PPMP 20014 Complex Project Management: GERD Case Study
VerifiedAdded on 2025/04/28
|10
|703
|256
AI Summary
Desklib provides past papers and solved assignments for students. This project analyzes the GERD dam's complexities.

PPMP 20014
Complex Project
management
Complex Project
management
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Framework of
assessment
• The assessment framework is demonstrating on the
complex project which is constructing on the basis of
Nile River, name as GERD (Grand Ethiopian
Renaissance Dam).
• The assessment include all the essentials related to
complexities present in the project, and better
understanding of these concepts are derived in the
final assessment.
• The final assessment is done with the contribution of
my team member, Mohammed Faiz Ur Rehman.
• Both of us have distributed our particular task to
complete the final assessment
MOHAMMED AMEEN
SHAREEF
assessment
• The assessment framework is demonstrating on the
complex project which is constructing on the basis of
Nile River, name as GERD (Grand Ethiopian
Renaissance Dam).
• The assessment include all the essentials related to
complexities present in the project, and better
understanding of these concepts are derived in the
final assessment.
• The final assessment is done with the contribution of
my team member, Mohammed Faiz Ur Rehman.
• Both of us have distributed our particular task to
complete the final assessment
MOHAMMED AMEEN
SHAREEF

Continue…
• The case and the changes which are derived in the cases
are derived by me and rest of the part is demonstrate by
my team mate.
• In final assessment I have explored all the significance
factors that are related in the context of GERD (Grand
Ethiopian Renaissance Dam), which is based on three
basin countries as Egypt, Ethiopian and Sudan.
• This final assessment helped me in learning and gaining
my knowledge in the context of project complexities.
MOHAMMED AMEEN
SHAREEF
• The case and the changes which are derived in the cases
are derived by me and rest of the part is demonstrate by
my team mate.
• In final assessment I have explored all the significance
factors that are related in the context of GERD (Grand
Ethiopian Renaissance Dam), which is based on three
basin countries as Egypt, Ethiopian and Sudan.
• This final assessment helped me in learning and gaining
my knowledge in the context of project complexities.
MOHAMMED AMEEN
SHAREEF
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Methodology in
assessment
• The final assessment is done by taking several articles
from CQU library.
• The journal articles are peer reviewed which help in
analysing about the concepts of project complexities.
• Here are some articles which are derived by me:
Management Scenarios of the Grand Ethiopian Renaissance
Dam and Their Impacts under Recent and Future Climates.
The Grand Ethiopian Renaissance Dam: a benefit-sharing
project in the Eastern Nile?
MOHAMMED AMEEN
SHAREEF
assessment
• The final assessment is done by taking several articles
from CQU library.
• The journal articles are peer reviewed which help in
analysing about the concepts of project complexities.
• Here are some articles which are derived by me:
Management Scenarios of the Grand Ethiopian Renaissance
Dam and Their Impacts under Recent and Future Climates.
The Grand Ethiopian Renaissance Dam: a benefit-sharing
project in the Eastern Nile?
MOHAMMED AMEEN
SHAREEF
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Challenge
s
Some challenges which are faced by in completing my
own part are:
Failing in communicating with my team member and
get confused in distributing the tasks to be done by
us.
Fails in understanding the aspects of project
complexities but at the end the journal articles and
their concepts are clearly understood by me.
Take so much time in completing the task.
MOHAMMED AMEEN
SHAREEF
s
Some challenges which are faced by in completing my
own part are:
Failing in communicating with my team member and
get confused in distributing the tasks to be done by
us.
Fails in understanding the aspects of project
complexities but at the end the journal articles and
their concepts are clearly understood by me.
Take so much time in completing the task.
MOHAMMED AMEEN
SHAREEF

