This report provides an in-depth analysis of the change requirements for Quasar Communications, a division of Communication Systems International. It examines the need for changes in various areas, including R&D, small customer, and capital equipment project management. The report details specific changes needed to improve communication, coordination, and leadership within the organization. It addresses issues such as the marketing department's project cancellations, project managers' workloads, and the roles of line managers. The report further explores integrated change control processes, emphasizing the importance of a structured approach from change proposal to implementation. Justification for the changes is provided, highlighting how they will enhance productivity, customer satisfaction, and the company's overall reputation. The report concludes by summarizing the key changes and their expected positive impact on Quasar Communications' project management processes and outcomes, emphasizing the need for an efficient organizational structure and effective leadership skills.

Running head: INTEGRATED BUSINESS MANAGEMENT
Integrated Business Management
Name of the Student
Name of the University
Author Note
Integrated Business Management
Name of the Student
Name of the University
Author Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1INTEGRATED BUSINESS MANAGEMENT
Table of Contents
Introduction:...............................................................................................................................2
Change Request Analysis:..........................................................................................................2
Change Details in the Project Management Processes:.............................................................3
Integrated Change Control:........................................................................................................4
Justification of the Required Change:........................................................................................6
Conclusion:................................................................................................................................7
Table of Contents
Introduction:...............................................................................................................................2
Change Request Analysis:..........................................................................................................2
Change Details in the Project Management Processes:.............................................................3
Integrated Change Control:........................................................................................................4
Justification of the Required Change:........................................................................................6
Conclusion:................................................................................................................................7

2INTEGRATED BUSINESS MANAGEMENT
Introduction:
The report is about the change requirement that are made on the quasar
communications management. The quasar communication is the world’s leading
communication industry. In the report the analysis will be done as per the changes that are
assessed in the previous part of the project. Several changes are mentioned that are necessary
for the company in various part of the workplace. The details of the all management changes
will be discussed further in the report. The integrated change of the controls will be analysed.
The justification of the changes will be discussed that how the changes are affect the
company. The project consists of a life cycle and the each part of the life cycle is important
for the whole project and if any changes made in the organization then it will be reflect in the
all steps of the software project life cycle. The changes involved three different areas, as the
whole organization is formed into four sections, the project management had to be made for
the each of the four sections, and the company needs to hire different employees for the
training of the staffs externally.
Change Request Analysis:
The case study is defines that there are several situation arrived where the change in
the management is became necessary for the quasar communication company. The changes
that are required for the company are analysed. The first change is needed in the R&D project
management. In the R&D project management the main issue that is raised is with the
coordination and communication. The problem is with the department of the marketing where
they cancel and rejects various projects without the permission of the project manager and
this issue needed to be resolved and must be changed (Kerzner & Kerzner 2017). Another
problem that is raised with the small customer project management where the project
manager is not capable of doing multiple task at a time. The mentality of the project manager
Introduction:
The report is about the change requirement that are made on the quasar
communications management. The quasar communication is the world’s leading
communication industry. In the report the analysis will be done as per the changes that are
assessed in the previous part of the project. Several changes are mentioned that are necessary
for the company in various part of the workplace. The details of the all management changes
will be discussed further in the report. The integrated change of the controls will be analysed.
The justification of the changes will be discussed that how the changes are affect the
company. The project consists of a life cycle and the each part of the life cycle is important
for the whole project and if any changes made in the organization then it will be reflect in the
all steps of the software project life cycle. The changes involved three different areas, as the
whole organization is formed into four sections, the project management had to be made for
the each of the four sections, and the company needs to hire different employees for the
training of the staffs externally.
