This case study examines the project management of a housing project located at 6 Parella Grove, Glendenning. The report begins by outlining the project scope, nature, and key personnel involved, including the project manager, architect, and various engineers. It then delves into the project team structure, providing a flowchart to illustrate the project manager's responsibilities and detailing the roles of each team member. The study further analyzes the project manager's performance across the five stages of team development: forming, storming, norming, performing, and adjourning. Related findings are connected to Bruce Tuckman's theory of team development. The report concludes with lessons learned and recommendations for future projects, emphasizing the importance of effective team leadership and clear project management strategies to ensure project success.

Running head: PROJECT MANAGEMENT
Housing project at 6 Parella Grove Glendenning
Name of the Student:
Name of the University:
Housing project at 6 Parella Grove Glendenning
Name of the Student:
Name of the University:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Table of Contents
1. Introduction..................................................................................................................................2
1.1 Project scope..........................................................................................................................2
1.2 Nature and size......................................................................................................................2
1.3 Key people involved..............................................................................................................2
2. Project team structure and role of project manager.....................................................................3
2.1 Flowchart illustrates role of project manager........................................................................3
2.2 Team members role and structure..........................................................................................6
3. Role of project manager performed during different stages of the team development process 10
4. Related findings with theories...................................................................................................12
5. Conclusion.................................................................................................................................13
6. Recommendations......................................................................................................................13
References......................................................................................................................................15
Table of Contents
1. Introduction..................................................................................................................................2
1.1 Project scope..........................................................................................................................2
1.2 Nature and size......................................................................................................................2
1.3 Key people involved..............................................................................................................2
2. Project team structure and role of project manager.....................................................................3
2.1 Flowchart illustrates role of project manager........................................................................3
2.2 Team members role and structure..........................................................................................6
3. Role of project manager performed during different stages of the team development process 10
4. Related findings with theories...................................................................................................12
5. Conclusion.................................................................................................................................13
6. Recommendations......................................................................................................................13
References......................................................................................................................................15

2PROJECT MANAGEMENT
1. Introduction
1.1 Project scope
The project work is based on housing project at 6 Parrella Grove, Glendenning. The
scope of this project is to review the blueprints, drawings as well as project related
specifications. The project contractor will supply competent labor, project tools, equipments and
services, testing devices and the items required for expense are design, supply, field installation,
design and quality assurance.
1.2 Nature and size
Based on the nature and size of the housing project, there are two roles which are
summarized in the project such as:
Leader: The project manager plays a key role in making bigger decisions related to
construction work and provides direction to the team members when they are facing problems on
the work site and then reports to board of directors (Buvik and Rolfsen 2015). They prepare plus
negotiate estimation of cost, budget and project timeframe.
Member: The project team is involved to coordinate with the design consultants and
architects to make sure that everything is working properly as per the project plan (Meng and
Boyd 2017). As a member, the project manager reports on work progress to board of directors
and budget related matters to project clients.
1.3 Key people involved
Following are key people those are involved in building the house as follows:
1. Introduction
1.1 Project scope
The project work is based on housing project at 6 Parrella Grove, Glendenning. The
scope of this project is to review the blueprints, drawings as well as project related
specifications. The project contractor will supply competent labor, project tools, equipments and
services, testing devices and the items required for expense are design, supply, field installation,
design and quality assurance.
1.2 Nature and size
Based on the nature and size of the housing project, there are two roles which are
summarized in the project such as:
Leader: The project manager plays a key role in making bigger decisions related to
construction work and provides direction to the team members when they are facing problems on
the work site and then reports to board of directors (Buvik and Rolfsen 2015). They prepare plus
negotiate estimation of cost, budget and project timeframe.
Member: The project team is involved to coordinate with the design consultants and
architects to make sure that everything is working properly as per the project plan (Meng and
Boyd 2017). As a member, the project manager reports on work progress to board of directors
and budget related matters to project clients.
1.3 Key people involved
Following are key people those are involved in building the house as follows:
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT
Project Manager
Project Sponsor
Architect
Civil Engineer
Contractors
Geotechnical Engineer
Structural Engineer
Building Designer
Interior Designer
Quality Surveyor
2. Project team structure and role of project manager
2.1 Flowchart illustrates role of project manager
The project manager takes responsibility of entire aspects related to construction of
building at 6 Parrella Grove, Glendenning. The manager works closely with the architects and
engineers on the development work. The role of project manager is to situate the budget and
oversee personnel of the building project. Following are role of project manager in the
construction work such as:
The project manager supervises construction of the residential structures along with
building of house (Senaratne and Gunawardane 2015).
They interface with the project clients in addition to update on the project progress, hire
required personnel and manage the regular activities.
Project Manager
Project Sponsor
Architect
Civil Engineer
Contractors
Geotechnical Engineer
Structural Engineer
Building Designer
Interior Designer
Quality Surveyor
2. Project team structure and role of project manager
2.1 Flowchart illustrates role of project manager
The project manager takes responsibility of entire aspects related to construction of
building at 6 Parrella Grove, Glendenning. The manager works closely with the architects and
engineers on the development work. The role of project manager is to situate the budget and
oversee personnel of the building project. Following are role of project manager in the
construction work such as:
The project manager supervises construction of the residential structures along with
building of house (Senaratne and Gunawardane 2015).
They interface with the project clients in addition to update on the project progress, hire
required personnel and manage the regular activities.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
The manager ensures that the building of house is followed building as well as safety
codes (Ilin et al. 2016).
Manages daily work activities, implements as well as technical consultants engage on the
assignments of project clients.
Report progress on the project and maintain as well as update reporting of the project,
checkpoints and financial reports to higher standards.
Planning and visiting to existing clients, along with ensuring that the client can receive
adequate support to make sure about its relationships (Franz et al. 2016).
Developing of contracts with the senior staffs in account throughout the implementation
phase.
Coordination needed with support levels to the project team members plus training.
Producing the project reports for the building project at agreed intervals and substantive
actions which are required (Kerzner and Kerzner 2017).
The manager ensures that the building of house is followed building as well as safety
codes (Ilin et al. 2016).
Manages daily work activities, implements as well as technical consultants engage on the
assignments of project clients.
Report progress on the project and maintain as well as update reporting of the project,
checkpoints and financial reports to higher standards.
Planning and visiting to existing clients, along with ensuring that the client can receive
adequate support to make sure about its relationships (Franz et al. 2016).
Developing of contracts with the senior staffs in account throughout the implementation
phase.
Coordination needed with support levels to the project team members plus training.
Producing the project reports for the building project at agreed intervals and substantive
actions which are required (Kerzner and Kerzner 2017).

