, 40(1),
36-43.
Verweij, S., Teisman, G. R., & Gerrits, L. M. (2017). Implementing Public–Private Partnerships:
How Management Responses to Events Produce (Un) Satisfactory Outcomes. Public
Works Management & Policy, 22(2), 119-139.
Wong, D., & Chadwick, S. (2017). Risk and (in) security of FIFA football World Cups–outlook
for Russia 2018. Sport in Society, 20(5-6), 583-598.
Parisi, C., Prescott, S. R., Yorg, R. A., Coleman, J. L., & Szilard, R. H. (2016). External Events
Analysis for LWRS/RISMC Project: Methodology Development and Early
Demonstration (No. INL/CON-16-37839). Idaho National Lab.(INL), Idaho Falls, ID
(United States).
Preuss, H., & Schnitzer, M. (2015). Organization costs for a FIFA World Cup and their
significance during a bid. Event Management, 19(1), 57-72.
Snyder, C., & Dionisio, C. S. (2017). A project manager's book of forms: A companion to the
PMBOK guide. John Wiley & Sons.
Stettina, C. J., & Hörz, J. (2015). Agile portfolio management: An empirical perspective on the
practice in use. International Journal of Project Management, 33(1), 140-152.
Trzeciak, S., Mercincavage, M., Angelini, C., Cogliano, W., Damuth, E., Roberts, B. W., ... &
Mazzarelli, A. J. (2018). Lean Six Sigma to Reduce Intensive Care Unit Length of Stay
and Costs in Prolonged Mechanical Ventilation. Journal for Healthcare Quality, 40(1),
36-43.
Verweij, S., Teisman, G. R., & Gerrits, L. M. (2017). Implementing Public–Private Partnerships:
How Management Responses to Events Produce (Un) Satisfactory Outcomes. Public
Works Management & Policy, 22(2), 119-139.
Wong, D., & Chadwick, S. (2017). Risk and (in) security of FIFA football World Cups–outlook
for Russia 2018. Sport in Society, 20(5-6), 583-598.
1 out of 15
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.