This report provides a detailed analysis of an information system for Repair-Made-Easy (RME). It begins with an introduction to information system analysis and design, highlighting the need for a new system to improve business operations. Task 1 discusses the development of RME's information system, justifying the choice of a new system over the existing Excel spreadsheets. Task 2 identifies the functional and non-functional requirements for the new system, crucial for its design and functionality. Task 3 performs a project cost analysis using Excel, including NPV and payback period calculations to assess the financial viability of the project. Task 4 presents a work breakdown structure and a Gantt chart, outlining the project schedule and key activities. The report concludes with a reflection and conclusion, summarizing the findings and recommendations for the new system's implementation.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Information system and analysis
1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Contents
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
TASK 2............................................................................................................................................4
TASK 3............................................................................................................................................5
TASK 4............................................................................................................................................8
TASK 5..........................................................................................................................................11
REFLECTION AND CONCLUSION..........................................................................................13
REFERENCES..............................................................................................................................14
2
Document Page
INTRODUCTION
Information system analysis and design is a process that can used by organization to perform
task in the business effectively and efficiently. It will maintain and create the information system
that perform functions such as track the details of consumers, suppliers, payments and orders.
Repair-Made-easy firm is mainly focused on improve the quality of services so that they can try
to implement new system which help for maintaining the overall activities of business in proper
manner.
RME wants to replace the current system with new one that should help for increasing the
visibility in marketplace. The company is decided to design and develop new system or available
for made in multiple stores via internet, centralised database. This report will use the centralise
database system to implement functions in different part of system design process. It will
identify the overall cost/benefits analysis of new system development.
Aim: To analyse the impact of existing system in the business operations and also understand the
requirement of new system development.
Objectives:
ï‚· To identifying multiple resources that implement concept in the new system design and
development.
ï‚· To evaluate that how to overcome challenges and weakness in existing system.
ï‚· To recommendation of improving the existing system features and functionality.
TASK 1
Discuss that how would repair made easy for developing its own information system.
Repair-Made-Easy (RME) is based on the spare parts and service provider organization that
provide wide range of computers such as desktops, notebooks etc. Many consumers are
purchased the part to take home and repairs. Currently, organization has used the excel
spreadsheet that store information about customers (Aydiner and et.al., 2019).
In this way, RME has been decided to develop new information that can operate by
internet and centralised database. It helps for collecting and gathering large number of data set in
proper manner. It replaces the current system to implement new one which are available for
different stores through internet. RME will design the new processing system that can store
details about purchase, sold in proper manner.
3
Document Page
They are used following steps to develop new system which suitable for RME enterprises
in proper ways:
ï‚· Planning
ï‚· Design
ï‚· Coding
ï‚· Testing
ï‚· Debugging
ï‚· Maintenance
Justify the choice for selecting approach to system development.
It justifies for choosing the new system development for managing and controlling the
entire processing of transaction, store details about spare parts and many more. There are various
types of problem generated during executions where spreadsheet cannot link together in properly
so that it possible to fails salesperson (Goldstein, Johanndeiter and Frank, 2019). It also
generated limited capacity of PC platform which shows difficulties in the growth scale. The
choice of new system development is right because it easily manages and control processing of
RME business. It is to be considered as a web-based system that provide the information of
product, purchase, delivery in rapidly.
TASK 2
Identify the primary functional requirement for new system.
Functional requirements are including the system function and features that development
can implement and enables user to accomplish task. In RME, software consultant must clear their
doubt and coordinate with development team for identifying the nature of system under different
conditions.
Functional requirements of new system
ï‚· Use cases
ï‚· Prototypes
ï‚· Models
ï‚· Relationship Diagram
ï‚· Work break down structure
4
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Determine the non-functional requirements for the new system.
The Non-functional requirements always describe the behaviour of system and how it can
establish the constraints of functionality. The requirements are considered the new system
quality and its attributes.
Non-Functional requirements of new system
ï‚· Usability
ï‚· Security
ï‚· Scalability
ï‚· Reliability
ï‚· Availability
ï‚· Performance
TASK 3
Discuss about the overall project cost and Perform the analysing with the help for Excel.
In order to assess the viability of concerned project investment appraisal tool has been applied.
This in turn helps in evaluating the attractiveness of project using techniques namely payback,
net present value method etc. Moreover, payback clearly presents time within business entity
will recover initial investment (Michalitsi, Psarrou and et.al., 2019). Further, NPV presents the
benefits which company will get after specific time period by taking into account time value of
money concept.
