Comprehensive Health and Safety Training Program Project for Workplace
VerifiedAdded on  2023/04/21
|15
|2869
|454
Project
AI Summary
This project details the development and implementation of a health and safety training program designed to improve workplace compliance. The project encompasses several key stages, including project planning, defining objectives, scope, and resource allocation. It outlines the selection of training vendors, equipment setup, and the actual training conduction. The project also emphasizes the importance of a quality management system, risk mitigation strategies, and stakeholder communication. A Gantt chart is used for project scheduling, and a work breakdown structure (WBS) is utilized to organize tasks. The project addresses the need for employee protection and the management of potential workplace hazards, with a focus on delivering a comprehensive training program to enhance employee knowledge and ensure a safer work environment. The project also includes the assessment of project success and delivery of deliverables.

Running head: TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
Training Program to Improve Health and Safety Compliance
Name of the Student
Name of the University
Author’s note
Training Program to Improve Health and Safety Compliance
Name of the Student
Name of the University
Author’s note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
The requirements of the project is based on the improvement of health and safety
compliance. This would include a formal training for the employees within the workplace in
order to make them aware of such compliance.
The scope of the project is based on providing training to the present employees within
the workplace. The parameters for the training project are cost, time, quality and quantity.
Additional information that would be required form client prior to commencing project
are:
ï‚· Objective or business goal of the project.
ï‚· Deadlines, key milestones and time constraints for the project.
ï‚· Criteria for determining project success.
The problem is based on providing training to the entire team of employees within the
workplace. The project would be designed to meet the expectations of the customers by
providing training on the impacts of health and safety compliance.
With the completion of the project, the benefits for the employees would be that they
would be able to gain sufficient knowledge about the details of health and safety within the
workplace.
Based on the present scenario of work, it could be concluded that workers should be
provided with highest level of protection based on safety and health that would arise within the
work scenario. The issues that could arise within the workplace would include: physical work
environment, work tasks and their way of performing, management and design of work.
The requirements of the project is based on the improvement of health and safety
compliance. This would include a formal training for the employees within the workplace in
order to make them aware of such compliance.
The scope of the project is based on providing training to the present employees within
the workplace. The parameters for the training project are cost, time, quality and quantity.
Additional information that would be required form client prior to commencing project
are:
ï‚· Objective or business goal of the project.
ï‚· Deadlines, key milestones and time constraints for the project.
ï‚· Criteria for determining project success.
The problem is based on providing training to the entire team of employees within the
workplace. The project would be designed to meet the expectations of the customers by
providing training on the impacts of health and safety compliance.
With the completion of the project, the benefits for the employees would be that they
would be able to gain sufficient knowledge about the details of health and safety within the
workplace.
Based on the present scenario of work, it could be concluded that workers should be
provided with highest level of protection based on safety and health that would arise within the
work scenario. The issues that could arise within the workplace would include: physical work
environment, work tasks and their way of performing, management and design of work.

2TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
Based on implementing the plan for the project, it would be discussed that the managers
and supervisors should develop, implement and thus monitor a training plan based on their
current workers. These plans should be reviewed on a regular basis for ensuring that they are
constantly updated.
Vision – The vision based on ToR is to ensure security within the workplace with the
help of health and safety compliance for the workers.
Objectives - The objectives of ToR is to put forward a scoping exercise in order to assess
the feasibility of reporting to the steering committee.
Scope – Identification for a set of proposed terms within the workplace that would ensure
high level of safety for the employees within the workplace.
Amount of Payment
(USD)
Deliverables
25% Upon signing of the contract based on project consultant
25% Submission of draft report and granting approval from Project
Manager
50% Upon submitting the final project report and approval from
Project Manager
Executive Sponsor – Authority for responsibility of project or program. They also
approve changes to project scope.
Steering Committee – They would provide leadership support for the project
Project Manager – They would participate in approving deliverables and project plan.
They would also manage project resources.
Based on implementing the plan for the project, it would be discussed that the managers
and supervisors should develop, implement and thus monitor a training plan based on their
current workers. These plans should be reviewed on a regular basis for ensuring that they are
constantly updated.
Vision – The vision based on ToR is to ensure security within the workplace with the
help of health and safety compliance for the workers.
Objectives - The objectives of ToR is to put forward a scoping exercise in order to assess
the feasibility of reporting to the steering committee.
Scope – Identification for a set of proposed terms within the workplace that would ensure
high level of safety for the employees within the workplace.
Amount of Payment
(USD)
Deliverables
25% Upon signing of the contract based on project consultant
25% Submission of draft report and granting approval from Project
Manager
50% Upon submitting the final project report and approval from
Project Manager
Executive Sponsor – Authority for responsibility of project or program. They also
approve changes to project scope.
Steering Committee – They would provide leadership support for the project
Project Manager – They would participate in approving deliverables and project plan.
