This project plan details the development of an application for Globex, focusing on enhancing farmer productivity. The plan, developed by Virtucon, outlines the Measurable Organizational Value (MOV), project scope, Work Breakdown Structure (WBS), risk analysis, and quality management plan. The application aims to provide farmers with information on weather conditions, geographical specifics, and crop management to improve yields. The plan covers various aspects, including desired areas of impact (strategic, financial, operational, customer, and social), resource allocation, budget assumptions, risk identification, and quality assurance. The project's success is measured by its timely delivery and its impact on farmer efficiency and profitability. An annotated bibliography is also included, referencing relevant studies on statistical analysis and missing data. The project also provides a brief on the MBFSA project.

GLOBEX – APPLICATION DEVELOPMENT
PROJECT PLAN
1
PROJECT PLAN
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of contents
Introduction......................................................................................................................................4
Project descriptions..........................................................................................................................4
Task 1...............................................................................................................................................4
Developing the Measurable Organizational Value (MOV).........................................................4
4 Desired areas of impact.............................................................................................................4
The desired value of the project...................................................................................................5
Appropriate Metric.......................................................................................................................5
Timeframe for achieving the MOV.............................................................................................5
MOV statements..........................................................................................................................5
Task 2...............................................................................................................................................5
Project Scope................................................................................................................................5
Defining the project’s scope........................................................................................................5
Resource list.................................................................................................................................6
Task 3...............................................................................................................................................6
Work Breakdown Structure (WBS).............................................................................................6
Assumptions in making a budget.................................................................................................7
Task 4...............................................................................................................................................7
Project Risk Analysis and Plan....................................................................................................7
Assumptions.............................................................................................................................7
Risks Identification Framework...............................................................................................8
The Risk analysis.........................................................................................................................8
Part 5................................................................................................................................................9
Quality Management Plan............................................................................................................9
Quality Statement.....................................................................................................................9
Verification Activities..............................................................................................................9
Validation Activities.................................................................................................................9
Part 6................................................................................................................................................9
2
Introduction......................................................................................................................................4
Project descriptions..........................................................................................................................4
Task 1...............................................................................................................................................4
Developing the Measurable Organizational Value (MOV).........................................................4
4 Desired areas of impact.............................................................................................................4
The desired value of the project...................................................................................................5
Appropriate Metric.......................................................................................................................5
Timeframe for achieving the MOV.............................................................................................5
MOV statements..........................................................................................................................5
Task 2...............................................................................................................................................5
Project Scope................................................................................................................................5
Defining the project’s scope........................................................................................................5
Resource list.................................................................................................................................6
Task 3...............................................................................................................................................6
Work Breakdown Structure (WBS).............................................................................................6
Assumptions in making a budget.................................................................................................7
Task 4...............................................................................................................................................7
Project Risk Analysis and Plan....................................................................................................7
Assumptions.............................................................................................................................7
Risks Identification Framework...............................................................................................8
The Risk analysis.........................................................................................................................8
Part 5................................................................................................................................................9
Quality Management Plan............................................................................................................9
Quality Statement.....................................................................................................................9
Verification Activities..............................................................................................................9
Validation Activities.................................................................................................................9
Part 6................................................................................................................................................9
2

Annotated bibliography................................................................................................................9
Closure and Evaluation..............................................................................................................10
Closure checklist....................................................................................................................10
Project evaluation...................................................................................................................11
Closeout review......................................................................................................................11
References......................................................................................................................................12
3
Closure and Evaluation..............................................................................................................10
Closure checklist....................................................................................................................10
Project evaluation...................................................................................................................11
Closeout review......................................................................................................................11
References......................................................................................................................................12
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Introduction
The study will give a brief on developing an impactful application that will give out an idea on
the working of Globex. The report will give a brief on project scope as well as regarding the type
of crops that farmers can grow even in the hard conditions of their geographical area. The
application is going to be made by the Virtucon that can cater to the requirements of farmers in
high number.
