MAN6925 Project Management Plan: System Implementation Project
VerifiedAdded on  2022/10/10
|24
|3398
|406
Project
AI Summary
This project management plan outlines the implementation of a new project management system, encompassing scope definition, stakeholder management, communication, procurement, and costing modules. The plan includes data import via comma-delimited files or XML, requiring the purchase of a server and 20 client PCs. The project tasks include gathering requirements, server and software installation, client PC setup, data import, testing, user acceptance testing, employee training, and go-live support. The plan details the scope statement, identifies project stakeholders and their roles, addresses the problem statement, defines project goals and objectives, specifies project requirements and deliverables, and outlines milestones. The plan also includes project assumptions, risks, and limitations. The project estimation section utilizes analogous, parametric, and bottom-up estimation methods to calculate project costs. Furthermore, the plan incorporates a stakeholder management plan, work breakdown structure, communication management plan, risk analysis, procurement plan, Gantt chart, critical path analysis, critical chain analysis, and a cost baseline to ensure successful project execution.

Running head: PROJECT MANAGEMENT
 TheinformationonthiscoversheetwillbeincludedinTurnitin’ssimilarityanalysis;however,
your lecturers are aware of this and will disregard it.
Student Details
Student Number
Family Name Please fill Given Name Please fill
Unit Details
Unit Code Please fill Unit Title Project Management
Name of Lecturer Mr. Steve BYERS Due Date Please fill
Topic of Assignment Project Management Plan Group or Tutorial (if applicable)
Course Please fill Campus Off-campus
I certify that the attached assignment is my own work and that any material drawn from other sources has been
acknowledged. This work has not previously been submitted for assessment in any other unit or course.
Copyright in assignments remains my property. I grant permission to the University to make copies of assignments
for assessment, review and/or record keeping purposes. I note that the University reserves the right to check my
assignment for plagiarism. Should the reproduction of all or part of an assignment be required by the University for
any purpose other than those mentioned above, appropriate authorisation will be sought from me on the relevant
form.
Manual Submission
Ifhandinginanassignmentina paperor otherphysicalform,signheretoindicatethatyouhavereadthisform,filleditin
completelyandthatyoucertifyasabove.
Signature Date
Office Use Only
Electronic Submission
OR, if submitting this paper electronically as per instructions for the unit, place an ‘X’ in the
box below to indicate that you have read this form and filled it in completely and that you
certify as above. Please include this page with your submission. Any responses to this
submission will be sent to your ECU email address.
Agreement ☒select check box Date
For procedures and penalties on late assignments please refer tothe University Admission,EnrolmentandAcademic
ProgressRules - rule 24, and the ECU Course and Unit Delivery and Assessment Policy
Assignment Cover Sheet
 TheinformationonthiscoversheetwillbeincludedinTurnitin’ssimilarityanalysis;however,
your lecturers are aware of this and will disregard it.
Student Details
Student Number
Family Name Please fill Given Name Please fill
Unit Details
Unit Code Please fill Unit Title Project Management
Name of Lecturer Mr. Steve BYERS Due Date Please fill
Topic of Assignment Project Management Plan Group or Tutorial (if applicable)
Course Please fill Campus Off-campus
I certify that the attached assignment is my own work and that any material drawn from other sources has been
acknowledged. This work has not previously been submitted for assessment in any other unit or course.
Copyright in assignments remains my property. I grant permission to the University to make copies of assignments
for assessment, review and/or record keeping purposes. I note that the University reserves the right to check my
assignment for plagiarism. Should the reproduction of all or part of an assignment be required by the University for
any purpose other than those mentioned above, appropriate authorisation will be sought from me on the relevant
form.
Manual Submission
Ifhandinginanassignmentina paperor otherphysicalform,signheretoindicatethatyouhavereadthisform,filleditin
completelyandthatyoucertifyasabove.
Signature Date
Office Use Only
Electronic Submission
OR, if submitting this paper electronically as per instructions for the unit, place an ‘X’ in the
box below to indicate that you have read this form and filled it in completely and that you
certify as above. Please include this page with your submission. Any responses to this
submission will be sent to your ECU email address.
