Project Report: Global Health Record System for Health Organisation

Verified

Added on  2020/04/01

|27
|5228
|134
Project
AI Summary
This project report presents a comprehensive analysis of a Global Health Record System designed for a health organization. It begins with an introduction and a strong business case, highlighting the need for improved information access, communication, and data management within the healthcare sector. A detailed SWOT analysis assesses the project's strengths, weaknesses, opportunities, and threats, providing a strategic overview. The report outlines project objectives, assumptions, and constraints, followed by a clear definition of the project scope, including a scope statement and a high-level Work Breakdown Structure (WBS). A literature review explores best practices in project delivery models and relevant project topics. The selected project delivery method is discussed, along with the processes, advantages, and disadvantages. Finally, the report details management plans, including human resource management, stakeholder analysis, a project timetable, feasibility analysis, and project governance. The project aims to create an integrated system for storing patient and doctor data, improving data access and overall performance within the health organization.
Document Page
Running head: PROJECT REPORT
Project Report: Global Health Record System for Health Organisation
Name of the Student:
Student ID:
Name of the University:
Author’s note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT REPORT
Table of Contents
1. Project Title.................................................................................................................................2
2. Introduction..................................................................................................................................2
3. Business Case..............................................................................................................................2
3.1 Project Background...............................................................................................................2
3.2 Project Analysis: SWOT Analysis.........................................................................................3
3.3 Project Objectives..................................................................................................................6
3.4 Assumptions and Constraints................................................................................................6
4. Project Scope...............................................................................................................................7
4.1 Project Scope Statement........................................................................................................7
4.2 High Level WBS....................................................................................................................8
5. Literature Review......................................................................................................................11
5.1 Literature Summary on Project/Program Best Practice Delivery Models...........................11
5.1.1 Project Delivery Methods.............................................................................................11
5.2 Literature Summary Related to Project Topic.....................................................................12
6. Selected Project Delivery Method.............................................................................................12
6.1 Processes – Phases in Project Delivery System...................................................................12
Document Page
2PROJECT REPORT
6.1.1 Advantages of Project Delivery System.......................................................................13
6.1.2 Disadvantages and Risk in Project Delivery System....................................................13
6.2 Contracting and Procurement Methods...............................................................................13
7. Management Plans and Delivery System Implementation........................................................14
7.1 Human Resource Management Plan....................................................................................14
7.1.1 Organizational and operation chart...............................................................................14
7.2 Analysis of Stakeholder and Communication Management Plan.......................................15
7.3 Project Timetable.................................................................................................................16
7.4 Feasibility Analysis.............................................................................................................19
7.5 Project Governance..............................................................................................................20
8. Conclusion.................................................................................................................................20
9. References..................................................................................................................................22
Document Page
3PROJECT REPORT
1. Project Title
The title of the project is “Global Health Record System for Health Organisation” and it
is formed for implementing an information system that could store the health records of the
patients, doctors, and diseases from all over the world.
2. Introduction
The project management holds an integral role is successful completion of the project
operations and its simplified development and management. The development of the project
would help in integrating the development of the effective and improved analysis of the system
management and development process. The development of the project would be helpful for the
integration of the database for the records of the patients and doctors. The following assignment
would be developed for evaluation of the project business case, background, swot analysis,
objectives, assumptions and constraints, scope, literature review on the topic, summary on
project/program best practice delivery models, selected project delivery method, and
management plans and delivery system implementation would be done for the project of Global
Health Record System for Health Organisation.
3. Business Case
3.1 Project Background
The project is developed for assisting the deployment of the effective and improved
organization processing within the information processing of the organization. The involvement
of the project integration would be helpful for forming the supplementary development of the
operations of information seeking by health organizations. The project would develop an
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT REPORT
integrated information system for the storing the data and information related to the patients and
doctors. The analysis would help in forming the situational analysis of the project in terms of
technical and financial feasibility. The issues that could be solved by development of the health
record system are,
Lack of information access
Delay in treatment of the patients
Issues in communication among the doctors and patients
Absence of an overview of the health organization
The implementation of the project would be helpful for critical evaluation of the
technology for developing solutions to these problems. The health record system would serve the
purpose of the communication and information transmission for various operations of the health
organization. It would also provide scope for the backing up the data in an integrated storage
system.
3.2 Project Analysis: SWOT Analysis
The SWOT analysis is the concept of forming the effective and improved evaluation of
the project of development of health record system for health organization. The analysis of the
project is shown in the following diagram,
Document Page
5PROJECT REPORT
Figure 1: SWOT Analysis of the Project
(Source: Created by the author)
Strengths The strengths of the project of development of the health record system
are integrated database, improved data transfer and access, and use of
technology. The use of the integrated database would be helpful for