5PROJECT MANAGEMENT
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT
Figure 1: Flowchart of role of project manager
(Source: Created by author)
Figure 1: Flowchart of role of project manager
(Source: Created by author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
2.2 Team members role and structure
Following table shows the role and responsibilities of the project team members those are
involved in the construction project work such as:
Role of stakeholder Responsibilities
Project Manager The project manager ensures that the construction venture is
complied with current construction codes as well as authorized
requirements (Tabassi et al. 2016).
The manager allocates the resources as well as ensures that there
is no shortage of resources working in the project.
Project Sponsor The sponsor approves the key deliverables of the construction
project work, initiates the project review and supports process for
review the work.
The sponsor ensures that the project is under control by collecting
fund for the project (Khoshtale and Adeli 2016).
Architect The architect prepares map of the house based on the necessities
of project client by using computer hardware.
Discussing about the financial targets (Laufer et al. 2015).
Understanding limitations plus potential of construction site.
Civil engineer The civil engineer has executed construction of house based on
provided map from the architect side.
They examined the land as well as soil on which the house is
being created and assessed the quality.
They prepared blueprint of house. The job involved mathematical
2.2 Team members role and structure
Following table shows the role and responsibilities of the project team members those are
involved in the construction project work such as:
Role of stakeholder Responsibilities
Project Manager The project manager ensures that the construction venture is
complied with current construction codes as well as authorized
requirements (Tabassi et al. 2016).
The manager allocates the resources as well as ensures that there
is no shortage of resources working in the project.
Project Sponsor The sponsor approves the key deliverables of the construction
project work, initiates the project review and supports process for
review the work.
The sponsor ensures that the project is under control by collecting
fund for the project (Khoshtale and Adeli 2016).
Architect The architect prepares map of the house based on the necessities
of project client by using computer hardware.
Discussing about the financial targets (Laufer et al. 2015).
Understanding limitations plus potential of construction site.
Civil engineer The civil engineer has executed construction of house based on
provided map from the architect side.
They examined the land as well as soil on which the house is
being created and assessed the quality.
They prepared blueprint of house. The job involved mathematical

