Evaluating Tenders: Construction of HMS Quantico by BOLTeK Engineering

Verified

Added on  2023/04/11

|8
|946
|240
Report
AI Summary
This report details the tender evaluation criteria used for the HMS Quantico construction project by BOLTeK Engineering. It outlines the key criteria, including understanding the design, time management, professionalism, experience, and communication skills, each with allocated mark percentages. The evaluation process emphasizes assessing bidders' comprehension of specifications, risk management, and ability to deliver quality services, including after-sales support. A detailed breakdown of each criterion is provided, including rubrics for assessing understanding of design, experience, time management, professionalism and communication. The report highlights the importance of a comprehensive Design Package Review, relevant experience, and effective communication among team members to ensure project success and minimize potential conflicts.
Document Page
Running head: INDUSTRIAL ENGINEERING
Industrial Engineering
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1INDUSTRIAL ENGINEERING
Table of Contents
3.1 INTRODUCTION................................................................................................................2
3.2 CRITERIA SUMMARY......................................................................................................3
3.3 CRITERIA IN DEPTH........................................................................................................4
3.3.1 UNDERSTANDING THE DESIGN............................................................................4
Bibliography:..............................................................................................................................7
Document Page
2INDUSTRIAL ENGINEERING
LIST OF TABLES
Table Number Description Page Number
3.2.1 Criteria Summary -
3.3.1.1 Understanding the Design
Rubric
-
3.3.2.1 Experience Rubric -
3.3.3.1 Time Management Rubric -
3.3.4.1 Communication Rubric -
3.3.5.1 Professionalism Rubric -
3.1 INTRODUCTION
In this case the following tender evaluation criteria will be used for the purpose of judging
and ranking the tender that will be submitted to BOLTeK engineering by possible contractors
who represents their own organization. Here the contractors will be submitting tenders for the
construction of HMS Quantico. Each of the separate criterion must have some allocated
marks percentage. The bids placed by the contracting organization only need to be assessed
against the criteria that are important for the invitations and no new type of assumption can
be made while performing the evaluation of tender. Also it is very much important to assess
the responses regarding the tender responses. The first step of the tender response assessing is
ensuring that the bidders are meeting all the basic requirements and the bidders for the project
are understanding the implications and the risks regarding delivering good and implementing
new kind of services. The bid document also need to carry non cost criteria. This criteria can
be also used in the process of tender evaluation but that will vary depending on the services
Document Page
3INDUSTRIAL ENGINEERING
or the goods that is being sourced. One of the main quality requirement must be provided by
the contractors is the after sales service and continued technical support.
3.2 CRITERIA SUMMARY
CRITERIA SUMMARY TABLE 3.2.1
Criteria Details Mark
Understanding the Design Comprehension ability of
the given specifications and
drawing, and must it must be
interpreted in such a way
that it looks like the given
specifications and drawing
is designed for
interpretation.
25
Time Management Capability of the contractor
of pre planning, flexibility
with time and punctuality
with time.
15
Professionalism Self-assessment done in a
professional way including
maturity display and the
ethics and respect display.
15
Experience Overall experience of the
contractor with the
construction and the
25
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4INDUSTRIAL ENGINEERING
involved tools in the project.
Communication Skill regarding
communicating the thoughts
and idea among other
individuals among teams
and between team members
existing in the organization.
20
Total 100
3.3 CRITERIA IN DEPTH
3.3.1 UNDERSTANDING THE DESIGN
For executing any type of project it is very much important to understand the design aspect of
the project. Understanding the design process is also very much important as it helps to
ensure the project completion with lowest errors and minimal conflict among the project
members during the project execution process. This step also provided ability of
comprehension analysis of given specification and drawings for interpreting it in a way that it
must be interpreted. By properly understanding the design the contractors can also provide
some suggestion on the possible improvements on the proposed design. The understanding of
the design can be assessed best through by a proper analysis of the Design Package Review
that has been submitted. This can be also assessed very well from the evidence of previous
experiences, but that must have a similar type of design process that has been used for
creation of drawings. These drawings can include CAD drawings or some equivalent
drawings, technical drawings and hand drawings. This type of drawings can be supported by
with building designs such as the engineering courses, metalwork and woodworks.
Document Page
5INDUSTRIAL ENGINEERING
UNDERSTANDING THE DESIGN RUBRIC 3.3.3.1
Mark 25-21 20-13 12-6 5-1
Criteria The contractor
is capable of
giving Design
Package
Review which
will provide a
detailed view of
the design that
has been
initiated. The
contracting
organization is
also able to
present
important
evidences from
the expectances
of past for the
design
programs or
building from
designs.
The contracting
organization is
not able to
provide a
detailed
understanding
of the Design
Package
Review but
somehow
provided a
satisfying
Design Package
Review which
has provided
small insight in
the design
process. The
contracting
organization is
also able to
provide a
The contracting
organization
provided the
Design Package
Review with
some vague
present within it
insight to the
design process.
Also, the
organization is
able to give a
very small
amount of
evidence over
the previous
experience with
building from
designs or with
the design
programs.
The contracting
organization
failed to present
a proper
understanding
of the Design
Package
Review or the
irrelevant type
of content has
been presented
which are
making no
sense with the
design process.
Also, the
organization
failed to provide
any previous
experience
aligned with the
design
Document Page
6INDUSTRIAL ENGINEERING
smaller amount
of evidence
from the past
experiences
with building
from designs
and design
programs.
programs or the
building from
designs.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7INDUSTRIAL ENGINEERING
Bibliography:
Ballesteros-Pérez, P., Skitmore, M., Pellicer, E. and González-Cruz, M.C., 2015. Scoring
rules and abnormally low bids criteria in construction tenders: a taxonomic
review. Construction management and economics, 33(4), pp.259-278.
Bergman, M.A. and Lundberg, S., 2013. Tender evaluation and supplier selection methods in
public procurement. Journal of Purchasing and Supply Management, 19(2), pp.73-83.
Diabagate, A., Azmani, A. and El Harzli, M., 2014. Tendering process: improvement of
analysis and evaluation of tenders based on the use of fuzzy logic and rule of
proportion. International Journal of Computer Applications, 101(14), pp.43-50.
Plattner, H., Meinel, C. and Leifer, L. eds., 2014. Design thinking research: Building
innovators. Springer.
Puri, D. and Tiwari, S., 2014. Evaluating the criteria for contractors’ selection and bid