Change Request Analysis:
The case study is defines that there are several situation arrived where the change in
the management is became necessary for the quasar communication company. The changes
that are required for the company are analysed. The first change is needed in the R&D project
management. In the R&D project management the main issue that is raised is with the
coordination and communication. The problem is with the department of the marketing where
they cancel and rejects various projects without the permission of the project manager and
this issue needed to be resolved and must be changed (Kerzner & Kerzner 2017). Another
problem that is raised with the small customer project management where the project
manager is not capable of doing multiple task at a time. The mentality of the project manager
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3INTEGRATED BUSINESS MANAGEMENT
is different as he thinks that it is much easier to handle the big project rather that the projects
that are small in size. There are problems that are raised with the line managers also that they
are concluding decisions without consulting with the project manager as they thinks that they
are the superiors of the company and of the project. As the line managers not directly
associated with the project so it shows the lack of the communication between the project
managers and the line project managers (Nicholas & Steyn 2017). Lack of an efficient
leadership skill and lack of organizational structure is another problem that need to be
addressed and change for the efficient and effective productivity. The change that is required
is the conflicts between the department of the company where the character of the every
different are having different mind-set and that creates the conflicts between the departments.
The organizational is must for each and every company as it is the core part of the company
to grow on long term. The problem with the capital equipment of the project management is
proposed for the change. The project manager is conspires the project of his own as the low
priority ad value (Serra & Kunc 2015). The project managers thinks that the small projects
are less in value that is totally wrong as the projects that are small in size. By the help of the
small projects the company is able to gain reputation and their delivery efficiency. The
company will also be able to see the internal resources are working properly or not.
Change Details in the Project Management Processes:
Many changes are made on the processes of the project management as in the above
part the required change is already mentioned, that why the changes are required and for
which purpose. The main change that the processes of the project management needed to
change is to improve the communication and the coordination among the employees and of
the different departments. The marketing department must discuss and communicate with the
project manager before rejecting any project (Larson & Gray 2015). The marketing people
must conduct meetings or discuss face to face about the project and then mutually plan the
is different as he thinks that it is much easier to handle the big project rather that the projects
that are small in size. There are problems that are raised with the line managers also that they
are concluding decisions without consulting with the project manager as they thinks that they
are the superiors of the company and of the project. As the line managers not directly
associated with the project so it shows the lack of the communication between the project
managers and the line project managers (Nicholas & Steyn 2017). Lack of an efficient
leadership skill and lack of organizational structure is another problem that need to be
addressed and change for the efficient and effective productivity. The change that is required
is the conflicts between the department of the company where the character of the every
different are having different mind-set and that creates the conflicts between the departments.
The organizational is must for each and every company as it is the core part of the company
to grow on long term. The problem with the capital equipment of the project management is
proposed for the change. The project manager is conspires the project of his own as the low
priority ad value (Serra & Kunc 2015). The project managers thinks that the small projects
are less in value that is totally wrong as the projects that are small in size. By the help of the
small projects the company is able to gain reputation and their delivery efficiency. The
company will also be able to see the internal resources are working properly or not.
Change Details in the Project Management Processes:
Many changes are made on the processes of the project management as in the above
part the required change is already mentioned, that why the changes are required and for
which purpose. The main change that the processes of the project management needed to
change is to improve the communication and the coordination among the employees and of
the different departments. The marketing department must discuss and communicate with the
project manager before rejecting any project (Larson & Gray 2015). The marketing people
must conduct meetings or discuss face to face about the project and then mutually plan the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4INTEGRATED BUSINESS MANAGEMENT
project accordingly. By the help of this communication the process of the project
management will be improved and will be effective for the communication company. The
project manager of the employee must have the capability to do the multiple task at a time so
that the project will be get benefited from the project manager. The mentality of the manager
of the project needed to be changed, the project manager must treat the small project as he
handled the bigger project with high value and priority. The line managers needed to identify
their roles that is given by the project manager and they must not give the conclusion of the
project without the permission of the project manager (Marchewka 2014). The line managers
are not directly appointed for the project they are just the subordinate of the project manager.
The communication between the project manager and the line managers needed to be
improved for the mitigation of the conflict between them and result failure of the project. The
organizational structure is the main part of any company and the projects of the company.