Agreement ☒select check box Date
For procedures and penalties on late assignments please refer tothe University Admission,EnrolmentandAcademic
ProgressRules - rule 24, and the ECU Course and Unit Delivery and Assessment Policy
Assignment Cover Sheet
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Table of Contents
1. Case Study...................................................................................................................................3
2. Scope statement...........................................................................................................................4
2.1 Project owner, sponsors and stakeholders.............................................................................4
2.2 The problem statement..........................................................................................................4
2.3 Project goals and objectives...................................................................................................5
2.4 Project requirements..............................................................................................................5
2.5 Project deliverables................................................................................................................6
2.6 Milestones..............................................................................................................................6
2.7 Project assumptions and risks................................................................................................6
2.8 Project limitations..................................................................................................................7
2.9 Project acceptance criteria.....................................................................................................7
3. Estimation....................................................................................................................................8
3.1 Analogous estimate................................................................................................................8
3.2 Parametric estimate................................................................................................................8
3.3 Bottom up estimate..............................................................................................................10
4. Stakeholder management plan...................................................................................................11
5. Work breakdown structure........................................................................................................14
6. Communication management plan............................................................................................14
7. Risk analysis..............................................................................................................................16
Table of Contents
1. Case Study...................................................................................................................................3
2. Scope statement...........................................................................................................................4
2.1 Project owner, sponsors and stakeholders.............................................................................4
2.2 The problem statement..........................................................................................................4
2.3 Project goals and objectives...................................................................................................5
2.4 Project requirements..............................................................................................................5
2.5 Project deliverables................................................................................................................6
2.6 Milestones..............................................................................................................................6
2.7 Project assumptions and risks................................................................................................6
2.8 Project limitations..................................................................................................................7
2.9 Project acceptance criteria.....................................................................................................7
3. Estimation....................................................................................................................................8
3.1 Analogous estimate................................................................................................................8
3.2 Parametric estimate................................................................................................................8
3.3 Bottom up estimate..............................................................................................................10
4. Stakeholder management plan...................................................................................................11
5. Work breakdown structure........................................................................................................14
6. Communication management plan............................................................................................14
7. Risk analysis..............................................................................................................................16

2PROJECT MANAGEMENT
8. Procurement plan.......................................................................................................................17
9. Gantt chart.................................................................................................................................18
10. Critical path.............................................................................................................................19
11. Critical chain............................................................................................................................20
12. Cost baseline............................................................................................................................21
References......................................................................................................................................22
8. Procurement plan.......................................................................................................................17
9. Gantt chart.................................................................................................................................18
10. Critical path.............................................................................................................................19
11. Critical chain............................................................................................................................20
12. Cost baseline............................................................................................................................21
References......................................................................................................................................22
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT
1. Case Study
The project is reflected on implementation of project management system included scope
and feasibility module, stakeholder management module, communication module, procurement
module as well as costing modules. The proposed management system is included data imported
via comma delimited files or XML. It is required to buy server for running system and require 20
client PCs. The project plan is required with higher level work related project activities such as:
ï‚· Gathering of project requirements
ï‚· Installation of the server
ï‚· Installation of the server software
ï‚· Setting up of client PC with the windows 10
ï‚· Installation of client project software on PC
ï‚· Testing of each PC
ï‚· Parse as well as import of data
ï‚· Performing user acceptance testing of the application
ï‚· Performing training of the employees
ï‚· Go live support
ï‚· Review entire project work
1. Case Study
The project is reflected on implementation of project management system included scope
and feasibility module, stakeholder management module, communication module, procurement
module as well as costing modules. The proposed management system is included data imported
via comma delimited files or XML. It is required to buy server for running system and require 20
client PCs. The project plan is required with higher level work related project activities such as:
ï‚· Gathering of project requirements
ï‚· Installation of the server
ï‚· Installation of the server software
ï‚· Setting up of client PC with the windows 10
ï‚· Installation of client project software on PC
ï‚· Testing of each PC
ï‚· Parse as well as import of data
ï‚· Performing user acceptance testing of the application
ï‚· Performing training of the employees
ï‚· Go live support
ï‚· Review entire project work
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
2. Scope statement
2.1 Project owner, sponsors and stakeholders
The project is involved with implementation of project management system with proper
planning as well as carrying out of this development plan. The key personnel’s those are
involved in the project plan are:
Project Sponsor- Johnny Jim
Project Manager- (Please enter your name)
Project stakeholders:
Team Leader- Sim Smith
Procurement Manager- Kimmy Son
Developer- William Liam
Finance Manager- James Lucas
2.2 The problem statement
The organization faces problem in its existing system as there is lot of data losses,
inefficient costing, lack of stakeholder and procurement planning. There is no server and client
PC of its current system (Kerzner 2017). Therefore, the organization decided to develop new
information system having feasibility module, stakeholder management module, communication
module, procurement module as well as costing modules to make faster business operations.
