Project Management Plan for Employee Health and Wellness Webinars
VerifiedAdded on 2023/01/07
|16
|3226
|64
Project
AI Summary
This project management plan focuses on developing and implementing a series of webinars aimed at promoting healthy eating habits among employees. The project begins with a business case that highlights the problem of declining employee productivity due to health issues and proposes webinars as a solution. The plan includes a stakeholder analysis, communication plan, and SMART objectives to ensure the project's success. A detailed work breakdown structure (WBS) breaks down the project into manageable activities, and an activity list provides a timeline for each task. The plan also addresses risk management, including a risk register and mitigation strategies. Activity scheduling is presented using a Gantt chart and critical path analysis to optimize project timelines. A cost-benefit analysis is included to justify the project's financial viability, and potential project execution challenges are identified. The plan concludes with a summary of the project's key components and a reference list.

Project Management -1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................3
Business Case...................................................................................................................................3
Business Problem...................................................................................................................3
Benefits...................................................................................................................................3
Stakeholders Analysis............................................................................................................4
Communication Plan ............................................................................................................4
Smart Objectives....................................................................................................................5
Work Breakdown Structure.............................................................................................................5
WBS.......................................................................................................................................5
Activity List............................................................................................................................6
Risk Management...................................................................................................................7
Activity Scheduling.......................................................................................................................10
Gantt Chart...........................................................................................................................11
Critical Path..........................................................................................................................11
Cost benefit analysis.............................................................................................................11
Project Execution Challenges........................................................................................................13
CONCLUSION..............................................................................................................................13
REFERENCES..............................................................................................................................14
Appendices.....................................................................................................................................15
INTRODUCTION...........................................................................................................................3
Business Case...................................................................................................................................3
Business Problem...................................................................................................................3
Benefits...................................................................................................................................3
Stakeholders Analysis............................................................................................................4
Communication Plan ............................................................................................................4
Smart Objectives....................................................................................................................5
Work Breakdown Structure.............................................................................................................5
WBS.......................................................................................................................................5
Activity List............................................................................................................................6
Risk Management...................................................................................................................7
Activity Scheduling.......................................................................................................................10
Gantt Chart...........................................................................................................................11
Critical Path..........................................................................................................................11
Cost benefit analysis.............................................................................................................11
Project Execution Challenges........................................................................................................13
CONCLUSION..............................................................................................................................13
REFERENCES..............................................................................................................................14
Appendices.....................................................................................................................................15

INTRODUCTION
Project management is defined as an application of processes, knowledge, methods as
well as experience to attain particular project objectives as per the set criteria and parameters. It
is basically a discipline of initiating, effective planning, implementation & managing all the
resources in order to achieve project deliverables within the time and budget as well (Kerzner,
2017). This project is based on creating webinars that will enhance human resource
development. This is a video workshop that is basically based on healthy food includes how to
maintain balance diet, measures of taking proteins and vitamins on daily basis, recipes with low
cholesterol and so on. The report will address stakeholders concern. Cost & benefit realisation
and project execution challenges. In addition to this, it cover the risk and time associated with the
project plan by using tools such work breakdown structure.
Business Case
Business Problem
The business problem is that a company needs to conduct webinars in order to make sure that
they are focusing on healthy living and eating. This is necessary as health problems in
employees leads to decline in their productivity. In order to spread awareness and increase
employees knowledge about healthy living they need to carry out a business project in which
they will educate employees.
Benefits
Successful conduction of webinar will help in making employees aware about their
health. They can live a happy and healthy life. It will encourage and motivate employees to do
better. This will reduce absenteeism amongst employees as most of the times health is mentioned
as a factor for taking leave from work. Fit and healthy employees who have been eating healthy
will effectively work towards success (Fleming and Koppelman, 2016). This will reduce errors
and increase productivity of employees as well.