The leader of the company must have the leadership skills in order to control the employees
of the company properly and make them work effectively and efficiently. The conflict
between the different departments is needed to be solved by the project manager (Verzuh
2015). The conflict mainly occur because the employees that are working for the different
department are having different opinion, the main role of the project manager is to give them
their opinion on which they will do their job on their each department. As the business of the
Quasar Communication Inc. is very large so that the organizational structure of the company
needed to be well organized so that the company will grow in long term. To maintain the
reputation of the company, the company must satisfy the need of the customer (Uhl &
Gollenia 2016). The project managers must considered the project at high priority and of high
value. The minor project are the main part of the company, and the project manager needs to
understand that as well. The project manager must complete the project on time in order to
deliver it within the deadline.
project accordingly. By the help of this communication the process of the project
management will be improved and will be effective for the communication company. The
project manager of the employee must have the capability to do the multiple task at a time so
that the project will be get benefited from the project manager. The mentality of the manager
of the project needed to be changed, the project manager must treat the small project as he
handled the bigger project with high value and priority. The line managers needed to identify
their roles that is given by the project manager and they must not give the conclusion of the
project without the permission of the project manager (Marchewka 2014). The line managers
are not directly appointed for the project they are just the subordinate of the project manager.
The communication between the project manager and the line managers needed to be
improved for the mitigation of the conflict between them and result failure of the project. The
organizational structure is the main part of any company and the projects of the company.
The leader of the company must have the leadership skills in order to control the employees
of the company properly and make them work effectively and efficiently. The conflict
between the different departments is needed to be solved by the project manager (Verzuh
2015). The conflict mainly occur because the employees that are working for the different
department are having different opinion, the main role of the project manager is to give them
their opinion on which they will do their job on their each department. As the business of the
Quasar Communication Inc. is very large so that the organizational structure of the company
needed to be well organized so that the company will grow in long term. To maintain the
reputation of the company, the company must satisfy the need of the customer (Uhl &
Gollenia 2016). The project managers must considered the project at high priority and of high
value. The minor project are the main part of the company, and the project manager needs to
understand that as well. The project manager must complete the project on time in order to
deliver it within the deadline.

5INTEGRATED BUSINESS MANAGEMENT
Integrated Change Control:
The integrated change control is necessary for the integration management of the
project. For each of the company change is a must needed aspect that must be implemented.
The changes is made by the different superior people who are in the higher position of the
company (Goldratt 2017). In this report many changes are suggested for the Quasar
Communication Inc. that is already discussed in the above part. The integrated change control
has three different process that are accept, reject or handled in different way. The integrated
change management works from the change proposal to the application of the change. For
successfully implementing the integrated change control a proper and accurate plan of the
project management is necessary. If the plan of the project management plan have the scope
then only the changes can be assessed in the processes of the project management for the
further changes (Harrison & Lock 2017). The role of the project manager is to find the root of
the cause that is needed to be changed in the project management processes. For the
integrated change management several change request, change analysis, change approval and
change implementation is used. First the changes needed to be identified then the members
that are affected need to analyse the cause and then needed to implement the challenges.
After the changes are requested the project manager will analyse the request and make
decision that whether the request will be accepted or rejected (Lientz & Rea 2016). The
changes can be initiate and implemented by the any member of the project and it will be
presided by the project manager and the project manager will assign a date for the
implementation of the project. After the implementation of the change the changes becomes a
small project itself. In the change request the analysis is made that what is the required
change and why it is needed to be changed. In the change analysis the impact of the change,
scope and the resources are assessed. After the assessment, the project manager make sure
that the documentation for the required change is made properly or not because the
Integrated Change Control:
The integrated change control is necessary for the integration management of the
project. For each of the company change is a must needed aspect that must be implemented.
The changes is made by the different superior people who are in the higher position of the
company (Goldratt 2017). In this report many changes are suggested for the Quasar
Communication Inc. that is already discussed in the above part. The integrated change control
has three different process that are accept, reject or handled in different way. The integrated
change management works from the change proposal to the application of the change. For
successfully implementing the integrated change control a proper and accurate plan of the
project management is necessary. If the plan of the project management plan have the scope
then only the changes can be assessed in the processes of the project management for the
further changes (Harrison & Lock 2017). The role of the project manager is to find the root of
the cause that is needed to be changed in the project management processes. For the
integrated change management several change request, change analysis, change approval and
change implementation is used. First the changes needed to be identified then the members
that are affected need to analyse the cause and then needed to implement the challenges.