2. Scope statement
2.1 Project owner, sponsors and stakeholders
The project is involved with implementation of project management system with proper
planning as well as carrying out of this development plan. The key personnel’s those are
involved in the project plan are:
Project Sponsor- Johnny Jim
Project Manager- (Please enter your name)
Project stakeholders:
Team Leader- Sim Smith
Procurement Manager- Kimmy Son
Developer- William Liam
Finance Manager- James Lucas
2.2 The problem statement
The organization faces problem in its existing system as there is lot of data losses,
inefficient costing, lack of stakeholder and procurement planning. There is no server and client
PC of its current system (Kerzner 2017). Therefore, the organization decided to develop new
information system having feasibility module, stakeholder management module, communication
module, procurement module as well as costing modules to make faster business operations.

5PROJECT MANAGEMENT
2.3 Project goals and objectives
The following goals of this proposed information system are to be achieved to get project
success such as:
ï‚· Client server model to share data
ï‚· Estimation of project budget
ï‚· Creating a project cost baseline
ï‚· Setting up of client PC with the windows 10
ï‚· Installation of client project software on PC
Following are objectives of this project plan such as:
ï‚· Preparing a cost management plan system for the business organization
ï‚· Information system having stakeholder and procurement modules
ï‚· Import of the data without enter in the information system
2.4 Project requirements
The project management system is used for storage as well as distribution of project
information. The components of the project information system are:
ï‚· Scheduling and estimating communicated to stakeholders and baseline for project control
ï‚· Collaborative work management
ï‚· Project documentation as well as data
ï‚· Allocation of resources
ï‚· Arranging to store approved project plan
ï‚· Evolving of communication plan to organizational employees
2.3 Project goals and objectives
The following goals of this proposed information system are to be achieved to get project
success such as:
ï‚· Client server model to share data
ï‚· Estimation of project budget
ï‚· Creating a project cost baseline
ï‚· Setting up of client PC with the windows 10
ï‚· Installation of client project software on PC
Following are objectives of this project plan such as:
ï‚· Preparing a cost management plan system for the business organization
ï‚· Information system having stakeholder and procurement modules
ï‚· Import of the data without enter in the information system
2.4 Project requirements
The project management system is used for storage as well as distribution of project
information. The components of the project information system are:
ï‚· Scheduling and estimating communicated to stakeholders and baseline for project control
ï‚· Collaborative work management
ï‚· Project documentation as well as data
ï‚· Allocation of resources
ï‚· Arranging to store approved project plan
ï‚· Evolving of communication plan to organizational employees
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT
2.5 Project deliverables
The lists of project deliverables are:
i. Work statement
ii. Project scope statement
iii. System and interface design
iv. System testing documents
v. Project training manuals
vi. Deployment of system in production
vii. Closeout of implementation plan
2.6 Milestones
The project milestones are:
Key project milestone activities Estimate time
Gathering of project requirements September 2019
Deployment phase October 2019
Client PC set up phase October 2019
Testing phase October 2019
Data import phase October 2019
Training phase November 2019
2.7 Project assumptions and risks
The project assumptions statements are that the project should complete in scheduled
timeframe as well as estimated project budget. The stakeholders are providing greater impact on
2.5 Project deliverables
The lists of project deliverables are:
i. Work statement
ii. Project scope statement
iii. System and interface design
iv. System testing documents
v. Project training manuals
vi. Deployment of system in production
vii. Closeout of implementation plan
2.6 Milestones
The project milestones are:
Key project milestone activities Estimate time
Gathering of project requirements September 2019
Deployment phase October 2019
Client PC set up phase October 2019
Testing phase October 2019
Data import phase October 2019
Training phase November 2019
2.7 Project assumptions and risks
The project assumptions statements are that the project should complete in scheduled
timeframe as well as estimated project budget. The stakeholders are providing greater impact on
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
project management system development as well as implementation. It is assumed that each
modules featured in the information system should work for the client server environment (MejÃa
et al. 2016). The proposed project information system should be cost effective.
