Project: Implementing and Monitoring Work Health and Safety Practices
VerifiedAdded on 2020/02/19
|8
|1228
|184
Project
AI Summary
This project addresses various workplace health and safety (WHS) concerns within a cafe setting. It begins with a hazard identification table, detailing potential risks like faulty fire exit signs, cramped table layouts, untrained staff using equipment, and spills. For each hazard, the project identifies those at risk, existing control measures, and proposed preventative actions. Responsibilities for each action are assigned. The project then outlines a new WHS procedure plan, specifying who is responsible for implementation, the areas and team members involved, and a timeframe for roll-out. Training descriptions and timelines are provided for each new procedure, covering topics such as emergency exit procedures, table arrangement improvements, cappuccino machine operation, spill prevention, chemical handling, and emergency response. A risk assessment matrix is included, categorizing the likelihood and severity of each hazard. The project emphasizes proactive measures, including training, to mitigate potential risks and improve overall workplace safety. The plan also includes a review schedule to evaluate the effectiveness of the new procedures.
1 out of 8