8PROJECT MANAGEMENT
estimation as well as accurateness (Takey and de Carvalho 2015).
They performed different calculations before implementation of
project work.
Contractor The contractor is responsible to provide materials, labors,
engineering vehicles as well as tools required for the construction
of house building (Zhao, Hwang and Lee 2016).
They hired specialized subcontractors for performing portions of
the construction related work.
Geotechnical
Engineer
They will confirm soil class to enable design of house building
project. They know that soil class is required to determine final
price for the construction work.
They include accessing data from field, finding ways to make sure
of foundations, designing the foundations as well as overseeing
the work on the construction site (Van Os et al. 2015).
They investigate subsurface conditions and also materials;
determine mechanical plus chemical properties of the construction
materials.
Structural Engineer The engineer designs foundations, concretes the slabs and other
structural elements to make sure about integrity of structure of
house.
They are responsible to provide technical details for project
activities to perform at the site (Zhang and Shen 2015).
Building Designer They are engaged to organize working plans for lodgment to the
estimation as well as accurateness (Takey and de Carvalho 2015).
They performed different calculations before implementation of
project work.
Contractor The contractor is responsible to provide materials, labors,
engineering vehicles as well as tools required for the construction
of house building (Zhao, Hwang and Lee 2016).
They hired specialized subcontractors for performing portions of
the construction related work.
Geotechnical
Engineer
They will confirm soil class to enable design of house building
project. They know that soil class is required to determine final
price for the construction work.
They include accessing data from field, finding ways to make sure
of foundations, designing the foundations as well as overseeing
the work on the construction site (Van Os et al. 2015).
They investigate subsurface conditions and also materials;
determine mechanical plus chemical properties of the construction
materials.
Structural Engineer The engineer designs foundations, concretes the slabs and other
structural elements to make sure about integrity of structure of
house.
They are responsible to provide technical details for project
activities to perform at the site (Zhang and Shen 2015).
Building Designer They are engaged to organize working plans for lodgment to the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT
assembly for authorization.
They are responsible for visual appearance of buildings as well as
structure before design of final structural work.
They are developing the facility based on design concepts as well
as needs specified by means of project client.
Interior Designer The designer analyzes needs of the client, creates the project plan
and project specifications, and ensures that the project work is to
be finished as per proposed timeline and estimated budget
(Hwang, Zhu and Tan 2017).
They furnish the space with advanced knowledge of mechanical
designing elements.
Quality Surveyor They are responsible for cost of the building of house project from
the initial estimation and from final acquisitions of the
construction materials. They perform on going analysis of the
maintenance cost as well as repair related work (Marsh 2017).
They perform a feasibility study based on requests of project
clients.
The quality surveyor checks and inspects for quality of raw
materials required for the construction work.
They analyze completed work plus arrange payment to the
contractors involved in this construction work.
assembly for authorization.
They are responsible for visual appearance of buildings as well as
structure before design of final structural work.
They are developing the facility based on design concepts as well
as needs specified by means of project client.
Interior Designer The designer analyzes needs of the client, creates the project plan
and project specifications, and ensures that the project work is to
be finished as per proposed timeline and estimated budget
(Hwang, Zhu and Tan 2017).
They furnish the space with advanced knowledge of mechanical
designing elements.
Quality Surveyor They are responsible for cost of the building of house project from
the initial estimation and from final acquisitions of the
construction materials. They perform on going analysis of the
maintenance cost as well as repair related work (Marsh 2017).
They perform a feasibility study based on requests of project
clients.
The quality surveyor checks and inspects for quality of raw
materials required for the construction work.
They analyze completed work plus arrange payment to the
contractors involved in this construction work.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT
Figure 2: Team structure
(Source: Created by author)
The above team structure is hierarchy team structure which places people those are
performing similar works in the groups under the project manager. The higher level of team
structure delegates authority to take decisions to lower level (Ilin et al. 2016). Major decisions
are being taken from top levels.
Figure 2: Team structure
(Source: Created by author)
The above team structure is hierarchy team structure which places people those are
performing similar works in the groups under the project manager. The higher level of team
structure delegates authority to take decisions to lower level (Ilin et al. 2016). Major decisions
are being taken from top levels.

11PROJECT MANAGEMENT
In associative structure, there is no in-charge and all tasks are performed by equal
members of the structure linked in smaller groups for accomplishing the project tasks. The
bigger decisions and strategies are drive the team forward.
In matrix team structure, employees of the organization with the matrix structures retain
up-and-down the chain relationships of the hierarchical structure. It has relations with more
groups they should work with (Khoshtale and Adeli 2016). It allows decision making by the
group of peers while retains responsibility of group to carry strategic decisions.
3. Role of project manager performed during different stages of the team
development process
Walker (2015) stated that it is a key significant requirement of the project manager is to
recognize five stages of team development process and administer the project team throughout
the stages such that they can employ successfully to manage the project tasks. Following are
different stages of team development process such as:
Forming stage
In this stage, the team members are being taxing each other in addition to the project
manager along with discovering where they are fitting to the construction work of house building
project. The project manager checks clarity in addition to direction of the team members. The
function of project manager is to be clear about the goals of team and provide clearer direction
on the construction project work (Khoshtale and Adeli 2016). The project executive works with
the group to found the team norms in favor of collaborating mutually.
In associative structure, there is no in-charge and all tasks are performed by equal
members of the structure linked in smaller groups for accomplishing the project tasks. The
bigger decisions and strategies are drive the team forward.
In matrix team structure, employees of the organization with the matrix structures retain
up-and-down the chain relationships of the hierarchical structure. It has relations with more
groups they should work with (Khoshtale and Adeli 2016). It allows decision making by the
group of peers while retains responsibility of group to carry strategic decisions.
3. Role of project manager performed during different stages of the team
development process
Walker (2015) stated that it is a key significant requirement of the project manager is to
recognize five stages of team development process and administer the project team throughout
the stages such that they can employ successfully to manage the project tasks. Following are
different stages of team development process such as:
Forming stage
In this stage, the team members are being taxing each other in addition to the project
manager along with discovering where they are fitting to the construction work of house building
project. The project manager checks clarity in addition to direction of the team members. The
function of project manager is to be clear about the goals of team and provide clearer direction
on the construction project work (Khoshtale and Adeli 2016). The project executive works with
the group to found the team norms in favor of collaborating mutually.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 18
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.