The assumptions those are not coming true becomes risks for the business organization.
The project risks associated to the system are required to manage in project development phase.
There is an increase in project schedule for 7 days causes lack of project assumptions. It can
cause increase in project risks. There is also scope change causes scope creep.
2.8 Project limitations
The lists of project limitations are as follows:
Timeframe limitation: The project is required to complete as soon as possible. With
timeframe limitation, the project audience should demand for the final project result before
scheduled time.
Resource limitation: There is availability of enough project resources involved in the
project while some resources are not having proper skills and knowledge to handle the
information system.
2.9 Project acceptance criteria
i. The project plan is estimated with project cost by means of analogous estimate,
parametric estimate and bottom up estimate.
ii. The project sponsor should review project progress followed by the key
milestones set by the project manager.
iii. The project manager along with project sponsor should sign up the development
documents before the development should start.
project management system development as well as implementation. It is assumed that each
modules featured in the information system should work for the client server environment (MejÃa
et al. 2016). The proposed project information system should be cost effective.
The assumptions those are not coming true becomes risks for the business organization.
The project risks associated to the system are required to manage in project development phase.
There is an increase in project schedule for 7 days causes lack of project assumptions. It can
cause increase in project risks. There is also scope change causes scope creep.
2.8 Project limitations
The lists of project limitations are as follows:
Timeframe limitation: The project is required to complete as soon as possible. With
timeframe limitation, the project audience should demand for the final project result before
scheduled time.
Resource limitation: There is availability of enough project resources involved in the
project while some resources are not having proper skills and knowledge to handle the
information system.
2.9 Project acceptance criteria
i. The project plan is estimated with project cost by means of analogous estimate,
parametric estimate and bottom up estimate.
ii. The project sponsor should review project progress followed by the key
milestones set by the project manager.
iii. The project manager along with project sponsor should sign up the development
documents before the development should start.

8PROJECT MANAGEMENT
3. Estimation
3.1 Analogous estimate
Expenses Details Total cost estimate
Capital Purchasing of 20 clients PCs $75,600.00
Capital Windows 10 for PCs $4,000.00
Capital
Hiring of the project
personnel $64,000.00
Capital Purchasing of accessories $300,789.00
Capital Hardware equipments $152,390.00
Capital Software equipments $4,689.00
Total $601,468.00
3.2 Parametric estimate
Description of work QTY RATE AMOUNT
Dependent variables
Scope and feasibility module 1 $500.00 $500.00
Stakeholder management
module 1 $790.00 $790.00
Communication module 1 $560.00 $560.00
3. Estimation
3.1 Analogous estimate
Expenses Details Total cost estimate
Capital Purchasing of 20 clients PCs $75,600.00
Capital Windows 10 for PCs $4,000.00
Capital
Hiring of the project
personnel $64,000.00
Capital Purchasing of accessories $300,789.00
Capital Hardware equipments $152,390.00
Capital Software equipments $4,689.00
Total $601,468.00
3.2 Parametric estimate
Description of work QTY RATE AMOUNT
Dependent variables
Scope and feasibility module 1 $500.00 $500.00
Stakeholder management
module 1 $790.00 $790.00
Communication module 1 $560.00 $560.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT
Estimation of cost baseline 1 $400.00 $400.00
Procurement module 1 $690.00 $690.00
Costing modules 1 $500.00 $500.00
Hardware requirements
Cloud server 1 $6,790.00 $6,790.00
20 client PC 20 $3,780.00 $75,600.00
Hardware equipments 1250 $56.00 $70,000.00
Software requirements
Windows 10 for PCs 20 $200.00 $4,000.00
User applications 1 $30.00 $30.00
Client project software on PC 1 $209.00 $209.00
Server software 1 $450.00 $450.00
Independent variables
Team leader 3 $2,000.00 $6,000.00