Project descriptions
The organization Globex is a well-known and one of the most popular organizations that are
aiming to work towards helping out the farmers so that they can enhance their productivity by
reducing the overall cost. The two major products are going to be introduced by the company
that includes the precision equipment and the farm equipment. The project is also going to
revolve around the development and on the innovative of inclusive application to manage and
complete their program from Globex. The application will give proper detail regarding the
weather condition, geographical condition as well as on the specification to increase the growth
of crops as per the demands in the market. For the organization Virtucon, has been given the
responsibility to complete the application development within the time of 6months (Morgeson et
al. 2019).
Task 1
Developing the Measurable Organizational Value (MOV)
The measure organization value (MOV) is defined to be as a ‘measure of overall goal and
success'. The development of IT projects can be reduced by introducing an optimum MOV that
will help to implement better progress during the changes in requirements, scope, resources, and
schedules. The organization's strategies, missions, values can be dried with the MOV. However,
the main objective of the Globax that is approached with the Virtucon consultancy is to improve
and to dive out a batter manual system to farmers. Thus, MOV will help out to judge out whether
the project can be used or not (Melchers, 2018).
4 Desired areas of impact
The online program system will help out the frames to book out their services that will create and
influence their business to show the impact on the following things:
Strategic: The organization Globex saw that there is a need to approach and to give an
online system to the farmers, so they approach with the plan of Virtucon. The plan is also
to improve awareness and to attract customers from different areas.
Financial: The system will help the organization to improve their invoices by including
all the marinating and service fee payments while incurred during their farming
4
The study will give a brief on developing an impactful application that will give out an idea on
the working of Globex. The report will give a brief on project scope as well as regarding the type
of crops that farmers can grow even in the hard conditions of their geographical area. The
application is going to be made by the Virtucon that can cater to the requirements of farmers in
high number.
Project descriptions
The organization Globex is a well-known and one of the most popular organizations that are
aiming to work towards helping out the farmers so that they can enhance their productivity by
reducing the overall cost. The two major products are going to be introduced by the company
that includes the precision equipment and the farm equipment. The project is also going to
revolve around the development and on the innovative of inclusive application to manage and
complete their program from Globex. The application will give proper detail regarding the
weather condition, geographical condition as well as on the specification to increase the growth
of crops as per the demands in the market. For the organization Virtucon, has been given the
responsibility to complete the application development within the time of 6months (Morgeson et
al. 2019).
Task 1
Developing the Measurable Organizational Value (MOV)
The measure organization value (MOV) is defined to be as a ‘measure of overall goal and
success'. The development of IT projects can be reduced by introducing an optimum MOV that
will help to implement better progress during the changes in requirements, scope, resources, and
schedules. The organization's strategies, missions, values can be dried with the MOV. However,
the main objective of the Globax that is approached with the Virtucon consultancy is to improve
and to dive out a batter manual system to farmers. Thus, MOV will help out to judge out whether
the project can be used or not (Melchers, 2018).
4 Desired areas of impact
The online program system will help out the frames to book out their services that will create and
influence their business to show the impact on the following things:
Strategic: The organization Globex saw that there is a need to approach and to give an
online system to the farmers, so they approach with the plan of Virtucon. The plan is also
to improve awareness and to attract customers from different areas.
Financial: The system will help the organization to improve their invoices by including
all the marinating and service fee payments while incurred during their farming
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

operations. The expense and accuracy records will be maintained through the online
system and will also reduce the additional costs that are required to maintain.
Operational: The project is aiming to efficiently improve the size that is used by farmers
to maintain their records on activities that will further help to make their process more
convenient for farm managers as well as for the users (Krippendorff, 2018).
Customer: The program will also bring benefit to the customers as they will be able to
order their services online thus it will make it more convent form them and will also help
in increasing the level of satisfaction.
Social: The users can have security data and the information regarding their farming
activities that will help them to promote it in the economic features.