Project management is defined as an application of processes, knowledge, methods as
well as experience to attain particular project objectives as per the set criteria and parameters. It
is basically a discipline of initiating, effective planning, implementation & managing all the
resources in order to achieve project deliverables within the time and budget as well (Kerzner,
2017). This project is based on creating webinars that will enhance human resource
development. This is a video workshop that is basically based on healthy food includes how to
maintain balance diet, measures of taking proteins and vitamins on daily basis, recipes with low
cholesterol and so on. The report will address stakeholders concern. Cost & benefit realisation
and project execution challenges. In addition to this, it cover the risk and time associated with the
project plan by using tools such work breakdown structure.
Business Case
Business Problem
The business problem is that a company needs to conduct webinars in order to make sure that
they are focusing on healthy living and eating. This is necessary as health problems in
employees leads to decline in their productivity. In order to spread awareness and increase
employees knowledge about healthy living they need to carry out a business project in which
they will educate employees.
Benefits
Successful conduction of webinar will help in making employees aware about their
health. They can live a happy and healthy life. It will encourage and motivate employees to do
better. This will reduce absenteeism amongst employees as most of the times health is mentioned
as a factor for taking leave from work. Fit and healthy employees who have been eating healthy
will effectively work towards success (Fleming and Koppelman, 2016). This will reduce errors
and increase productivity of employees as well.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Stakeholders Analysis
Stakeholders analysis is a process in which various stakeholders present in a company are
identified. They are then grouped on the basis of their interest, participation, power as well as
expectations from the organisation. Stake holder analysis is further discussed:
High Power, High Interest: They are those stakeholder in an organisation who should
be treated as priority. When considering the following project they have high interest as well as
their authority over project is also high. They usually are owner of the project. In the following
case Director as well as General manager of company will fall in this category of stakeholders.
High Power, Low Interest: These are the stakeholders who have high power over
business or project and are to be kept informed as well as satisfied so that there powers are used
positively. It is necessary that limited communication is kept with these stakeholders to keep up
their interest. These stakeholders are investors of webinar as well as sponsors.
Low Power, High Interest: These are those shareholders on which company focuses and
tries to keep them satisfied. It is necessary that communication with these stakeholders is
maintained so that they do not loose interest. Various suppliers for the webinars (Heagney, 2016)
(Badewi, 2016). Speakers coming to seminars will be included in this category (Wang and et. al.,
2020).
Low Power, Low Interest: They are last to stand in category of stakeholders and they
just require periodical information about the project. They can be staff working for company
managing the event, guards, maintenance team etc.
Communication Plan
The interest and power of stakeholders help project manager in specifically circulating
data to them from time to time. It is necessary that stakeholders are effectively communicated
with the tasks and progress made in project from time to time. Below mentioned is a well
described communication plan for this project:
Stakeholder Name Engagement Channel Frequency
Owner of the project Manage Closely Regular Meetings, E-
mails, Personal
interactions
Very frequently
Stakeholders analysis is a process in which various stakeholders present in a company are
identified. They are then grouped on the basis of their interest, participation, power as well as
expectations from the organisation. Stake holder analysis is further discussed:
High Power, High Interest: They are those stakeholder in an organisation who should
be treated as priority. When considering the following project they have high interest as well as
their authority over project is also high. They usually are owner of the project. In the following
case Director as well as General manager of company will fall in this category of stakeholders.
High Power, Low Interest: These are the stakeholders who have high power over
business or project and are to be kept informed as well as satisfied so that there powers are used
positively. It is necessary that limited communication is kept with these stakeholders to keep up
their interest. These stakeholders are investors of webinar as well as sponsors.
Low Power, High Interest: These are those shareholders on which company focuses and
tries to keep them satisfied. It is necessary that communication with these stakeholders is
maintained so that they do not loose interest. Various suppliers for the webinars (Heagney, 2016)
(Badewi, 2016). Speakers coming to seminars will be included in this category (Wang and et. al.,
2020).
Low Power, Low Interest: They are last to stand in category of stakeholders and they
just require periodical information about the project. They can be staff working for company
managing the event, guards, maintenance team etc.