Given that:
Sales
2.0
0
Operating cost
0.5
0
Increase in sales
180,000.0
0
Reduction in cost
55,000.0
0
Other tangible benefits -
Total benefit
235,000.0
0
5
Document Page
Annual discounted rate: 6%
Computation of NPV
Year 0 1.00 2 3 4 5
Benefit
235,000.0
0
235,000.0
0
235,000.0
0
235,000.0
0
235,000.0
0
Develop
ment cost
(one-time
cost)
= Staff
cost
200,000.0
0
= New
hardware
350,000.0
0
= User
training
100,000.0
0
= Total
developm
ent 650000
Maintena
nce cost
(recurring
cost) - 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00
Other
recurring
cost - - - - - -
Net
Benefit -
223,000.0
0
223,000.0
0
223,000.0
0
223,000.0
0
223,000.0
0
Present
Value
(Discount
ed) - 0.943 0.890 0.840 0.792 0.747
210,377.3
6
198,469.2
1
187,235.1
0
176,636.8
9
166,638.5
7
6
Document Page
Sum of
discounted
cash flows
939,357.
12
Less:
initial
investmen
t 650000
NPV
289,357.
12
Calculation of payback period
Year Cash inflows
Cumulative Cash
inflows
1
235,000.0
0
235,000.0
0
2
235,000.0
0
470,000.0
0
3
235,000.0
0
705,000.0
0
4
235,000.0
0
940,000.0
0
5
235,000.0
0
1,175,000.0
0
Payback period: 2 + (650000 - 470,000) / 235000
= 2 + .8
= 2.8 years or 2 years and 8 months
Interpretation
In the above scenario it is identified that company is planning to introduce new project
for enhancing the processes of company. Company has laid down the criteria for the viability of
project. It requires the development cost of budget to be within 0.8 million excluding the yearly
maintenance cost. The breakeven point of company should not go above 3 years after the
introduction of new project. Company also states that the NPV of project should not go below
0.25 million.
The benefit will be raised by acceptance of new project is $235000 as the RME will increase
in sales of 9% and there is also reduction in cost of 11%. It also continues over for years. The
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
project will require cost of $200000 for staffing, $350000 for hardware and the $100000 for user
training. The total costing of project is $650000. NPV of project is coming to $289,357.12 using
the discounting rate of 6% which is above $0.25miilliion. The break even or payback period of
project is also coming to 2.8 years which is not longer than 3 years after the introduction of
project.
TASK 4
Represent work break down structure and project schedule in the form of Gantt chart with brief
explanation.
A work breakdown structure is based on the project development process that organize the team
work into manageable ways (Turetken, Grefen and Adali, 2019). It defines the overall flow of
activities performed for system development. it is considered the step by step process where
project team understand the requirement of development phases.
Figure 1 Work breakdown Structure
The structure is a type of hierarchical decomposition of new system development. This
structure is look like tree which represents the subdivision requires for achieving goals and
8
Document Page
objectives. Work breakdown structure is developed by starting with the end objective and
successively managing all responsibility, time duration.
Project Schedule
A project schedule and framework is a process that consists of different task, tool which
encompasses of key component for planning and managing the development phases.
Activity Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7
Planning data
from existing
system
Identifying
hardware and
software
requirement
Design SRS,
BRS
Drafting
Methodologies
Identify
appropriate
modelling
technique
Implementation
of
methodology
Processing
Project
Completion
Table: 1
9
Document Page
Gantt Chart
Task
Mode Task Name Duration Start Finish Predecessors
Auto
Scheduled
Planning data from existing
system 3 days Thu 8/29/19 Mon 9/2/19
Auto
Scheduled
Identifying hardware and
software requirement 4 days Tue 9/3/19 Fri 9/6/19 1
Auto
Scheduled Design SRS, BRS 6 days Mon 9/9/19 Mon 9/16/19 2
Auto
Scheduled Drafting Methodologies 3 days Tue 9/17/19 Thu 9/19/19 2,3
Auto
Scheduled
Identify appropriate modelling
technique 3 days Fri 9/20/19 Tue 9/24/19 4
Auto
Scheduled
Implementation of
methodology 2 days Wed 9/25/19 Thu 9/26/19 4,5
Auto
Scheduled Processing 2 days Fri 9/27/19 Mon 9/30/19 6
Auto
Scheduled Successfully completion 1 day Tue 10/1/19 Tue 10/1/19 6,7
Table: 2
Figure 2 Gantt Chart
10
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Discuss the system goal, requirements and scope of new project and understand project schedule.
It is an essential for new project design and development to understand their specific task that
acquire data from existing system. It helps for identifying the tools/platforms and methodologies
that useful to achieve objectives (Turkman and Taweel, 2019).