The desired value of the project
The project will help in identifying the organizational value in a faster way. The customers can
make use of their online system by accessing the delays of farmers services as well as the
farmers can make use of it by accessing their crop growths, weather conditions in their
geographical area. The online system will help to identify the management activities as well as
the breeding programs to give the frames a record of their history to take further actions in the
future.
Appropriate Metric
The organization Globex has found a possible impact on the system, which will help the farmers
in a great way to evaluate their crops as well as to increase their production. However, the
delivery of this project should be made on time and should be made as inexpensive as possible.
Timeframe for achieving the MOV
The time that could be taken to develop this project is estimated to be in duration about 60 days
to complete as well as to implement it.
MOV statements
The project can be successful fit is delivered in the time frame of 80days, and the farmers could
make the best use of the program every month.
Task 2
Project Scope
A successful project can be delivered with effective plan management if appropriately applied by
the organization. The scope can be defined on where the project is going and how the
information of the project could be delivered with the time duration of the project, total cost, and
according to the requirements involved until the finishing of the project (Fryer Jr, 2019).
Defining the project’s scope
5
system and will also reduce the additional costs that are required to maintain.
Operational: The project is aiming to efficiently improve the size that is used by farmers
to maintain their records on activities that will further help to make their process more
convenient for farm managers as well as for the users (Krippendorff, 2018).
Customer: The program will also bring benefit to the customers as they will be able to
order their services online thus it will make it more convent form them and will also help
in increasing the level of satisfaction.
Social: The users can have security data and the information regarding their farming
activities that will help them to promote it in the economic features.
The desired value of the project
The project will help in identifying the organizational value in a faster way. The customers can
make use of their online system by accessing the delays of farmers services as well as the
farmers can make use of it by accessing their crop growths, weather conditions in their
geographical area. The online system will help to identify the management activities as well as
the breeding programs to give the frames a record of their history to take further actions in the
future.
Appropriate Metric
The organization Globex has found a possible impact on the system, which will help the farmers
in a great way to evaluate their crops as well as to increase their production. However, the
delivery of this project should be made on time and should be made as inexpensive as possible.
Timeframe for achieving the MOV
The time that could be taken to develop this project is estimated to be in duration about 60 days
to complete as well as to implement it.
MOV statements
The project can be successful fit is delivered in the time frame of 80days, and the farmers could
make the best use of the program every month.
Task 2
Project Scope
A successful project can be delivered with effective plan management if appropriately applied by
the organization. The scope can be defined on where the project is going and how the
information of the project could be delivered with the time duration of the project, total cost, and
according to the requirements involved until the finishing of the project (Fryer Jr, 2019).
Defining the project’s scope
5

In the given assignment, Globex organization has approached the Virtucon so that they can
develop an online application for the farmers so that it can help them to improve their efficiency
as well as accuracy to identify the growth of their crops and thus to evaluate more production.
The project is expected to be completed in the time frame of 80 days in a specific budget. The
major requirement to develop the application is to have a skilled technical team, management
team, friendly workplace, and budget.
Scope statement: To develop an online app that can support the farmers to know the growth of
their crops, and how they can make plans to improve their products and how they can keep their
record through the application.
Resource list
People: Below is listed team that is required for the completion of the project.
• Manager: To plan out and to make sure the project gets to finish with the time. The
managers will also play the role to decide project plans, information sheet, tools and
budgets that are needed to apply.
• UI developer: The UI developers can play a major role in the preparation of the design
draft by keeping the requirements of farmers in mind.
• Tester: The project will meet the customer's requirements by testing the features of the
proposed application.
• Database Administrator: The person will be responsible for managing the database of the
application.
Technology: The team members in the project should be well skilled to use the
technological advancements to be introduced in the project (Cox, 2018).
Facilities: The workspace of the team can also be used to perform the project in a friendly
space that can facilitate with recreation rooms, working space and also with recreational
rooms (Ferenczi, 2019).