Communication Plan
The interest and power of stakeholders help project manager in specifically circulating
data to them from time to time. It is necessary that stakeholders are effectively communicated
with the tasks and progress made in project from time to time. Below mentioned is a well
described communication plan for this project:
Stakeholder Name Engagement Channel Frequency
Owner of the project Manage Closely Regular Meetings, E-
mails, Personal
interactions
Very frequently
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Investors, sponsors of project
employees enrolling in
project
Keep Satisfied Top of the line e-
mails
Monthly
Suppliers (software supplier
for online webinar)
Keep Informed Mails, Memos Once in a while
Event managing staff,
Cleaners, guards
Monitor Newsletters Weekly
Smart Objectives
Major objective to take this project is to conduct successful webinars for employees.
Reasons behind this step is to make sure that employees are aware about healthy eating and
living. This will help in generating more productivity from employees by keeping them healthy
mentally as well as physically:
It is required by the management and project manager to make sure that they are
completing this project within 6 months with an amount of £50,000 so that they can effectively
encourage their employees.
Once the project is successful organisation may effectively use their human resource up
to their maximum utilisation. It also effectively allows employees to create a healthy and
hygienic environment at workplace. Organisation may also experience reduction in employee
turnover rate which will in turn save its recruitment cost (Smirnova and et. al., 2019).
Work Breakdown Structure
WBS
Work breakdown structure is a process in which various tasks of a project are broken
down into various small activities. It helps the project manager to effectively divide the tasks in
between the team members effectively. Organisation of various factors in project is supported by
work breakdown structure (Rowe, 2020). A schedule can be effectively developed by project
manager and they can keep on checking regularly weather they are working as per pre decided
schedule or not.
It helps in predetermining any risk factor that can occur while completion of project.
When taking the following project of conducting webinars into consideration manager is
employees enrolling in
project
Keep Satisfied Top of the line e-
mails
Monthly
Suppliers (software supplier
for online webinar)
Keep Informed Mails, Memos Once in a while
Event managing staff,
Cleaners, guards
Monitor Newsletters Weekly
Smart Objectives
Major objective to take this project is to conduct successful webinars for employees.
Reasons behind this step is to make sure that employees are aware about healthy eating and
living. This will help in generating more productivity from employees by keeping them healthy
mentally as well as physically:
It is required by the management and project manager to make sure that they are
completing this project within 6 months with an amount of £50,000 so that they can effectively
encourage their employees.
Once the project is successful organisation may effectively use their human resource up
to their maximum utilisation. It also effectively allows employees to create a healthy and
hygienic environment at workplace. Organisation may also experience reduction in employee
turnover rate which will in turn save its recruitment cost (Smirnova and et. al., 2019).
Work Breakdown Structure
WBS
Work breakdown structure is a process in which various tasks of a project are broken
down into various small activities. It helps the project manager to effectively divide the tasks in
between the team members effectively. Organisation of various factors in project is supported by
work breakdown structure (Rowe, 2020). A schedule can be effectively developed by project
manager and they can keep on checking regularly weather they are working as per pre decided
schedule or not.
It helps in predetermining any risk factor that can occur while completion of project.
When taking the following project of conducting webinars into consideration manager is

dividing the heavy tasks into a number of options so that they can easily monitor weather the
project is moving as per the plan which was developed for it or not. At the end work breakdown
structure makes it possible to complete the whole project effectively. In the following project
tasks are divided by manager into four stages that include Initiation, Planning. Execution and
Control activities.
Activity List
Initiation stage:
Conducting Online Webinars
Initiation Hiring of dietician Control
Official
paperwork
Foundation
Assignment of task to
members in team
Recording and
editing of videos
Training of project
team
Promotion of Webinars
Scheduling Webinar
Miscellaneous work
project is moving as per the plan which was developed for it or not. At the end work breakdown
structure makes it possible to complete the whole project effectively. In the following project
tasks are divided by manager into four stages that include Initiation, Planning. Execution and
Control activities.
Activity List
Initiation stage:
Conducting Online Webinars
Initiation Hiring of dietician Control
Official
paperwork
Foundation
Assignment of task to
members in team
Recording and
editing of videos
Training of project
team
Promotion of Webinars
Scheduling Webinar
Miscellaneous work
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Official paperwork is the first step in which permissions from all authorities are required.
