Assessment Framework
The presentation of final assessment is exploring on the
case of Grand Ethiopian Renaissance Dam.
In this final assessment the overall work has been
distributed between me and my group member.
I have to complete my own part of work and rest of the part
will be complete by my group member.
The case has been discussed by me
Then I have analyse the essential aspects of project and its
complexities in the context of GERD project.
Viswas
ai Ravi
Document Page
Methods
With the help of CQU library I have taken the literature review in
the context of different authors.
All the topics and relevant journal and articles are discussed
between me and my group member.
With the help of articles I have analysed some aspects:
Quantifying and evaluating the impacts of cooperation in transboundary
river basins on the Water-Energy-Food nexus: The Blue Nile Basin
How has the Grand Ethiopian Renaissance Dam changed the legal, political,
economic and scientific dynamics in the Nile Basin?
These are the essential tasks which are done by me in financial
assessment.
Viswas
ai Ravi
Document Page
Problems and challenges
There are several challenges which develop some difficulties
for me:
There are some points of the project in which I have faced
difficulties to understand them effectively.
At the time of starting up the project I have failed in
accessing the proper information and developing better
communication with my team members.
Viswas
ai Ravi
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Framework development
The final assessment is refer in the context of project
complexities
I have analyse the impact of project complexities can
impact on the project performance.
Along with this I have analyse all the factors which impact
on the stakeholders, design and implementation of project.
All the parts which are done by me are analysed with the
help of CQU library
Nikhil
Kumar
Nimma
Document Page
Methodology
The methods which are used by me in completing the final
assessment are discussed with my team members.
The literature review in the context of GERD project in the
view of different authors has helped me in accomplishing the
final assessment.
With the help of articles I have analysed some aspects:
Management Scenarios of the Grand Ethiopian
Renaissance Dam and Their Impacts under Recent and
Future Climates
Evaluation of potential impact of Grand Ethiopian
Renaissance Dam on seawater intrusion in the Nile Delta
Nikhil
Kumar
Nimma
Document Page
Challenges
There are some challenges which are faced by me in
accomplishing the are:
Lack of communication with team members has developed
understanding issues which take time to complete the final
assessment.
In analysing some points I was facing various problem but
all these problems are solved by understanding all the
project concepts.
Nikhil
Kumar
Nimma
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Yihdego, Z., Rieu-Clarke, A., & Cascão, A. (2016). How has the Grand
Ethiopian Renaissance Dam changed the legal, political, economic and
scientific dynamics in the Nile Basin? Water International, 41(4), 503-
511.
Stefan Liersch, Hagen Koch, & Fred Fokko Hattermann. (2017).
Management Scenarios of the Grand Ethiopian Renaissance Dam and
Their Impacts under Recent and Future Climates. Water,9(10), 728.
Basheer, M., Wheeler, K. G., Ribbe, L., Majdalawi, M., Abdo, G., &
Zagona, E. A. (2018). Quantifying and evaluating the impacts of
cooperation in transboundary river basins on the Water-Energy-Food
nexus: The Blue Nile Basin. Science of the Total Environment, 630,
1309-1323.
Abd-Elhamid, H., Abdelaty, I., & Sherif, M. (2019). Evaluation of
potential impact of Grand Ethiopian Renaissance Dam on seawater
intrusion in the Nile Delta aquifer. International Journal of
Environmental Science and Technology, 16(5), 2321-2332.