developing the effective and smart project operations. The use of the
integrated information system management would be helpful for
conveying the development of the information. The data transfer process
would be facilitated due to the deployment of the system and it would
form the development of the improved analysis methods.
Weaknesses The weaknesses of the project of development of the health record system
Threats
Cyber Criminal Activities
Data lost and manipulation
Crashing of the system
Weaknesses
Absence of prior knowledge
Probability of Technical Errors
Issues in alignment of database
Opportunities
Communication Improvement
Global Data Integration
Faster Information Processing
Strengths
Integrated database,
Improved data transfer and access
Use of technology
SWOT Analysis
Document Page
6PROJECT REPORT
are absence of prior knowledge, probability of technical errors, and issues
in alignment of database. The development of the project would form the
analysis of the effective and improved information management. The
completion of the project implementation can be benefitted by the use of
the supportive data management process. However, the issues of absence
of prior knowledge, probability of technical errors, and issues in
alignment of database would form the major conflict in the completion of
the project operations.
Opportunities The opportunities of the project of development of the health record
system are communication improvement, global data integration, and
faster information processing. The health record system would be helpful
for carrying out the analysis of the project integration management and its
synthetic development of the operations. The analysis of the opportunities
would tend to form the development of the system integration and
development.
Threats The threats of the project of development of the health record system are
cyber criminal activities, data lost and manipulation, and crashing of the
system. The project requires the use of technical development and
processing. Hence it is possible that the use of the technology would bring
about the issues and problems of running the information system
development. The threats of the project are based on the exploitation and
formation of the issues in the information system for health records.
Table 1: SWOT Analysis of the Project
(Source: Created by the author)
3.3 Project Objectives
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT REPORT
The project titled Global Health Record System for Health Organisation is developed for
implementing an information system that could store the health records of the patients, doctors,
and diseases from all over the world. The objectives of the project are,
To develop a health record system for the health organization
To form the effective transmission of the information at required places
To support the deployment of the supplementary management of the information
To integrate the data about the patients and doctors on a single database platform
To increase the performance of data access within the health organization
3.4 Assumptions and Constraints
The assumptions of the project titled Global Health Record System for Health
Organisation are given below,
Timely Completion of the project: Global Health Record System for Health
Organisation Project would be completed in the estimated time duration as per the plan
Operation Improvement for Health Organization: Global Health Record System for
Health Organisation Project would be successful in implementing the development of the data
transfer
Accumulation of Project Resources: The resources required in the project would be
easily accumulated and it would serve the purpose of developing the system
Document Page
8PROJECT REPORT
The constraints of the project titled Global Health Record System for Health Organisation
are given below,
Technology Dependency: Global Health Record System for Health Organisation Project
would be dependent on the technological knowledge of the organization. It is possible that the
health organization might not be able to successfully implement the system and convey their
requirements of the project.
Security Limitation: The limited security functions for the Global Health Record
System for Health Organisation Project is another constraint for the operations of the
organization. It is possible that the project would comprise of some security structure that would
inhabit the deployment of the project operations.
4. Project Scope
4.1 Project Scope Statement
The project scope statement for the Global Health Record System for Health
Organisation Project is given below,
“The project involves the development of a health record system for the health
organization for forming the effective transmission of the information at required places and
supporting the deployment of the supplementary management of the information. The successful
implementation of the project would help in integrating the data about the patients and doctors
on a single database platform and increasing the performance of data access within the health
organization.”
Document Page
9PROJECT REPORT
4.2 High Level WBS
The high level WBS for the Global Health Record System for Health Organisation
Project can be shown in both table and diagram format,
In table format,
WBS Task Name
0 Global Health Record System for Health Organization
1 Project Initiation and Plan Development Phase
1.1 Project Scope Analysis
1.2 Charter Documentation
1.3 Development of PID
1.4 Project Resources are gathered
1.5 Plan outline development
1.6 Resource allocation to plan
1.7 Plan review
M1 Plan is Approved
2 Global Health Record System Design Phase
2.1 Analysis of Design Requirements
2.2 Design Methodology is selected
2.3 System design is developed
2.4 Design Review in terms of feasibility and sustainability
M2 Design is Approved
3 Development of Global Health Record System
3.1 Integrated Database is developed
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PROJECT REPORT
3.2 Health Records data is stored on the integrated database
3.3 System Analysis is done
3.4 User Interface for the system is built
3.5 Functions of the system is Programmed
3.6 Security Functions are aligned
3.7 Software and Hardware components are integrated
3.8 Server Connection for Global Data Integration
3.9 High Security (IDS/IPS, Encryption, Authorization) is applied
M3 Global Health Record System is Developed
4 Testing of the System Developed
4.1 User Function Testing
4.2 Prototyping and Simulation testing
4.3 Black box and white box testing
M4 Testing Results are documented
5 Final Documents
5.1 Making Final Project Document
5.2 Reviewing the documents made
5.3 Submission of the documents
5.4 Signed off
M5 Project is Closed
Table 2: Project WBS
(Source: Created by the author)
Document Page
11PROJECT REPORT
In diagram format,
0 - Global Health Record
System for Health
Organisation
1- Project Initiation and Plan
Development Phase
1.1 - Project Scope Analysis
1.2 - Charter Documentation
1.3 - Development of PID
1.4 - Project Resources are
gathered
1.5 - Plan outline
development
1.6 - Resource allocation to
plan
1.7 - Plan review
M1 - Plan is Approved
2 - Global Health Record
System Design Phase
2.1 - Analysis of Design
Requirements
2.2 - Design Methodology is
selected
2.3 - System design is
developed
2.4 - Design Review in terms
of feasibility and
sustainability
M2 - Design is Approved
3 - Development of Global
Health Record System
3.1 - Integrated Database is
developed
3.2 - Health Records data is
stored on the integrated
database
3.3 - System Analysis is done
3.4 - User Interface for the
system is built
3.5 - Functions of the system
is Programmed
3.6 - Security Functions are
aligned
3.7 - Software and Hardware
components are integrated
3.8 - Server Connection for
Global Data Integration
3.9 - High Security (IDS/IPS,
Encryption, Authorization)
is applied
M3 - Global Health Record
System is Developed
4 - Testing of the System
Developed
4.1 - User Function Testing
4.2 - Prototyping and
Simulation testing
4.3 - Black box and white box
testing
M4 - Testing Results are
documented
5 - Final Documents
5.1 - Making Final Project
Document
5.2 - Reviewing the
documents made
5.3 - Submission of the
documents
5.4 - Signed off
M5 - Project is Closed
Figure 2: Project WBS
(Source: Created by the author)