Foundation refers to setting up a bottom line to begin the project.
Planning stage:
At this stage various meeting of management will take place to discuss requirement and
execution plan for the project.
Execution stage:
Hiring of experience dietitian who will be guiding employees.
Assigning of task to project members in the team as per their skills and experiences.
Development and recording of videos which will be used to conduct webinars.
Training to project team members who will help in coordinating various tasks of the
event.
Video graphic analysis will be done to edit and make the videos more attractive for
employees.
Promotion of Webinars will be done in organisation.
Schedule for forecasting of webinars which will be distributed amongst employees who
will be participating.
Execution and Control
Miscellaneous work – After the task is completed, there are different other activities
required to be take place. This will involve installation of desktop, arrangement of all the
cables and equipments, speaker and many more.
Risk Management
It is defined as the process of analysing the level of risk, assessing them & control all the
threats associated with the project. While developing a new project, it is determine that there are
various types of risk related with it such as financial risk, time risk, marketing risk and so on. It
is important for an entity and individual to analyse the level of risk before implementing project
in market (Gegenfurtner, Zitt and Ebner, 2020). It will help in developing effective strategies and
reduce the level of risk in an effective manner. At the time of developing new project of
Webinars on healthy food, there are various issues and threats associated with it.
Risk Plan
It is consider as a technique which is used by companies to analyse the level risk and its
impact on the project performance in a proper manner. By the assistance of such approach, it is
Foundation refers to setting up a bottom line to begin the project.
Planning stage:
At this stage various meeting of management will take place to discuss requirement and
execution plan for the project.
Execution stage:
Hiring of experience dietitian who will be guiding employees.
Assigning of task to project members in the team as per their skills and experiences.
Development and recording of videos which will be used to conduct webinars.
Training to project team members who will help in coordinating various tasks of the
event.
Video graphic analysis will be done to edit and make the videos more attractive for
employees.
Promotion of Webinars will be done in organisation.
Schedule for forecasting of webinars which will be distributed amongst employees who
will be participating.
Execution and Control
Miscellaneous work – After the task is completed, there are different other activities
required to be take place. This will involve installation of desktop, arrangement of all the
cables and equipments, speaker and many more.
Risk Management
It is defined as the process of analysing the level of risk, assessing them & control all the
threats associated with the project. While developing a new project, it is determine that there are
various types of risk related with it such as financial risk, time risk, marketing risk and so on. It
is important for an entity and individual to analyse the level of risk before implementing project
in market (Gegenfurtner, Zitt and Ebner, 2020). It will help in developing effective strategies and
reduce the level of risk in an effective manner. At the time of developing new project of
Webinars on healthy food, there are various issues and threats associated with it.
Risk Plan
It is consider as a technique which is used by companies to analyse the level risk and its
impact on the project performance in a proper manner. By the assistance of such approach, it is
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

determine that the project manager can reduce risk which has positive influence on the
performance of project. It is analysed that if the risk is analysed before implementation then it
save the cost and time of project manager.
Identifying Risk – It is stated that risk management plan assist in analysing the risk in a
proper manner and also suggest different measures to decline and overcome with such risk.
Herein, the project manager who are developing and managing food webinar project will analyse
risk and also develop effective strategies accordingly.
High quality of work – It is analysed that managing risk effectively will not only assist in
identifying risk as it also assist in effective planning and development of strategies to decline
such risk. In addition to this, analysing risk in an appropriate manner assist in saving time and
cost of project manager effectively.
Risk Register
Serial
no.
Risk Likeliho
od
Impact Owner Mitigati
on
Conting
ency
Weighti
ng score
(pre
action)
Weighti
ng score
(post
action )
1 Lack of
funds an
time
High High Owner For
declining
such risk,
develop
ment of
appropria
te plan is
importan
t that
involves
the time
of 5
month
and
50,000
Scheduli
ng
project
task and
follow up
help in
managin
g all
activities
on time
period,
7 out of
10
8 out of
10
performance of project. It is analysed that if the risk is analysed before implementation then it
save the cost and time of project manager.