Other: Transport: The staff should be facilitated with the drops and pickups a team
member must be trained with methodologies and process that can help them to overcome
their miscommunication.
Task 3
Work Breakdown Structure (WBS)
The WBS can help the project to make it manageable under the sections of allocating budget and
time when the tasks are involved. The WBS structure will also help to determine the risks in the
phase of the project (Megson, 2019).
6
develop an online application for the farmers so that it can help them to improve their efficiency
as well as accuracy to identify the growth of their crops and thus to evaluate more production.
The project is expected to be completed in the time frame of 80 days in a specific budget. The
major requirement to develop the application is to have a skilled technical team, management
team, friendly workplace, and budget.
Scope statement: To develop an online app that can support the farmers to know the growth of
their crops, and how they can make plans to improve their products and how they can keep their
record through the application.
Resource list
People: Below is listed team that is required for the completion of the project.
• Manager: To plan out and to make sure the project gets to finish with the time. The
managers will also play the role to decide project plans, information sheet, tools and
budgets that are needed to apply.
• UI developer: The UI developers can play a major role in the preparation of the design
draft by keeping the requirements of farmers in mind.
• Tester: The project will meet the customer's requirements by testing the features of the
proposed application.
• Database Administrator: The person will be responsible for managing the database of the
application.
Technology: The team members in the project should be well skilled to use the
technological advancements to be introduced in the project (Cox, 2018).
Facilities: The workspace of the team can also be used to perform the project in a friendly
space that can facilitate with recreation rooms, working space and also with recreational
rooms (Ferenczi, 2019).
Other: Transport: The staff should be facilitated with the drops and pickups a team
member must be trained with methodologies and process that can help them to overcome
their miscommunication.
Task 3
Work Breakdown Structure (WBS)
The WBS can help the project to make it manageable under the sections of allocating budget and
time when the tasks are involved. The WBS structure will also help to determine the risks in the
phase of the project (Megson, 2019).
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Assumptions in making a budget
Assumptions:
• To identify the budget requirement.
• The cost per hour will also be mentioned.
• The resources will be leveled.
Task 4
Project Risk Analysis and Plan
Assumptions
The assumption is a part of relationships that could be known in to be as a part of the project.
The assumption is a document that can help the project to maintain its record as well as to
process the project in different assumptions to secure the risk too (Friese, 2019).
7
Assumptions:
• To identify the budget requirement.
• The cost per hour will also be mentioned.
• The resources will be leveled.
Task 4
Project Risk Analysis and Plan
Assumptions
The assumption is a part of relationships that could be known in to be as a part of the project.
The assumption is a document that can help the project to maintain its record as well as to
process the project in different assumptions to secure the risk too (Friese, 2019).
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

• Resources: The available technology, skilled team, and workplace should be there to get
the project done on time.
• Scheduling the budget: The Finances could be evolved so to fix up the budget to
complete it in the time frame of 80 days.
It the assumptions could not always be accurate. However, the assumptions could turn out to be
false, and it can affect the project entirely.
Risks Identification Framework
• Inherent risks: The internal risks are accountable to the managers. The project, the risk
could be addressed due to schedules, scope, budget, and deliverables to get unsuccessful.
• External risks: The external risks are known to be risks which are not controlled by the
team members. In the project Globex, in case it turns out to be bankrupt them the project
failure is definite.
• Known risks: The known risks are risks that are definite to have occurred. The risks could
be identified and planned. The technical issues in developing system can be one of the
risks.
• Unknown risks: The uncertainties are known as the unknown risks that can be occurred in
the project due to the influence of team members and due to the utilization of the
resources.
• The Unknown & unknown risks- These are the risk that is not identified by any
organization. Political imbalance, a natural disaster can be one of the unknown-unknown
risks that the project can face.
The Risk analysis
Type of risk Member of risk Strategy for risk
1. In the Initiating phase:
The risk is attached to
requirements where the
planning of
documentation is gone
wrong.
Project manager The managers are responsible
for gathering up the
requirements so that to
develop a project scope.