After the changes are requested the project manager will analyse the request and make
decision that whether the request will be accepted or rejected (Lientz & Rea 2016). The
changes can be initiate and implemented by the any member of the project and it will be
presided by the project manager and the project manager will assign a date for the
implementation of the project. After the implementation of the change the changes becomes a
small project itself. In the change request the analysis is made that what is the required
change and why it is needed to be changed. In the change analysis the impact of the change,
scope and the resources are assessed. After the assessment, the project manager make sure
that the documentation for the required change is made properly or not because the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6INTEGRATED BUSINESS MANAGEMENT
documentation stores the accurate details of the changes that are made in the processes of the
processes.
Justification of the Required Change:
Change is required for the each of the company to mitigate the issues in the company
and to increase the productivity to gain the reputation. The company having less issues
deliver good product to the customers and meets the customer satisfaction. In this report in
the Quasar Communication Inc. several changes are made for the different purpose and in
different area of the management. The different areas where the changes are made on the
project management are in the R&D project management, small customer project
management, large customer project management, and capital equipment project
management (Kerzner 2018).
In the R&D project management the changes is necessary to improve the
communication and the coordination among the project manager and the employees of the
project. Changes are made to develop the relation between the marketing department and the
project manager to make a proper decision for the project (Lock 2017). The project manager
need to see the milestones of the project and aware each of the employees about the state by
conducting any kind of meetings.
In the small customer project management several changes are also made. The project
managers are trained for doing multiple task at a time for effectiveness of the company. The
further changes made in the mentality of the project manager to treat the all projects equally
whether it is small or large in size. The role of the line managers cleared for them to work
according to their designation and allocated work. They do not have the permission to do the
job without the approval of the project manager of the project.
documentation stores the accurate details of the changes that are made in the processes of the
processes.
Justification of the Required Change:
Change is required for the each of the company to mitigate the issues in the company
and to increase the productivity to gain the reputation. The company having less issues
deliver good product to the customers and meets the customer satisfaction. In this report in
the Quasar Communication Inc. several changes are made for the different purpose and in
different area of the management. The different areas where the changes are made on the
project management are in the R&D project management, small customer project
management, large customer project management, and capital equipment project
management (Kerzner 2018).
In the R&D project management the changes is necessary to improve the
communication and the coordination among the project manager and the employees of the
project. Changes are made to develop the relation between the marketing department and the
project manager to make a proper decision for the project (Lock 2017). The project manager
need to see the milestones of the project and aware each of the employees about the state by
conducting any kind of meetings.
In the small customer project management several changes are also made. The project
managers are trained for doing multiple task at a time for effectiveness of the company. The
further changes made in the mentality of the project manager to treat the all projects equally
whether it is small or large in size. The role of the line managers cleared for them to work
according to their designation and allocated work. They do not have the permission to do the
job without the approval of the project manager of the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7INTEGRATED BUSINESS MANAGEMENT
The main change that is made is on the organizational structure as the organizational
structure is the main part for any company to gain success in longer term. The leader of the
project needed to change the style of his leadership as the leadership is important to motivate
and encourage the employees who are working for the project under the team leader (Burke
2013).
The last change that is made on the processes of the project management is the mind-
set toward the small projects as the small projects are the backbone for the company. Using
the small projects and delivering them in the estimated time the company can meet the
customer satisfaction and gain the reputation in the market.
Conclusion:
From the above report it can be concluded that the Quasar Communication Inc.
needed some changes and the changes are made on the processes of the project management.
As the company is among the largest company so the issues within the company is needed to
be solved as per the change requirement. In the above report the change requirements are
analysed. The details of the all change that are made on the project management processes.