System analyst 2 $1,690.00 $3,380.00
Developer 2 $1,290.00 $2,580.00
Tester 2 $1,490.00 $2,980.00
Wiring of the computer
server 10 $109.00 $1,090.00
Hiring contract 1 $60.00 $60.00
Project length Average $300,789.00
Purchasing of accessories Average $300,789.00
Total $778,187.00
Estimation of cost baseline 1 $400.00 $400.00
Procurement module 1 $690.00 $690.00
Costing modules 1 $500.00 $500.00
Hardware requirements
Cloud server 1 $6,790.00 $6,790.00
20 client PC 20 $3,780.00 $75,600.00
Hardware equipments 1250 $56.00 $70,000.00
Software requirements
Windows 10 for PCs 20 $200.00 $4,000.00
User applications 1 $30.00 $30.00
Client project software on PC 1 $209.00 $209.00
Server software 1 $450.00 $450.00
Independent variables
Team leader 3 $2,000.00 $6,000.00
System analyst 2 $1,690.00 $3,380.00
Developer 2 $1,290.00 $2,580.00
Tester 2 $1,490.00 $2,980.00
Wiring of the computer
server 10 $109.00 $1,090.00
Hiring contract 1 $60.00 $60.00
Project length Average $300,789.00
Purchasing of accessories Average $300,789.00
Total $778,187.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT MANAGEMENT
3.3 Bottom up estimate
WBS Task Name Cost
1 Requirements Gathering
1.1 Collecting the system needs $10,080.00
1.2 Regular meetings with the stakeholders $8,800.00
1.3 Identification of risk factors $4,320.00
2 Development of the system
2.1 Installation of the server $4,800.00
2.2 Installation of server software $8,640.00
2.3 Setting of client PC with windows 10 $15,120.00
2.4 Installation of client project software on PC $23,520.00
3 Testing of the system
3.1 Testing of each client PC $14,160.00
3.2 Import of data $9,120.00
3.3 User acceptance testing $3,240.00
4 Training phase
4.1 $9,600.00
5 Go live support $1,840.00
6 Review of entire project work $5,520.00
7 Completion of project plan $480.00
Total $119,240.00
3.3 Bottom up estimate
WBS Task Name Cost
1 Requirements Gathering
1.1 Collecting the system needs $10,080.00
1.2 Regular meetings with the stakeholders $8,800.00
1.3 Identification of risk factors $4,320.00
2 Development of the system
2.1 Installation of the server $4,800.00
2.2 Installation of server software $8,640.00
2.3 Setting of client PC with windows 10 $15,120.00
2.4 Installation of client project software on PC $23,520.00
3 Testing of the system
3.1 Testing of each client PC $14,160.00
3.2 Import of data $9,120.00
3.3 User acceptance testing $3,240.00
4 Training phase
4.1 $9,600.00
5 Go live support $1,840.00
6 Review of entire project work $5,520.00
7 Completion of project plan $480.00
Total $119,240.00

11PROJECT MANAGEMENT
4. Stakeholder management plan
Name Position in
the project
Role Contact Stakeholder
requirements
Stakeholder
expectations
Influence
Johnny
Jim
Project
Sponsor
Leading jim@gmai
l.com
Sign off the
project
requirements
documents
Weekly basis
report on the
budget plan
High
power,
high
interest
Please
enter
your
name
Project
Manager
Leading manager
@gmail.c
om
Sign off the
project
requirements
documents
Project progress
and tracking
High
power,
high
interest
Sim
Smith
Team
Leader
Leading sim@gma
il.om
Updating
schedule of
project plan
Meetings with the
project key
milestones
High
power,
high
interest
Kimmy
Son
Procuremen
t Manager
Supportiv
e
son@gmai
l.com
Procure the
materials
Weekly meetings High
power,
low
interest
William
Liam
Developer Supportiv
e
William@
gmail.com
Develop the
current system
with client server
Meetings and
update of system
Low
power,
low
4. Stakeholder management plan
Name Position in
the project
Role Contact Stakeholder
requirements
Stakeholder
expectations
Influence
Johnny
Jim
Project
Sponsor
Leading jim@gmai
l.com
Sign off the
project
requirements
documents
Weekly basis
report on the
budget plan
High
power,
high
interest
Please
enter
your
name
Project
Manager
Leading manager
@gmail.c
om
Sign off the
project
requirements
documents
Project progress
and tracking
High
power,
high
interest
Sim
Smith
Team
Leader
Leading sim@gma
il.om
Updating
schedule of
project plan
Meetings with the
project key
milestones
High
power,
high
interest
Kimmy
Son
Procuremen
t Manager
Supportiv
e
son@gmai
l.com
Procure the
materials
Weekly meetings High
power,
low
interest
William
Liam
Developer Supportiv
e
William@
gmail.com
Develop the
current system
with client server
Meetings and
update of system
Low
power,
low
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 24
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.