Globalization's Influence on Pizza Hut UK: Operations, Marketing, HR
VerifiedAdded on  2020/12/09
|23
|4183
|393
Report
AI Summary
This report examines the impact of globalization on Pizza Hut UK's operations, marketing, and HR. It begins with an introduction to globalization and its benefits, then outlines the project's aims, objectives, and research questions. A project management plan, including cost, time, scope, and risk assessments, is presented, along with a work breakdown structure and Gantt chart. The research methodology, including philosophy, approach, design, data collection (primary data via questionnaires), and analysis (qualitative and quantitative), is detailed. Data analysis and interpretation are provided, organized around key themes such as globalization's positive impact, its effect on organizational functions, increased trade, and transparency. The findings are presented through charts and interpretations. The report concludes with recommendations and a reflection on the value of the research, supported by references.

Globalisation
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................1
P 1 Aims and objectives..............................................................................................................1
P 2 Project management plans ...................................................................................................2
P 3 Work break down structure and Gantt chart ........................................................................3
P 4 Research methodology..........................................................................................................4
P 5 Data analysis and data interpretation ...................................................................................5
P 6 Recommendations and Conclusion ....................................................................................18
P 7 Reflection on the value of research ....................................................................................18
REFERENCES..............................................................................................................................20
INTRODUCTION...........................................................................................................................1
P 1 Aims and objectives..............................................................................................................1
P 2 Project management plans ...................................................................................................2
P 3 Work break down structure and Gantt chart ........................................................................3
P 4 Research methodology..........................................................................................................4
P 5 Data analysis and data interpretation ...................................................................................5
P 6 Recommendations and Conclusion ....................................................................................18
P 7 Reflection on the value of research ....................................................................................18
REFERENCES..............................................................................................................................20

INTRODUCTION
Globalisation is determined as enhancing procedure of mutuality and interrelated among
various political, societal and economic elements of worldwide. There are many benefits of
globalization such as foreign direct investment, technological innovation, economies of scale.
The procedure of globalization gives golden possibility for humankind of poverty
world(Lambregts, Beerepoot and Kloosterman, eds., 2015). The economic globalization includes
product and services, economic resources of capital, technology and information. There are three
main fields such as economic, cultural and political globalization. This case study is based on
Pizza hut UK. Pizza Hut started in 1958 in Wichita USA. The world's first Pizza Hat restaurant
by borrowing $600 by Dan and Frank Camey. There are 10,000 of US working in over 260
restaurants up and down nation, serving 3 Million guests in month. International franchise and
restaurant chain. It is the subsidiary of Yum! Brands, Inc., one of the world's biggest restaurant
organizations. This report will analysis impact of globalization on business operation of Pizza
hut. It will devise aims and objective of project, produce project management plan that covers
cost, time, scope, communication, risk, quality and resources. It will produce work break down
structure and Gantt chart to give time frame and stages of completion. There are various positive
and negative impact of Pizza Hut food on health globally. Frozen pizzas and ones created in
large pizza chains have in previous criticized for their amount high salt, fat and calories that
negative impact on health. The positive effect on metabolism olive oil reduce bad cholesterol and
raise good one and prevent heart diseases.
P 1 Aims and objectives
Research Aim:
To analyse the impact of globalisation on operations, marketing and HR.: A case study of
Pizza hut UK
Research Objectives:
ï‚· To find out meaning and importance of globalisation.
ï‚· To determine impact of globalisation on business operation of Pizza hurt.
ï‚· To recommend that ways to overcome of challenges of globalization.
Research Questions:
ï‚· What is the meaning and importance of globalization?
ï‚· What was the impact of globalization on business operation of Pizza hut?
1
Globalisation is determined as enhancing procedure of mutuality and interrelated among
various political, societal and economic elements of worldwide. There are many benefits of
globalization such as foreign direct investment, technological innovation, economies of scale.