The integrated change control is discussed in the above report that how the changes is made
on the project management of the company. In the four area the change is addressed and the
project manager then analysed the required change and as per that the project manager will
make a decision whether the change will be granted or the change request will be rejected.
All the changes are reflected on the each phase of the life cycle of the project. Justification of
the changes also discussed in the above report that why the changes is made in the several
area of the company. These change reflects in a good way for the betterment of the company
so that the company will grow gradually.
The main change that is made is on the organizational structure as the organizational
structure is the main part for any company to gain success in longer term. The leader of the
project needed to change the style of his leadership as the leadership is important to motivate
and encourage the employees who are working for the project under the team leader (Burke
2013).
The last change that is made on the processes of the project management is the mind-
set toward the small projects as the small projects are the backbone for the company. Using
the small projects and delivering them in the estimated time the company can meet the
customer satisfaction and gain the reputation in the market.
Conclusion:
From the above report it can be concluded that the Quasar Communication Inc.
needed some changes and the changes are made on the processes of the project management.
As the company is among the largest company so the issues within the company is needed to
be solved as per the change requirement. In the above report the change requirements are
analysed. The details of the all change that are made on the project management processes.
The integrated change control is discussed in the above report that how the changes is made
on the project management of the company. In the four area the change is addressed and the
project manager then analysed the required change and as per that the project manager will
make a decision whether the change will be granted or the change request will be rejected.
All the changes are reflected on the each phase of the life cycle of the project. Justification of
the changes also discussed in the above report that why the changes is made in the several
area of the company. These change reflects in a good way for the betterment of the company
so that the company will grow gradually.

8INTEGRATED BUSINESS MANAGEMENT
References:
Burke, R. (2013). Project Management Techniques (2nd ed.). US: Burke Publishing.
Goldratt, E. M. (2017). Critical chain: A business novel. Routledge.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., & Gray, C. F. (2015). A Guide to the Project Management Body of
Knowledge: PMBOK (®) Guide. Project Management Institute.
Lientz, B., & Rea, K. (2016). Breakthrough technology project management. Routledge.
Lock, D. (2017). The essentials of project management. Routledge.
Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Routledge.
Project Management Institute. (2013). A guide to the project management body of knowledge
(PMBOK Guide) (5th ed). Newtown Square, PA: PMI.
Project Management Institute. (2013). Managing change in organisations: A practical guide.
Newtown Square, PM: PMI
References:
Burke, R. (2013). Project Management Techniques (2nd ed.). US: Burke Publishing.
Goldratt, E. M. (2017). Critical chain: A business novel. Routledge.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John
Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E. W., & Gray, C. F. (2015). A Guide to the Project Management Body of
Knowledge: PMBOK (®) Guide. Project Management Institute.
Lientz, B., & Rea, K. (2016). Breakthrough technology project management. Routledge.
Lock, D. (2017). The essentials of project management. Routledge.
Marchewka, J. T. (2014). Information technology project management. John Wiley & Sons.
Nicholas, J. M., & Steyn, H. (2017). Project management for engineering, business and
technology. Routledge.
Project Management Institute. (2013). A guide to the project management body of knowledge
(PMBOK Guide) (5th ed). Newtown Square, PA: PMI.
Project Management Institute. (2013). Managing change in organisations: A practical guide.
Newtown Square, PM: PMI
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9INTEGRATED BUSINESS MANAGEMENT
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK Guide) (6th ed.). Newtown Square, PA: PMI.
Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on
project success and on the execution of business strategies. International Journal of
Project Management, 33(1), 53-66.
Uhl, A., & Gollenia, L. A. (Eds.). (2016). Business transformation management
methodology. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
Project Management Institute. (2017). A guide to the project management body of knowledge
(PMBOK Guide) (6th ed.). Newtown Square, PA: PMI.
Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on
project success and on the execution of business strategies. International Journal of
Project Management, 33(1), 53-66.
Uhl, A., & Gollenia, L. A. (Eds.). (2016). Business transformation management
methodology. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
1 out of 10
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.