Identifying Risk – It is stated that risk management plan assist in analysing the risk in a
proper manner and also suggest different measures to decline and overcome with such risk.
Herein, the project manager who are developing and managing food webinar project will analyse
risk and also develop effective strategies accordingly.
High quality of work – It is analysed that managing risk effectively will not only assist in
identifying risk as it also assist in effective planning and development of strategies to decline
such risk. In addition to this, analysing risk in an appropriate manner assist in saving time and
cost of project manager effectively.
Risk Register
Serial
no.
Risk Likeliho
od
Impact Owner Mitigati
on
Conting
ency
Weighti
ng score
(pre
action)
Weighti
ng score
(post
action )
1 Lack of
funds an
time
High High Owner For
declining
such risk,
develop
ment of
appropria
te plan is
importan
t that
involves
the time
of 5
month
and
50,000
Scheduli
ng
project
task and
follow up
help in
managin
g all
activities
on time
period,
7 out of
10
8 out of
10

pounds is
effective.
2 Technica
l issues
Medium High Project
Manager
Focusing
on
activities
and
checking
of all the
equipme
nts
before
executio
n of
sessions
will help
in
declining
technical
risk.
Monitori
ng the
project
activities
effectivel
y.
8 out of
10
9 out of
10
3 Skilled
Staff
Low Medium Project
Manager
Skilled
and
trained
project
members
should be
recruited
in order
to ensure
all the
Experien
ced
project
members
will
assist in
ensuring
positive
and
better
7 out of
10
8 out of
10
effective.
2 Technica
l issues
Medium High Project
Manager
Focusing
on
activities
and
checking
of all the
equipme
nts
before
executio
n of
sessions
will help
in
declining
technical
risk.
Monitori
ng the
project
activities
effectivel
y.
8 out of
10
9 out of
10
3 Skilled
Staff
Low Medium Project
Manager
Skilled
and
trained
project
members
should be
recruited
in order
to ensure
all the
Experien
ced
project
members
will
assist in
ensuring
positive
and
better
7 out of
10
8 out of
10
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

activities
will be
executed
systemati
cally and
properly.
outcomes
and also
assist in
satisfacti
on of
customer
s.
Risk Priority Graph
Risk High Medium Low
Lack of Funds
Lack of Time
Skilled Staff
Activity Scheduling
Activities-
Official paperwork
Foundation
Hiring of experience dietitian
Assigning of task to project members
Development and recording of videos
Training to project team members
Video graphic analysis
Promotion of Webinars
Schedule for forecasting of webinars
Miscellaneous work
Gantt Chart
It is defined as an statistical tool that is used to showcase the schedule of a particular
project in a proper manner. In addition to this, such chart is mainly develop to draw the
will be
executed
systemati
cally and
properly.
outcomes
and also
assist in
satisfacti
on of
customer
s.
Risk Priority Graph
Risk High Medium Low
Lack of Funds
Lack of Time
Skilled Staff
Activity Scheduling
Activities-
Official paperwork
Foundation
Hiring of experience dietitian
Assigning of task to project members
Development and recording of videos
Training to project team members
Video graphic analysis
Promotion of Webinars
Schedule for forecasting of webinars
Miscellaneous work
Gantt Chart
It is defined as an statistical tool that is used to showcase the schedule of a particular
project in a proper manner. In addition to this, such chart is mainly develop to draw the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

relationship among various activities & project scheduled status. In this present project, the time
needed to complete all the activities and finish project properly is 6 months. Further, it is
analysed that Gantt chart show all the activities that is from project initiation to the project
completion in a proper manner. The activities mentioned in the project is getting start after the
approval and completion of documentation process,.
needed to complete all the activities and finish project properly is 6 months. Further, it is
analysed that Gantt chart show all the activities that is from project initiation to the project
completion in a proper manner. The activities mentioned in the project is getting start after the
approval and completion of documentation process,.

⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.