The procedure of globalization gives golden possibility for humankind of poverty
world(Lambregts, Beerepoot and Kloosterman, eds., 2015). The economic globalization includes
product and services, economic resources of capital, technology and information. There are three
main fields such as economic, cultural and political globalization. This case study is based on
Pizza hut UK. Pizza Hut started in 1958 in Wichita USA. The world's first Pizza Hat restaurant
by borrowing $600 by Dan and Frank Camey. There are 10,000 of US working in over 260
restaurants up and down nation, serving 3 Million guests in month. International franchise and
restaurant chain. It is the subsidiary of Yum! Brands, Inc., one of the world's biggest restaurant
organizations. This report will analysis impact of globalization on business operation of Pizza
hut. It will devise aims and objective of project, produce project management plan that covers
cost, time, scope, communication, risk, quality and resources. It will produce work break down
structure and Gantt chart to give time frame and stages of completion. There are various positive
and negative impact of Pizza Hut food on health globally. Frozen pizzas and ones created in
large pizza chains have in previous criticized for their amount high salt, fat and calories that
negative impact on health. The positive effect on metabolism olive oil reduce bad cholesterol and
raise good one and prevent heart diseases.
P 1 Aims and objectives
Research Aim:
To analyse the impact of globalisation on operations, marketing and HR.: A case study of
Pizza hut UK
Research Objectives:
ï‚· To find out meaning and importance of globalisation.
ï‚· To determine impact of globalisation on business operation of Pizza hurt.
ï‚· To recommend that ways to overcome of challenges of globalization.
Research Questions:
ï‚· What is the meaning and importance of globalization?
ï‚· What was the impact of globalization on business operation of Pizza hut?
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

ï‚· How does overcome the challenges of globalization?
P 2 Project management plan
Task Name Duration Start Finish Predecessors
Design 1 day Wed 9/26/18 Wed 9/26/18
Development of Project with initial
document 1 day Thu 9/27/18 Thu 9/27/18 1
Develop 1 day Fri 9/28/18 Fri 9/28/18 2
Scope of project 1 day Mon 10/1/18 Mon 10/1/18 3
Collection of data 1 day Tue 10/2/18 Tue 10/2/18 4
Closure 1 day Wed 10/3/18 Wed 10/3/18 5
There are many aspects covers in plan of project management such as cost, scope, time,
risk, communication and resources. Therefore, project manager make sure that covering all
aspects in the project. These aspects are as following
Cost: It is very essential aspect to determine cost of project. It includes labour cost, production
cost, resource etc. Therefore, project manager make sure that deciding cost with allocated budget
and reducing wastage in the project.
Time: It is the most essential aspect that completing any of work or project on time duration.
Therefore, project manager make sure that availability of resources and project is completed on
fixed time duration(Zaitseva and et.al., 2016).
Communication: Without communication, there is no possibility to manage any project or
work. Therefore, project manager make sure that effective interaction between labour. This helps
in completion of project on time duration.
Risk: It is very important to determine and reduce risk that effects in project completion. So that,
project manager follow various ways to overcome all types of risk in project. It includes high
cost of labour, unavailability of resources, technology issues, lack of employees etc.
Quality: It is essential that use high quality resources for completion of project. So that, project
manager make sure that improving quality of all kind of resources that utilise in project
completion(Luongo and et.al., 2015).
Resources: It is also essential that improve all kind of resources are used in project. It includes
human resources, financial, technological etc. Therefore, project manager make sure that
utilization of resources effectively for project completion.
2
P 2 Project management plan
Task Name Duration Start Finish Predecessors
Design 1 day Wed 9/26/18 Wed 9/26/18
Development of Project with initial
document 1 day Thu 9/27/18 Thu 9/27/18 1
Develop 1 day Fri 9/28/18 Fri 9/28/18 2
Scope of project 1 day Mon 10/1/18 Mon 10/1/18 3
Collection of data 1 day Tue 10/2/18 Tue 10/2/18 4
Closure 1 day Wed 10/3/18 Wed 10/3/18 5
There are many aspects covers in plan of project management such as cost, scope, time,
risk, communication and resources. Therefore, project manager make sure that covering all
aspects in the project. These aspects are as following
Cost: It is very essential aspect to determine cost of project. It includes labour cost, production
cost, resource etc. Therefore, project manager make sure that deciding cost with allocated budget
and reducing wastage in the project.