Goal: A system is successful when it has met the requirement of stakeholders. It is an
essential for identifying the stakeholders. The primary goal is to improve the product and
services through new system which help for increasing performance of business operations.
Requirements: For developing new system, it should require resources such as hardware
or software system that useful for operating the new system. It applicable for generating an
accurate results or outcomes.
Scope: The scope of project development is that when it covers data related existing
system and how it will be preventing or dealing with change requests of their overall processing.
Project Schedule: It will create the task that need to be carried out deliverable determined
followings:
ï‚· An appropriate effort is required for completing the task.
ï‚· The resources will carry out according to the need of task completion.
At that point, it can choose the software package that create an appropriate schedule. On the
other hand, input all deliverable task and resources those who will complete in proper manner.
TASK 5
Discuss about the stakeholders that involved.
A new system development project is successfully completed, which requires specific objectives
and goals that help for identifying resources in decision making. There are multiple stakeholders
involved in the project development process such as Manager, staff members, customers etc.
They can perform various type of operations where manager deal with software developer to
identify the overall procedures and also fixed specific deadline for project completion (van
Engelenburg, Janssen and Klievink, 2019).
Team members involves for making strategy planning to apply methodology because it
helps for increasing the capabilities and performance. Consumers are those who will access the
details by using new system and check the details of products. The project useful for developing
the good relationship between them.
11
Document Page
Describe three useful Investigation techniques.
System information investigation technique is a method for collecting and gathering data
about new system because it useful for improving understanding towards new system. There are
three common investigation technique useful.
Observation of system in the operation- this type of technique is identified the overall
performance of system. It can be observed their process during task executions. It is the most
common technique that easily record the observation by manager or team leaders of
development.
Current system documentation- This type of investigation method will help for software
consultant to analyse the features and functionality of existing system. Furthermore, it can be
identified that how it will add more features. The technique useful for identifying essential
features for improving the overall processing (Weske, 2019).
Survey- It is the most common technique to conduct survey and interact with the client
where they can give their own opinion regarding existing system. If it is not good for
organization while it will change according to requirement of consumers.
Justification of three useful investigation techniques.
It justified that these three-investigation techniques suitable for new project development
because it helps for consultant to understand the current trends in global market. It can be
determined the different type of benefits to hold the entire details about consumers, supplier in
proper manner. These techniques will give brief idea about the opinion of consumers which is
the most important for organization. Developer team also investigates existing documentation to
study about their functionality because it helps for identifying the functionality and can develop
new system.
12
Document Page
REFLECTION AND CONCLUSION
This report is based on the understanding about the existing system of RME firm that can
maintain and control the overall business activities. Here, I have learnt about the specific aim and
objective of RME that help for me to gain more knowledge about the process. I also improve my
own ability for identifying resources for project development and design.
From the findings above, it concluded that Information system analysis and design is a type
of process that applicable in the enterprises for maintaining the information about consumers,
suppliers, payments and orders by using new system. In above discussion, it can be identified the
importance of new system in organization that perform all task effectively and efficiently. It has
been summarised to calculate the overall cost which requires for developing and designing the
system. It has led to demonstrate about gaining more knowledge which always influence towards
existing system and its activities in organization.
13
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Book and Journals
Aydiner, A.S. and et.al., 2019. Information system capabilities and firm performance: Opening
the black box through decision-making performance and business-process
performance. International Journal of Information Management. 47. pp.168-182.
Goldstein, A., Johanndeiter, T. and Frank, U., 2019. Business process runtime models: towards
bridging the gap between design, enactment, and evaluation of business
processes. Information Systems and e-Business Management. 17(1). pp.27-64.
Michalitsi-Psarrou, A. and et.al., 2019. Empowering Product Co-creation Approaches Through
Business Interoperability Concepts: The Toy Industry Case. In Enterprise
Interoperability VIII (pp. 397-408). Springer, Cham.
Turetken, O., Grefen, P. and Adali, O.E., 2019. Service-dominant business model design for
digital innovation in smart mobility. Business & Information Systems Engineering. 61(1).
pp.9-29.
Turkman, S. and Taweel, A., 2019, July. Business Process Model Driven Automatic Software
Requirements Generation. In International Symposium on Business Modeling and
Software Design (pp. 270-278). Springer, Cham.
van Engelenburg, S., Janssen, M. and Klievink, B., 2019. Design of a software architecture
supporting business-to-government information sharing to improve public safety and
security. Journal of Intelligent information systems. pp.1-24.
Weske, M., 2019. Business Process Modelling Foundation. In Business Process
Management (pp. 71-122). Springer, Berlin, Heidelberg.
14
Document Page
15
chevron_up_icon
1 out of 15
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]