Project Management Report: iCrop Development for Globex and Virtucon

Verified

Added on  2020/10/23

|18
|4544
|314
Project
AI Summary
This project management report details the development of iCrop, an online platform for Globex, an Australian farming company, by Virtucon, a consulting firm. The report covers the Measurable Organizational Value (MOV), emphasizing the project's benefits in improving financial transactions and customer service. It also presents a scope management plan, outlining requirements, in-scope/out-of-scope items, deliverables, and acceptance criteria, with a focus on creating a user-friendly application for remote areas with low connectivity. The project's resources, including personnel and their responsibilities, are also outlined. The report analyzes the project's scope, including scope management plan, and risk assessment, with the aim of digitalizing Globex's operations and improving buyer-seller interactions.
Document Page
Project Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
INTRODUCTION...........................................................................................................................1
Overview..........................................................................................................................................1
PART 1............................................................................................................................................1
PART 2............................................................................................................................................3
PART 3............................................................................................................................................6
PART 4............................................................................................................................................8
PART 5..........................................................................................................................................10
PART 6..........................................................................................................................................11
CONCLUSION..............................................................................................................................12
REFERENCES..............................................................................................................................13
APPENDIX....................................................................................................................................14
Document Page
Document Page
INTRODUCTION
Project Charter can be considered as a statement or short document which is related to
objectives of a particular task. It majorly contains number of elements like goals, responsibilities,
primal stakeholders along with duty or authority which the project manager is going to have till
the desired target gets achieved (Badewi,2016). Away with this, a charter of a project also
consists with risks, benefits and a summarised form of a detailed budget. In this project, an
Australian consulting firm has been taken i.e. Virtucon. On the other hand, Globex are farming
company have made contract with Virtucon so that to develop user friendly and effective in
improving interactions among buyers and seller. Assignment will keep its focus over measurable
organisational value (MOV), scope of project and it will also develop a scope management plan
that will help in controlling the whole project. Apart from this project risk analysis and quality
management plan with closure checklist is going to be prepared so that evaluation of project can
be done in much effective sense.
Overview
Virtucon Consultancy which is one of the famous Australian consulting business firm
contracted with Globex Corporation in order to develop an online website along with application
considering name as iCrop. Primal feature of iCrop is to make company much digitalised as
Globex so that selling and buying along with management of warehouse of grains can be done in
much effective way. Apart from this, they have also decided to provide services like online
payment, better customer service and many more other services to its clients through online.
Major aim of developing iCrop is that to improve money transacting process among clients and
Globex. They have asked Virtucon to develop website and application with many special
features so that it do not cost much Globex in interrupted network times as well. Another feature
which Globex wants is that and online website should be user friendly and can be used by any
person with keeping the process of transaction much simpler.
PART 1
Measurable Organisational Value (MOV)
Measurable Organisational Value can be considered as the first phase of project that
begins with abstracting goal and overall measure of success of a project (Bucero and Englund,
2015). It has been analysed that MOV is majorly prepared or develop in order to understand that
1
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
how much a project is going to value at the time of bringing it in front of consumers or clients.
On the other hand, it is being found that providing value to Globex of a project, it is required to
support set mission, goals or strategy and make it systematic. With the help of developing proper
MOV, project manager can easily deliver the information related to the project and its value to
his/her team. On the other hand, it has been found that major goal of project is that to develop a
user friendly online through which company can make financial transactions with its customers
in a quick and easy sense.
Apart from this, it has also been examined that with the help of measuring the overall
organisational value, Globex can be verifiable at the time of execution of project. While
executing this project, there are some major impacts that has been found like strategy can be
changed because of external or governmental forces, customer's view point got changed for the
company, project may cost high to company and lastly, operational and social factors can also
get affected while bringing in changes (Conforto and et. al., 2014). Here, topmost rank can be
given to finance section because major goal is to develop iCrop it will directly improve
transactional process of payments. On the other hand, financial section has been carried out on
the first because developing an attractive internet application requires high investment. Second
priority which is being given is to strategy because almost all the farms of Globex are at remote
areas.
Thus, it will be required for Virtucon Consultancy to create easy to use iCrop and for this
it is must for them to develop proper strategy as per the requirements because of remote area
which is having less connectivity. Third rank can be given to customer because the application
which is going to be made will help consumers to reach directly to Globex where they can get
information related to grains that they are selling. On the fourth number, operations is fitting as
per the scenario as it will developing a website and application will make company more
effective in nature where they can store information online related to customers. Lastly, social
factor will be considered as something which will affect less because developing a website
would not impact much over this section.
Major benefit which is being carried out in this context is that it will help both buyer and
seller in saving money along with time (Drury-Grogan, 2014). On the other hand, if it is
referenced to the whole project then there, two values which are carried out in the project:
2
Document Page
Better: iCrop application will be better for clients of Globex and it has been selected
because technology sector is changing on a regular basis, using same online application
over the years can lead to boredom among consumer. Thus, it is much required for
Virtucon to make appropriate alterations so that users can take service and regular
changes will automatically improve quality and through this many benefits can be gained