Time: It is the most essential aspect that completing any of work or project on time duration.
Therefore, project manager make sure that availability of resources and project is completed on
fixed time duration(Zaitseva and et.al., 2016).
Communication: Without communication, there is no possibility to manage any project or
work. Therefore, project manager make sure that effective interaction between labour. This helps
in completion of project on time duration.
Risk: It is very important to determine and reduce risk that effects in project completion. So that,
project manager follow various ways to overcome all types of risk in project. It includes high
cost of labour, unavailability of resources, technology issues, lack of employees etc.
Quality: It is essential that use high quality resources for completion of project. So that, project
manager make sure that improving quality of all kind of resources that utilise in project
completion(Luongo and et.al., 2015).
Resources: It is also essential that improve all kind of resources are used in project. It includes
human resources, financial, technological etc. Therefore, project manager make sure that
utilization of resources effectively for project completion.
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

P 3 Work break down structure and Gantt chart
Work break down structure:
Date 26-09-2018 27-09-2018 28-09-2018
Design
Development of
Project with initial
document
Develop
Scope of project
Collection of data
Closure
Gantt Chart:
PROJECT PLANER - GANTT CHART
Period Highlight: 11
PERIODS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
1 Develop research title,
aims, objectives 1 1 1 1
100%
2 Collect secondary data (
literature resources) 2 3 2 3 100%
3 Analysis of secondary
data 6 3 6 3 100%
4 Decide of primary data
collection method 6 2 6 2 100%
5 Collect primary data 7 2 7 2 100%
6 Analysis of primary data 8 3 8 3 100%
7 Draft analysis and finding 8 3 8 3 100%
8 Draft final raport 9 1 9 1
100%
9
Final editing 10 1 10 1
100%
10 Printing, attachment and
submission 11 1 11 1
100%
Activity 11 6 1 5 8 60%
Activity 12 9 3 9 3 0%
Activity 13 9 6 9 7 50%
Activity 14 9 3 9 1 0%
Activity 15 9 4 8 5 1%
Activity 16 10 5 10 3 80%
Activity 17 11 2 11 5 0%
Activity 18 12 6 12 7 0%
Activity 19 12 1 12 5 0%
Activity 20 14 5 14 6 0%
Activity 21 14 8 14 2 44%
Activity 22 14 7 14 3 0%
Activity 23 15 4 15 8 12%
Activity 24 15 5 15 3 5%
Activity 25 15 8 15 5 0%
Activity 26 16 28 16 30 50%
% Complete (beyond plan)26-09-2018 to 05-12-2018 (11 weeks)
ACTIVITY PLAN START PLAN
DURATION
ACTUAL
START
ACTUAL
DURATION
PERCENT
COMPLETE
Plan Duration Actual Start % Complete Actual (beyond plan)
3
Work break down structure:
Date 26-09-2018 27-09-2018 28-09-2018
Design
Development of
Project with initial
document
Develop
Scope of project
Collection of data
Closure
Gantt Chart:
PROJECT PLANER - GANTT CHART
Period Highlight: 11
PERIODS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
1 Develop research title,
aims, objectives 1 1 1 1
100%
2 Collect secondary data (
literature resources) 2 3 2 3 100%
3 Analysis of secondary
data 6 3 6 3 100%
4 Decide of primary data
collection method 6 2 6 2 100%
5 Collect primary data 7 2 7 2 100%
6 Analysis of primary data 8 3 8 3 100%
7 Draft analysis and finding 8 3 8 3 100%
8 Draft final raport 9 1 9 1
100%
9
Final editing 10 1 10 1
100%
10 Printing, attachment and
submission 11 1 11 1
100%
Activity 11 6 1 5 8 60%
Activity 12 9 3 9 3 0%
Activity 13 9 6 9 7 50%
Activity 14 9 3 9 1 0%
Activity 15 9 4 8 5 1%
Activity 16 10 5 10 3 80%
Activity 17 11 2 11 5 0%
Activity 18 12 6 12 7 0%
Activity 19 12 1 12 5 0%
Activity 20 14 5 14 6 0%
Activity 21 14 8 14 2 44%
Activity 22 14 7 14 3 0%
Activity 23 15 4 15 8 12%
Activity 24 15 5 15 3 5%
Activity 25 15 8 15 5 0%
Activity 26 16 28 16 30 50%
% Complete (beyond plan)26-09-2018 to 05-12-2018 (11 weeks)
ACTIVITY PLAN START PLAN
DURATION
ACTUAL
START
ACTUAL
DURATION
PERCENT
COMPLETE
Plan Duration Actual Start % Complete Actual (beyond plan)
3

Gantt Chart is horizontal bar chart create as production control tool. It is made with
horizontal line stand for total time span task, break down into increase and vertical line stand for
project that create the project. From the above Gantt chart, start this project in 26-09-2018. There
are taken 3 days for collecting secondary data and also analysed these informations. In addition
to that there are taken 5 day for analysing data for completing project. Now on 5-12-2018(11
weeks) completed the project.