2. Planning phase: This is
a phase where the
threats are seen with a
sudden change of plan
Project manager The project manager must
communicate with the team to
reduce the risks and effects.
3. Execution phase: This
is the most prolonged
phase where the risks
are involved in
delivering the project.
Data base administrator The contingency plans must
be established to check the
management phase and to
bring out alternative plans.
4. Controlling and
monitoring phase: The
Project manager The acceptance of risks from
the insurance company could
8
the project done on time.
• Scheduling the budget: The Finances could be evolved so to fix up the budget to
complete it in the time frame of 80 days.
It the assumptions could not always be accurate. However, the assumptions could turn out to be
false, and it can affect the project entirely.
Risks Identification Framework
• Inherent risks: The internal risks are accountable to the managers. The project, the risk
could be addressed due to schedules, scope, budget, and deliverables to get unsuccessful.
• External risks: The external risks are known to be risks which are not controlled by the
team members. In the project Globex, in case it turns out to be bankrupt them the project
failure is definite.
• Known risks: The known risks are risks that are definite to have occurred. The risks could
be identified and planned. The technical issues in developing system can be one of the
risks.
• Unknown risks: The uncertainties are known as the unknown risks that can be occurred in
the project due to the influence of team members and due to the utilization of the
resources.
• The Unknown & unknown risks- These are the risk that is not identified by any
organization. Political imbalance, a natural disaster can be one of the unknown-unknown
risks that the project can face.
The Risk analysis
Type of risk Member of risk Strategy for risk
1. In the Initiating phase:
The risk is attached to
requirements where the
planning of
documentation is gone
wrong.
Project manager The managers are responsible
for gathering up the
requirements so that to
develop a project scope.
2. Planning phase: This is
a phase where the
threats are seen with a
sudden change of plan
Project manager The project manager must
communicate with the team to
reduce the risks and effects.
3. Execution phase: This
is the most prolonged
phase where the risks
are involved in
delivering the project.
Data base administrator The contingency plans must
be established to check the
management phase and to
bring out alternative plans.
4. Controlling and
monitoring phase: The
Project manager The acceptance of risks from
the insurance company could
8

risks are attached to
missing technical
approaches, and
known and unknown
risks could happen.
be taken to minimize the
natural disaster.
Part 5
Quality Management Plan
This phase is a process where the project plan can be delivered in the project process in good
quality. The project deliverable and methods could be designed in a way that can bring out a
better outcome for the farmers (Braun et al. 2019).
Quality Statement
The project will provide a way to farmers through which they can efficiently see the breeding of
their crop and ways in an increase in production. Globex will ensure that they can provide a
highly superior and trustworthy system to farmers.
Verification Activities
The verification activities are done to evaluate the deliverables of the business plan.
• Technical review: The technical review can be done to see whether all the information’s
are on the online sources or not.
Validation Activities
The validation activities make sure to ensure that the project could meet the requirements and
could satisfy the users. It will ensure to provide a suitable value to the farmers and also to the end
users. The testing activity can be conducted to ensure the functionality as well as to perform the
features (Merriam, 2019).
Part 6
Annotated bibliography
Little, R. J., & Rubin, D. B. (2019). Statistical analysis with missing data (Vol. 793). Wiley.
The concept of the statically analyses with the missing data is essential to understand in order to
manage the data successfully. The missing values can be handled with the researches so that they
can draw out an accurate inference on the data. However, due to the improper handling of the
obtained result, the researcher's result may differ out from the missing values. The non-
responses can be occurred out with a specific question in the project due to the lack of fatigue
and knowledge. The responses can convey out questions that are sensitive to answer and may
lack out the missing values.
9
missing technical
approaches, and
known and unknown
risks could happen.
be taken to minimize the
natural disaster.
Part 5
Quality Management Plan
This phase is a process where the project plan can be delivered in the project process in good
quality. The project deliverable and methods could be designed in a way that can bring out a
better outcome for the farmers (Braun et al. 2019).