They would also manage project resources.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
The different activities performed within the project include: Project planning, approval
from project sponsor, defining the requirements of training, performing of training and closure of
project.
Based on the provided resources and funding, it could be discussed that there would be a
need for certain equipment within the project that would ensure completion of training. There
would also be a requirement of funding that would be executed by project sponsor. The use of
Gantt chart would be used for the design of the project.
A dedicated team would be appointed for the entire project team. This would include
project sponsor, project manager and team of workers who would arrange the training materials.
There should be a proper arrangement within the workplace that would ensure that each
of the concerned members within the project would be able to establish secure connection with
each other. This could be possible by establishing a social group in which each member would
be actively connected. These members would also be present in the actual office for ensuring that
the project would be progressing as per the business needs.
In order to ensure that the project is achieving its stated objectives, it could be discussed
that a Quality Manager would be hired. The person would be responsible for ensuring that the
project is meeting with the expected deliverables in each of stages. If the project would not meet
with the planned objectives, the Quality Manager would ensure that the deliverables would be
met under the next planned objective.
The Quality Analyst would undertake a proper documentation for ensuring that the
activities performed during the execution phase would be sequences, resourced, executed and
controlled as per the pre-planned objectives of the project.
The different activities performed within the project include: Project planning, approval
from project sponsor, defining the requirements of training, performing of training and closure of
project.
Based on the provided resources and funding, it could be discussed that there would be a
need for certain equipment within the project that would ensure completion of training. There
would also be a requirement of funding that would be executed by project sponsor. The use of
Gantt chart would be used for the design of the project.
A dedicated team would be appointed for the entire project team. This would include
project sponsor, project manager and team of workers who would arrange the training materials.
There should be a proper arrangement within the workplace that would ensure that each
of the concerned members within the project would be able to establish secure connection with
each other. This could be possible by establishing a social group in which each member would
be actively connected. These members would also be present in the actual office for ensuring that
the project would be progressing as per the business needs.
In order to ensure that the project is achieving its stated objectives, it could be discussed
that a Quality Manager would be hired. The person would be responsible for ensuring that the
project is meeting with the expected deliverables in each of stages. If the project would not meet
with the planned objectives, the Quality Manager would ensure that the deliverables would be
met under the next planned objective.
The Quality Analyst would undertake a proper documentation for ensuring that the
activities performed during the execution phase would be sequences, resourced, executed and
controlled as per the pre-planned objectives of the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE

5TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
The project manager would ensure that the tasks would be sequenced within the WBS.
Resource Used Role and Responsibilities
Labour They would be responsible for ensuring that the required equipment would
be put in proper place for the benefits of training.
Equipment The different equipment would be necessary for ensuring that the training
would be conducted as per the requirement provided by the training
provider.
Outline
Number
Task Name Cost
0 Training Implementation $1,080.00
1 Start of Project $0.00
2 Project Planning $55.00
2.1 Defining Project Objectives $5.00
2.2 Preparing Project Scope $5.00
2.3 Preparing Resource plan and communication plan $20.00
2.4 Defining Project Schedule and Budget $25.00
3 Approval from Project Sponsor $30.00
4 Defining Requirements of Training $240.00
4.1 Defining technical requirements and training materials requirements $35.00
The project manager would ensure that the tasks would be sequenced within the WBS.
Resource Used Role and Responsibilities
Labour They would be responsible for ensuring that the required equipment would
be put in proper place for the benefits of training.
Equipment The different equipment would be necessary for ensuring that the training
would be conducted as per the requirement provided by the training
provider.