P 4 Research methodology
Research methodology: It is procedure used to gather data for aim of making decisions. It is the
organized analysis of methods applied to areas of research. It has analysed that to activity of
study on specific topic or project. The philosophic evaluation of analyse tools within discipline,
concern with abstract, theory and explore prospect of knowledge. This method helps in to attain
result in terms of achieve aims and objectives of research (Appadurai Giddens and Wallerstein,
2015).
Research philosophy: It is large topic that deals with sources, nature and growing of
knowledge. It is content about way of collection, analysis and utilize data of particular. For
assessing research philosophies in project that includes being aware and explicate beliefs and
premisses. Positivism and interpretivism are main types of research philosophies. In order to that,
interpretivism research philosophies refers lead to statistical analysis that depends on
quantifiable find. In addition to, interpretivism is connected with philosophic view of
impracticality and is utilized to team together diverse theories (Luongo and et.al., 2015). With
the help of it, attain result in order to accomplish aims and objective of project. In this context,
project manager use positivism research philosophy for analysis impact of globalization on their
business operations.
Research Approach: It is theory includes different kinds of stages of described activity that are
involved in terms of gathering information relating to specific projects. Deductive and inductive
are main research approaches. In order to deductive approach, attempt validity of premises in
hand. While inductive approach, approval to the growth of new approaches and generic. With the
help of it, project manager analysis impact of globalisation on business operation (Zaitseva and
et.al., 2016). Through it, to get result in order to that achieve aim of objective of project in an
effective manner.
4
horizontal line stand for total time span task, break down into increase and vertical line stand for
project that create the project. From the above Gantt chart, start this project in 26-09-2018. There
are taken 3 days for collecting secondary data and also analysed these informations. In addition
to that there are taken 5 day for analysing data for completing project. Now on 5-12-2018(11
weeks) completed the project.
P 4 Research methodology
Research methodology: It is procedure used to gather data for aim of making decisions. It is the
organized analysis of methods applied to areas of research. It has analysed that to activity of
study on specific topic or project. The philosophic evaluation of analyse tools within discipline,
concern with abstract, theory and explore prospect of knowledge. This method helps in to attain
result in terms of achieve aims and objectives of research (Appadurai Giddens and Wallerstein,
2015).
Research philosophy: It is large topic that deals with sources, nature and growing of
knowledge. It is content about way of collection, analysis and utilize data of particular. For
assessing research philosophies in project that includes being aware and explicate beliefs and
premisses. Positivism and interpretivism are main types of research philosophies. In order to that,
interpretivism research philosophies refers lead to statistical analysis that depends on
quantifiable find. In addition to, interpretivism is connected with philosophic view of
impracticality and is utilized to team together diverse theories (Luongo and et.al., 2015). With
the help of it, attain result in order to accomplish aims and objective of project. In this context,
project manager use positivism research philosophy for analysis impact of globalization on their
business operations.