Assessment
framework
• The complexity project named as GERD (Grand
Ethiopian Renaissance Dam) is presented by me and
my team member Mohammed Ameen Shareef.
• All the task between us are distributed between me
and my team member
• In this assessment I have explained all those elements
that are learned by me in the context of project
complexities.
MOHAMMED FAIZ UR
REHMAN
framework
• The complexity project named as GERD (Grand
Ethiopian Renaissance Dam) is presented by me and
my team member Mohammed Ameen Shareef.
• All the task between us are distributed between me
and my team member
• In this assessment I have explained all those elements
that are learned by me in the context of project
complexities.
MOHAMMED FAIZ UR
REHMAN
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Methods
• For completing the final assessment, I have take some
journals from the CQU library.
• The journals which are taken by me helped me in developing
my learning skills in the context of complexity project.
• Here are some articles which are derived by me:
Quantifying and evaluating the impacts of cooperation in
transboundary river basins on the Water-Energy-Food
nexus: The Blue Nile Basin.
Evaluation of potential impact of Grand Ethiopian
Renaissance Dam on seawater intrusion in the Nile Delta
aquifer.
MOHAMMED FAIZ UR
REHMAN
• For completing the final assessment, I have take some
journals from the CQU library.
• The journals which are taken by me helped me in developing
my learning skills in the context of complexity project.
• Here are some articles which are derived by me:
Quantifying and evaluating the impacts of cooperation in
transboundary river basins on the Water-Energy-Food
nexus: The Blue Nile Basin.
Evaluation of potential impact of Grand Ethiopian
Renaissance Dam on seawater intrusion in the Nile Delta
aquifer.
MOHAMMED FAIZ UR
REHMAN
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Challenge
s
There are some challenge which are faced by in
accomplishing the overall final assessment are:
• Poor understanding in determining the aspects of
complexities in GERD projects leads to various
problems and challenges for me.
• Lack of communication with my team member
develop confusion between us.
• Some uncertainties develop some problems in
completing the process.
MOHAMMED FAIZ UR
REHMAN
s
There are some challenge which are faced by in
accomplishing the overall final assessment are:
• Poor understanding in determining the aspects of
complexities in GERD projects leads to various
problems and challenges for me.
• Lack of communication with my team member
develop confusion between us.
• Some uncertainties develop some problems in
completing the process.
MOHAMMED FAIZ UR
REHMAN

Conclusio
n
• The final assessment on project complexities in the
context of GERD project are completed by us.
• The journal articles from CQU library helped us in
developing our learning in the context of project
complexities.
• Some challenges faced by us at the starting of final
assessment but all these challenges are overcome in
timely manner and the final assessment is completed
by us.
n
• The final assessment on project complexities in the
context of GERD project are completed by us.
• The journal articles from CQU library helped us in
developing our learning in the context of project
complexities.
• Some challenges faced by us at the starting of final
assessment but all these challenges are overcome in
timely manner and the final assessment is completed
by us.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Referenc
es
• Stefan Liersch, Hagen Koch, & Fred Fokko Hattermann. (2017).
Management Scenarios of the Grand Ethiopian Renaissance Dam and
Their Impacts under Recent and Future Climates. Water,9(10), 728.
• Tawfik, R. (2016). The Grand Ethiopian Renaissance Dam: a benefit-
sharing project in the Eastern Nile?. Water International, 41(4), 574-592.
• Basheer, M., Wheeler, K. G., Ribbe, L., Majdalawi, M., Abdo, G., & Zagona,
E. A. (2018). Quantifying and evaluating the impacts of cooperation in
transboundary river basins on the Water-Energy-Food nexus: The Blue Nile
Basin. Science of the Total Environment, 630, 1309-1323.
• Abd-Elhamid, H., Abdelaty, I., & Sherif, M. (2019). Evaluation of potential
impact of Grand Ethiopian Renaissance Dam on seawater intrusion in the
Nile Delta aquifer. International Journal of Environmental Science and
Technology, 16(5), 2321-2332.
es
• Stefan Liersch, Hagen Koch, & Fred Fokko Hattermann. (2017).
Management Scenarios of the Grand Ethiopian Renaissance Dam and
Their Impacts under Recent and Future Climates. Water,9(10), 728.
• Tawfik, R. (2016). The Grand Ethiopian Renaissance Dam: a benefit-
sharing project in the Eastern Nile?. Water International, 41(4), 574-592.
• Basheer, M., Wheeler, K. G., Ribbe, L., Majdalawi, M., Abdo, G., & Zagona,
E. A. (2018). Quantifying and evaluating the impacts of cooperation in
transboundary river basins on the Water-Energy-Food nexus: The Blue Nile
Basin. Science of the Total Environment, 630, 1309-1323.
• Abd-Elhamid, H., Abdelaty, I., & Sherif, M. (2019). Evaluation of potential
impact of Grand Ethiopian Renaissance Dam on seawater intrusion in the
Nile Delta aquifer. International Journal of Environmental Science and
Technology, 16(5), 2321-2332.
1 out of 10
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.