Outline
Number
Task Name Cost
0 Training Implementation $1,080.00
1 Start of Project $0.00
2 Project Planning $55.00
2.1 Defining Project Objectives $5.00
2.2 Preparing Project Scope $5.00
2.3 Preparing Resource plan and communication plan $20.00
2.4 Defining Project Schedule and Budget $25.00
3 Approval from Project Sponsor $30.00
4 Defining Requirements of Training $240.00
4.1 Defining technical requirements and training materials requirements $35.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
4.2 Selection of Training Vendor $55.00
4.3 Setting of required training equipments $150.00
5 Conduction of Training $500.00
6 Project Closeout $255.00
6.1 Evaluation of feedback from trainees $105.00
6.2 Distribution of supplementary training materials $150.00
Outline
Number
Task Name Quality Expectations
0 Training Implementation
1 Start of Project Ensure the initiation of the project
2 Project Planning
2.1 Defining Project Objectives Ensure the expectations from the
project
2.2 Preparing Project Scope Would define the proper form of
requirements of the project
2.3 Preparing Resource plan and
communication plan
Would define the way in which the
entire plan of communication would be
proceeded
2.4 Defining Project Schedule and Budget Ensure the entire budget of project
3 Approval from Project Sponsor Ensure that the project would initiate
4.2 Selection of Training Vendor $55.00
4.3 Setting of required training equipments $150.00
5 Conduction of Training $500.00
6 Project Closeout $255.00
6.1 Evaluation of feedback from trainees $105.00
6.2 Distribution of supplementary training materials $150.00
Outline
Number
Task Name Quality Expectations
0 Training Implementation
1 Start of Project Ensure the initiation of the project
2 Project Planning
2.1 Defining Project Objectives Ensure the expectations from the
project
2.2 Preparing Project Scope Would define the proper form of
requirements of the project
2.3 Preparing Resource plan and
communication plan
Would define the way in which the
entire plan of communication would be
proceeded
2.4 Defining Project Schedule and Budget Ensure the entire budget of project
3 Approval from Project Sponsor Ensure that the project would initiate
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
4 Defining Requirements of Training
4.1 Defining technical requirements and training
materials requirements Define the requirements of training
4.2 Selection of Training Vendor Ensure that proper person would
provide training
4.3 Setting of required training equipment Ensure that the project would initiate
5 Conduction of Training Ensure that the project would start
after proper guidelines
6 Project Closeout
6.1 Evaluation of feedback from trainees Ensure that the trainees have been
properly trained
6.2 Distribution of supplementary training
materials
Ensure that the trainees would be
supported after training
Name of
Risks
Mitigation Plan
Costs This could be mitigated with the approval from project sponsor
Scheduling The task would be scheduled by the project manager
Performance Failure of project due to performance should be taken care of by
the project manager
The entire project would be communicated to the team members by the project manager.
They would be responsible for ensuring that the team would understand the project requirements
with the plan of communication.
4 Defining Requirements of Training
4.1 Defining technical requirements and training
materials requirements Define the requirements of training
4.2 Selection of Training Vendor Ensure that proper person would
provide training
4.3 Setting of required training equipment Ensure that the project would initiate
5 Conduction of Training Ensure that the project would start
after proper guidelines
6 Project Closeout
6.1 Evaluation of feedback from trainees Ensure that the trainees have been
properly trained
6.2 Distribution of supplementary training
materials
Ensure that the trainees would be
supported after training
Name of
Risks
Mitigation Plan
Costs This could be mitigated with the approval from project sponsor
Scheduling The task would be scheduled by the project manager
Performance Failure of project due to performance should be taken care of by
the project manager
The entire project would be communicated to the team members by the project manager.
They would be responsible for ensuring that the team would understand the project requirements
with the plan of communication.

8TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
The plans meant for the project should be executed in proper order for ensuring that the
project would meet the pre-set deliverables.
The management of team morale, stress and process would be managed by the project
manager. They would manage the entire team, the stress of workers and would ensure that the
coordinated process would be performed in a positive manner.
The project manager would be responsible for ensuring that the stakeholders and steering
committee would be kept updated with the progress of the training project.
The project manager and project sponsor would be responsible for ensuring that the
different proposals for changes in document would be properly verified.
The project manager and quality analyst would hold responsibility that the project would
be controlled in a professional manner. This would ensure successful achievement of project
deliverables.
Any kind of disagreements or disputes during the conduction of training would be
efficiently managed by the project manager. This would ensure that the project based on training
would not be affected.
The expected delivery time based on completion of project should be maintained such
that the undertaken project would be completed as per the expectation.
The predefined costs should be properly maintained by the project sponsor and project
manager. They would ensure that there is no extra incurred costs within the project.
The Quality Analyst would be entirely responsible that the project quality would be
satisfactory in order to meet with the client expectations.
The plans meant for the project should be executed in proper order for ensuring that the
project would meet the pre-set deliverables.
The management of team morale, stress and process would be managed by the project
manager. They would manage the entire team, the stress of workers and would ensure that the
coordinated process would be performed in a positive manner.
The project manager would be responsible for ensuring that the stakeholders and steering
committee would be kept updated with the progress of the training project.
The project manager and project sponsor would be responsible for ensuring that the
different proposals for changes in document would be properly verified.
The project manager and quality analyst would hold responsibility that the project would
be controlled in a professional manner. This would ensure successful achievement of project
deliverables.
Any kind of disagreements or disputes during the conduction of training would be
efficiently managed by the project manager. This would ensure that the project based on training
would not be affected.
The expected delivery time based on completion of project should be maintained such
that the undertaken project would be completed as per the expectation.
The predefined costs should be properly maintained by the project sponsor and project
manager. They would ensure that there is no extra incurred costs within the project.
The Quality Analyst would be entirely responsible that the project quality would be
satisfactory in order to meet with the client expectations.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
In case of certain issues, the quality analyst should ensure that the project deliverables
should be properly met in the next deliverable. These issues would be resolved in order to
prevent the affecting of project quality, deliverables, budget and successful delivery of project.