Research Approach: It is theory includes different kinds of stages of described activity that are
involved in terms of gathering information relating to specific projects. Deductive and inductive
are main research approaches. In order to deductive approach, attempt validity of premises in
hand. While inductive approach, approval to the growth of new approaches and generic. With the
help of it, project manager analysis impact of globalisation on business operation (Zaitseva and
et.al., 2016). Through it, to get result in order to that achieve aim of objective of project in an
effective manner.
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Research Design: It is described as model of techniques select by investigators to join different
elements of study in a reasonably in an effective manner. It makes marginal partiality in
information and enhance reliance on the gathered and investigate data of project. There are five
types of research design that includes descriptive, correlation, semi-experimental, exploratory
etc. In this context, descriptive research design, investigator concerned in defining the research.
It is approach based research design that is made by collect, analysis and present gathers
information. Therefore, project manager utilize this design for analysis of impact of globalization
on business operation of Pizza hut.
Data Collection: It is procedure of gathering data from all the applicable sources to determine
response to research difficulty, test possibility and measure the conclusion. There are two
methods such as primary and secondary data collection. In primary method, researcher collect
information from interview, questionnaire, case study, focus group etc. While investigators
gather data form books, journals, online websites that involves in secondary methods
(Cunningham and Ferrell, 2015).Through it, to get result in terms of achieve aim and objectives
of research. In this context, researcher used collect data from primary methods that is
questionnaire for analysis impact of globalization on the operations of Pizza hut.
Data Analysis: It involves tow type of data analysis that is qualitative and quantitative data
analysis. In qualitative data analysis, collect data from questionnaire, interview, focus group etc.
In addition to that, researcher used the thematic analysis for analysis of collected data in their
research. With the help of it, investigator analysis data in form of themes that are connected with
question of research. Through it, project manager analysis impact of globalization on operations
of company. By this, analysis information, evaluate response in terms of attain result of research
in an effective manner.
Sampling: It means procedure of selecting portion of population. It is the choice of subset of
individual from population to figure features of entire group. It is the technique wherein each
unit of the population has equal and likely chance of being chosen in the sample. Probability and
non probability are types of sampling(Wood, 2016). In probability sampling involve simple
random, cluster, systematic etc. In addition to that, researcher use simple random sampling for
collecting data in study. With the help of it, attain result in relation to achieve aims and
objectives of project in an effective manner. In this research, 20 employees are involved as
5
elements of study in a reasonably in an effective manner. It makes marginal partiality in
information and enhance reliance on the gathered and investigate data of project. There are five
types of research design that includes descriptive, correlation, semi-experimental, exploratory
etc. In this context, descriptive research design, investigator concerned in defining the research.
It is approach based research design that is made by collect, analysis and present gathers
information. Therefore, project manager utilize this design for analysis of impact of globalization
on business operation of Pizza hut.
Data Collection: It is procedure of gathering data from all the applicable sources to determine
response to research difficulty, test possibility and measure the conclusion. There are two
methods such as primary and secondary data collection. In primary method, researcher collect
information from interview, questionnaire, case study, focus group etc. While investigators
gather data form books, journals, online websites that involves in secondary methods
(Cunningham and Ferrell, 2015).Through it, to get result in terms of achieve aim and objectives
of research. In this context, researcher used collect data from primary methods that is
questionnaire for analysis impact of globalization on the operations of Pizza hut.
Data Analysis: It involves tow type of data analysis that is qualitative and quantitative data
analysis. In qualitative data analysis, collect data from questionnaire, interview, focus group etc.
In addition to that, researcher used the thematic analysis for analysis of collected data in their
research. With the help of it, investigator analysis data in form of themes that are connected with
question of research. Through it, project manager analysis impact of globalization on operations
of company. By this, analysis information, evaluate response in terms of attain result of research
in an effective manner.
Sampling: It means procedure of selecting portion of population. It is the choice of subset of
individual from population to figure features of entire group. It is the technique wherein each
unit of the population has equal and likely chance of being chosen in the sample. Probability and
non probability are types of sampling(Wood, 2016). In probability sampling involve simple
random, cluster, systematic etc. In addition to that, researcher use simple random sampling for
collecting data in study. With the help of it, attain result in relation to achieve aims and
objectives of project in an effective manner. In this research, 20 employees are involved as
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

sample. With the help of it, project manager determine impact of globalization on operation of
Pizza hut.