Quality Statement
The project will provide a way to farmers through which they can efficiently see the breeding of
their crop and ways in an increase in production. Globex will ensure that they can provide a
highly superior and trustworthy system to farmers.
Verification Activities
The verification activities are done to evaluate the deliverables of the business plan.
• Technical review: The technical review can be done to see whether all the information’s
are on the online sources or not.
Validation Activities
The validation activities make sure to ensure that the project could meet the requirements and
could satisfy the users. It will ensure to provide a suitable value to the farmers and also to the end
users. The testing activity can be conducted to ensure the functionality as well as to perform the
features (Merriam, 2019).
Part 6
Annotated bibliography
Little, R. J., & Rubin, D. B. (2019). Statistical analysis with missing data (Vol. 793). Wiley.
The concept of the statically analyses with the missing data is essential to understand in order to
manage the data successfully. The missing values can be handled with the researches so that they
can draw out an accurate inference on the data. However, due to the improper handling of the
obtained result, the researcher's result may differ out from the missing values. The non-
responses can be occurred out with a specific question in the project due to the lack of fatigue
and knowledge. The responses can convey out questions that are sensitive to answer and may
lack out the missing values.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

The researchers can handle the missing values by leaving out the data imputation by replacing
them. The number of missing values can be solved out with the expert researches by omitting the
value from analyses. In the statistical language, if the number of missing values is less than 5%,
then the researcher can drop it.
Merriam, S. B., & Grenier, R. S. (Eds.). (2019). Qualitative research in practice: Examples for
discussion and analysis. Jossey-Bass.
The qualitative research in practice can offer in the introduction of the qualitative methods,
analysis, and research design and with the data. The designs can be a companion of the texts that
could be involved in qualitative research. In this book, it explored any qualitative studies that
also show relevant answers and examples with it that can help out the researcher to find it. The
workbook format also makes it easy to be used to get out a piece of in-depth information as well
as to make out field research in order to get out the valuable resource in fields of any qualitative
research.
The quantitative research is one of the primary concerns that can help with the qualitative and
numerical research methods to give more responsive, flexible as well as a piece of extensive
contextual information. The qualitative researches can define it by making the primary method
understandable with the social phenomena as well as through the experience. The book
introduces with the significant essential of the qualitative research that needs a bolster by expert
analyses in proving up a more in-depth insight than the traditional format allows.
Friese, S., (2019). Qualitative data analysis with ATLAS. Ti. SAGE Publications Limited.
The qualitative data analyses with the atlas are the very first book that is specially designed to
guide the researches to go through the step to step research in their project with the use of
ATLAS. In the book, the researchers will find practical advice by preparing the data's and also
by setting up the new projects with developing the coding systems, answering and finding the
questions, preparing for the results and so on. The book also features into giving the
methodological advances as well as technical advice to resolve the queries of a project.
The numerous examples and practical exercises are also given in the book. The book also shows
the stages and screenshot of the analyses that have data sets and companion websites with it.
Closure and Evaluation
Closure checklist
• Ensuring project report for the organization.
• Maintaining reports
10
them. The number of missing values can be solved out with the expert researches by omitting the
value from analyses. In the statistical language, if the number of missing values is less than 5%,
then the researcher can drop it.
Merriam, S. B., & Grenier, R. S. (Eds.). (2019). Qualitative research in practice: Examples for
discussion and analysis. Jossey-Bass.
The qualitative research in practice can offer in the introduction of the qualitative methods,
analysis, and research design and with the data. The designs can be a companion of the texts that
could be involved in qualitative research. In this book, it explored any qualitative studies that
also show relevant answers and examples with it that can help out the researcher to find it. The
workbook format also makes it easy to be used to get out a piece of in-depth information as well
as to make out field research in order to get out the valuable resource in fields of any qualitative
research.