The incurred risks during the performing of training project should be properly manager
by the quality analyst and project manager. They should also ensure that there would be
sufficient mitigation strategies in order to deal with risks incurred within the project.
The management of issues that would arise should be resolved in a professional manner.
This would ensure that the conduction of training would be performed in a sequenced manner
and the workers would be benefitted.
The client should be properly communicated by the project lead or project sponsor or
steering committee in order to assure that the concerned project is under progress.
The entire set of criteria for completion of project should be assessed by the project
manager and quality analyst. They would ensure the project would be completed as per the
predefined criteria.
The different activities, risks or issues arising within the project should be properly
mitigated. Based on successful mitigation, the project would be closed.
A hand over plan should be communicated to the customers for their understanding of the
deliverables of the project. This would be helpful for the successful understanding of the project.
The list of the entire set of activities should be noted down in the documentation part.
This would be supplied to the client.
In case of certain issues, the quality analyst should ensure that the project deliverables
should be properly met in the next deliverable. These issues would be resolved in order to
prevent the affecting of project quality, deliverables, budget and successful delivery of project.
The incurred risks during the performing of training project should be properly manager
by the quality analyst and project manager. They should also ensure that there would be
sufficient mitigation strategies in order to deal with risks incurred within the project.
The management of issues that would arise should be resolved in a professional manner.
This would ensure that the conduction of training would be performed in a sequenced manner
and the workers would be benefitted.
The client should be properly communicated by the project lead or project sponsor or
steering committee in order to assure that the concerned project is under progress.
The entire set of criteria for completion of project should be assessed by the project
manager and quality analyst. They would ensure the project would be completed as per the
predefined criteria.
The different activities, risks or issues arising within the project should be properly
mitigated. Based on successful mitigation, the project would be closed.
A hand over plan should be communicated to the customers for their understanding of the
deliverables of the project. This would be helpful for the successful understanding of the project.
The list of the entire set of activities should be noted down in the documentation part.
This would be supplied to the client.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
The project resources should be updated with the business requirements. This would be
supplied by the steering committee.
The closure of the project would also be made by communication of the information with
the stakeholders involved within the project. They would be aware of the entire scenario of the
project.
The steering committee should be able to measure the success rate of the project by
ensuring the benefits that would be provided after the completion of the training project.
The project manager and steering committee should ensure that the pre-set objectives of
the project have been properly met.
The steering committee should ensure that the described scope within the ToR would
have met in association with the project.
The project should be reviewed by the steering committee within the project. They would
ensure that the deliverables of the project have properly met. They would also ensure that the
plan of the project and financial plan have been delivered as per the expectations.
The project resources should be updated with the business requirements. This would be
supplied by the steering committee.
The closure of the project would also be made by communication of the information with
the stakeholders involved within the project. They would be aware of the entire scenario of the
project.
The steering committee should be able to measure the success rate of the project by
ensuring the benefits that would be provided after the completion of the training project.
The project manager and steering committee should ensure that the pre-set objectives of
the project have been properly met.
The steering committee should ensure that the described scope within the ToR would
have met in association with the project.
The project should be reviewed by the steering committee within the project. They would
ensure that the deliverables of the project have properly met. They would also ensure that the
plan of the project and financial plan have been delivered as per the expectations.

11TRAINING PROGRAM TO IMPROVE HEALTH AND SAFETY COMPLIANCE
1. Work Breakdown Structure
1 - Start of Project
2 - Project Planning
2.1 - Defining Project Objectives
2.2 - Preparing Project Scope
2.3 - Preparing Resource plan and communication plan
2.4 - Defining Project Schedule and Budget
3 - Approval from Project Sponsor
4 - Defining Requirements of Training
4.1 - Defining technical requirements and training materials requirements
4.2 - Selection of Training Vendor
4.3 - Setting of required training equipments
5 - Conduction of Training
6 - Project Closeout
6.1 - Evaluation of feedback from trainees
6.2 - Distribution of supplementary training materials
(Fig 1: WBS of the Entire Project)
(Source: Created by author)
1. Work Breakdown Structure
1 - Start of Project
2 - Project Planning
2.1 - Defining Project Objectives
2.2 - Preparing Project Scope
2.3 - Preparing Resource plan and communication plan
2.4 - Defining Project Schedule and Budget
3 - Approval from Project Sponsor
4 - Defining Requirements of Training
4.1 - Defining technical requirements and training materials requirements
4.2 - Selection of Training Vendor
4.3 - Setting of required training equipments
5 - Conduction of Training
6 - Project Closeout
6.1 - Evaluation of feedback from trainees
6.2 - Distribution of supplementary training materials
(Fig 1: WBS of the Entire Project)
(Source: Created by author)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 15
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.