6
Pizza hut.
6

P 5 Data analysis and data interpretation
Theme 1- Globalisation has positively impacted Pizza Hut in achieving goals
Q1. Do you think that globalisation has
positively impacted Pizza Hut in accomplishing
goals? Respondents
Strongly Agree 8
Agree 7
Disagree 2
Strongly Disagree 3
Total 20
Strongly Agree Agree Disagree Strongly Disagree
0
1
2
3
4
5
6
7
8
9
8
7
2
3
Respondents
Interpretation-
7
Theme 1- Globalisation has positively impacted Pizza Hut in achieving goals
Q1. Do you think that globalisation has
positively impacted Pizza Hut in accomplishing
goals? Respondents
Strongly Agree 8
Agree 7
Disagree 2
Strongly Disagree 3
Total 20
Strongly Agree Agree Disagree Strongly Disagree
0
1
2
3
4
5
6
7
8
9
8
7
2
3
Respondents
Interpretation-
7
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

It can be interpreted from the graph that 8 respondents have strongly agree that
globalisation has positively impacted organisation in attaining goals in effective manner.
Moreover, 7 have also agreed with it. On the other hand, 2 disagree and 3 disagree with the
statement.
Theme 2- Different functions of organisations are positively affected
Q 2. Do you agree that economic, cultural and
ethical positively impacts different functions of
organisations? Respondents
Strongly Agree 9
Agree 5
Disagree 4
Strongly Disagree 2
Total 20
Strongly Agree Agree Disagree Strongly Disagree
0
1
2
3
4
5
6
7
8
9
10
9
5
4
2
Respondents
8
globalisation has positively impacted organisation in attaining goals in effective manner.
Moreover, 7 have also agreed with it. On the other hand, 2 disagree and 3 disagree with the
statement.
Theme 2- Different functions of organisations are positively affected
Q 2. Do you agree that economic, cultural and
ethical positively impacts different functions of
organisations? Respondents
Strongly Agree 9
Agree 5
Disagree 4
Strongly Disagree 2
Total 20
Strongly Agree Agree Disagree Strongly Disagree
0
1
2
3
4
5
6
7
8
9
10
9
5
4
2
Respondents
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Interpretation-
It can be interpreted from the chart that different functions of Pizza Hut are positively
impacted due to economic, cultural and ethical factors as 9 have responded in favour of it. 5 have
also agree, however, 4 participants did not agree with it. Moreover, 2 respondents also strongly
disagreed.
Theme 3- Globalisation has increased trade across borders
Q 3. Do you think that globalisation has
increased trade across borders of Pizza Hut? Respondents
Strongly Agree 8
Agree 5
Disagree 4
Strongly Disagree 3
Total 20
Strongly Agree Agree Disagree Strongly Disagree
0
1
2
3
4
5
6
7
8
9
8
5
4
3
Respondents
Interpretation-
9
It can be interpreted from the chart that different functions of Pizza Hut are positively
impacted due to economic, cultural and ethical factors as 9 have responded in favour of it. 5 have
also agree, however, 4 participants did not agree with it. Moreover, 2 respondents also strongly
disagreed.
Theme 3- Globalisation has increased trade across borders
Q 3. Do you think that globalisation has
increased trade across borders of Pizza Hut? Respondents
Strongly Agree 8
Agree 5
Disagree 4
Strongly Disagree 3
Total 20
Strongly Agree Agree Disagree Strongly Disagree
0
1
2
3
4
5
6
7
8
9
8
5
4
3
Respondents
Interpretation-
9

It can be analysed from the above chart that majority of respondents answered that trade
of Pizza Hut has effectively increased due to globalisation. 5 also answered the same. However,
4 said they did not agree and remaining 3 were strongly disagreed with it.
10
of Pizza Hut has effectively increased due to globalisation. 5 also answered the same. However,
4 said they did not agree and remaining 3 were strongly disagreed with it.
10
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 23
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.