The quantitative research is one of the primary concerns that can help with the qualitative and
numerical research methods to give more responsive, flexible as well as a piece of extensive
contextual information. The qualitative researches can define it by making the primary method
understandable with the social phenomena as well as through the experience. The book
introduces with the significant essential of the qualitative research that needs a bolster by expert
analyses in proving up a more in-depth insight than the traditional format allows.
Friese, S., (2019). Qualitative data analysis with ATLAS. Ti. SAGE Publications Limited.
The qualitative data analyses with the atlas are the very first book that is specially designed to
guide the researches to go through the step to step research in their project with the use of
ATLAS. In the book, the researchers will find practical advice by preparing the data's and also
by setting up the new projects with developing the coding systems, answering and finding the
questions, preparing for the results and so on. The book also features into giving the
methodological advances as well as technical advice to resolve the queries of a project.
The numerous examples and practical exercises are also given in the book. The book also shows
the stages and screenshot of the analyses that have data sets and companion websites with it.
Closure and Evaluation
Closure checklist
• Ensuring project report for the organization.
• Maintaining reports
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

• Confirming the deliverables and process
• Terminating the project relies on which are involved
Project evaluation
The project evaluation can be competed with determining the achieved on project deliverables. It
can be seen as:
Individual performance review: It can help in evaluating the team members on the performance
of their tasks and project.
Closeout review
The closeout review is carried down by the team and with project managers to review their
performance. Audits are also conducted to have a closeout review section to involve the project
executes to complete the project (Little, 2019).
11
• Terminating the project relies on which are involved
Project evaluation
The project evaluation can be competed with determining the achieved on project deliverables. It
can be seen as:
Individual performance review: It can help in evaluating the team members on the performance
of their tasks and project.
Closeout review
The closeout review is carried down by the team and with project managers to review their
performance. Audits are also conducted to have a closeout review section to involve the project
executes to complete the project (Little, 2019).
11

References
Braun, V., Clarke, V., Hayfield, N., & Terry, G. (2019). Thematic analysis. Handbook of
Research Methods in Health Social Sciences, 843-860.
Chorley, R. J. (Ed.). (2019). Spatial analysis in geomorphology. Routledge.
Cox, D. R., (2018). Analysis of survival data. Routledge.
Ferenczi, S., (2019). Final contributions to the problems and methods of psycho-analysis.
Routledge.
Fryer Jr, R. G. (2019). An empirical analysis of racial differences in police use of force. Journal
of Political Economy, 127(3), 000-000.
Krippendorff, K., (2018). Content analysis: An introduction to its methodology. Sage
publications.
Megson, T. H. G. (2019). Structural and stress analysis. Butterworth-Heinemann.
Melchers, R. E., & Beck, A. T. (2018). Structural reliability analysis and prediction. John Wiley
& Sons.
Morgeson, F. P., Brannick, M. T., & Levine, E. L. (2019). Job and work analysis: Methods,
research, and applications for human resource management. Sage Publications.
12
Braun, V., Clarke, V., Hayfield, N., & Terry, G. (2019). Thematic analysis. Handbook of
Research Methods in Health Social Sciences, 843-860.
Chorley, R. J. (Ed.). (2019). Spatial analysis in geomorphology. Routledge.
Cox, D. R., (2018). Analysis of survival data. Routledge.
Ferenczi, S., (2019). Final contributions to the problems and methods of psycho-analysis.
Routledge.
Fryer Jr, R. G. (2019). An empirical analysis of racial differences in police use of force. Journal
of Political Economy, 127(3), 000-000.
Krippendorff, K., (2018). Content analysis: An introduction to its methodology. Sage
publications.
Megson, T. H. G. (2019). Structural and stress analysis. Butterworth-Heinemann.
Melchers, R. E., & Beck, A. T. (2018). Structural reliability analysis and prediction. John Wiley
& Sons.
Morgeson, F. P., Brannick, M. T., & Levine, E. L. (2019). Job and work analysis: Methods,
research, and applications for human resource management. Sage Publications.
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 12
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.