right on time by Globex like strong customer base, improvisation in productivity and
many more.
Faster: Money transactions will be considered as element which will become easy and
less time consuming g. This is reasoned as another approach because developing an
effective online website will automatically help Globex to give faster services to its
clients or provide information to them while they are sitting at home or anywhere else.
Virtucon needs to make quick response based application and website for those areas as
well where there is low network connectivity. Because, no customer likes to wait over
receiving information or making payment/receiving products. Therefore, this element is
being considered as another approach that may lead Globex to improve its image in front
of its clients and competitors.
Metric :
Lastly, it can be summarised that MOV will directly help project manager in delivering
important values of the whole task to team (Eskerod and Vaagaasar, 2014). With the help of this,
vision related to developing the application will come out in front of important people who are in
project team. Through this, Globex can easily make interactions with their customers. Along
with this, it will help company in making money transactions much faster.
PART 2
Scope
3
Document Page
In business world, scope can be considered as term of project management which refers
to combining of objectives along with requirements that are essential for rightful completion of a
project (Fleming and Koppelman, 2016). With the help of this, a project manager can easily
settle the cost which is required and time that will be taken by whole task. In present project, the
aim of Virtucon is to develop simple and light version of website and iCrop for Globex so that
they can connect with consumers of remote areas. Scope of this project is huge as this will assist
Globex in making money transitioning process much faster in comparison to those of traditional
approaches of making payments. On the other hand, project's scope is going to be easily
managed with the help of continuous monitoring ability of project manager.
Scope Management Plan
Scope management plan refers to the collection of processes that are used while including
all tasks which is needed to be completed so that project can get completed while excluding all
the work which is irrelevant in nature and is out of scope. Here, Virtucon has kept its focus over
developing an effective iCrop along with website for Globex so that easy money transactions can
be made. This type of plan includes number of steps and these are given beneath:
Requirements: This is being considered as the major section of scope management plan
as it will help in understanding all the requirements that are linked with the project in order to
complete it in short period of time. In this context, Virtucon that is going to develop an
application for Globex it should include number of features and functions and these are given
beneath:
List of functions and features of application:
Application should have push notifications.
Mobile Payment
Geo - Location
One click contacting Fully secured from hackers
In scope - out scope items: This is another essential section of scope management plan as
it aid in looking at the overall scope items which is needed to be included in management plan
and what it is not (Guo and et. al., 2014). In this context, as Globex's farms are located in remote
areas, thus, it is required for the Virtucon to keep its focus over using high end technology so that
application can work in low connectivity regions. Here, company will use technology which may
4
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
help mobile app of Globex to work where there is minimal network available. Apart from this,
features like continuous upgrading system can be removed from application because it is
required for Globex to make application that can be used by its clients in low network areas as
well.
Deliverables: There are number of outputs related to both project and which has been
carried out are given below :
Project based deliverables: Completion of this project will help in delivering information to the learner related to
which needs to be made effective in devastating conditions like low connectivity
areas and so on.
Product based deliverables:
Application which is going to be made by Virtucon for Globex, that will help client in
reaching to them directly and will remove all the mediators. Through this, buying and
selling process will become easily and payment process will also get fast and quicker
from traditional approaches of payment.
Acceptance Criteria: With the help of scope management plan, there are number of
outcomes which has been carried out for consumers of Globex and these are given beneath :
Creating a light version of will help users that are living in remote areas that consist with
low connectivity network.
It will reduce all the time taking processes like for payment, users had to send check or
they have to visit office of Globex and many more. With the help of , cost of company
(expenses) are also going to be reduced.
Lastly, when the whole project is going to get completed, learner will get the knowledge
related to importance of scope management plan and how important it is for firms to become
digitalised where they can get way higher benefits through using technology from traditional
business approaches (Joslin and Müller, 2015).
Resources of Project:
5
Document Page
People: In order to complete the whole project, it is required to have many individuals
like Project managers, software developers, R & D executives and many more that may lead task
to get accomplished in given time frame. In this context, it is important for Virtucon to have
these key individuals so that they may develop iCrop.
Human resource Roles Responsibilities
Sahithi Project manager Responsibility to develop the
overall understanding of
project and associated tasks.
Assisting team members and
allocating resources required
during the project.
Anil Full stack programmer It is the key responsibility to
manage the code or programs
in a software and efficient line
of code. Tracking the build up
time of making application and
mange the user friendly
interfacce.
Technology : In present context, digital network, WAN and LAN connection are some of
technology that can be used by Virtucon to develop iCrop. On the other hand, they can also use
many other software that can make iCrop.
PART 3
Work Break Down structure
Activit
y
Name Preceding
activity
Time duration
(In weeks)
Resources
6
Document Page
A Identification of
need for I-Crop
application
- 1 Idea identification, needs and
perspectives of customers
B Planning A 2 Consideration of key elements,
strategy formulation, risk
measurement
C Design A,B 5 3D effects, pictures, blogs,
prototypes
D Development C 8 Processes, software engineers
E Testing C,D 6 Test drivers, operations team
F Delivery E 4 Application users, owners
G Maintenance F 3 IT resolution team and support
system
H Computer aided
software engineering
F,G 5 Configuration management,
refactoring and source of code
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
8
Document Page
PART 4
Project Risk Analysis and Plan:
Risk analysis is being considered as an approach which helps in reviewing all the risks
that are involved while conducting the project. On the other hand, assumption which was made is
that Globex will directly start making interactions with its customers where previously they used
to use mediators. With the help of, risk identification framework a number of risks that the
project is containing are given below:
Identification of investors who will invest in the plan: Finance plays a crucial role in
every single project or plan. It has been found that, developing an online website or iCrop may
require huge investment. Taking a financial risk may lead firm to create high Here, Globex may
require investors so that they can pay to Virtucon for developing finest mode of iCrop.
9
chevron_up_icon
1 out of 18
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]