Integration of Lean Construction and BIM in Construction Projects

Verified

Added on  2021/09/21

|16
|414
|192
Report
AI Summary
This report delves into the integration of Lean Construction principles and Building Information Modelling (BIM) within the construction industry. It begins by outlining the core concepts of Lean Construction, emphasizing waste reduction and value enhancement, and then explores BIM functionalities, including 3D modeling, design validation, and project management. The report examines the application of Lean Construction principles and BIM functionalities, providing an interaction matrix to illustrate their combined effects. It identifies barriers and enablers for adopting an integrated approach, offering insights into optimizing project outcomes. The conclusion highlights the potential of this integration for transforming the construction sector, supported by recommendations and suggestions for future research.
Document Page
Research Paper
Integration of Lean Construction and
Building Information Modelling (BIM)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CHAPTER 1: Introduction
lean construction and building information modelling (BIM) is
used to minimize waste and add value to construction projects as
well as provide sustainable improvement options
Lean Construction aims at :
Specification of the value
Work flow
Pull and pursue perfection
Identification of the different steps in the value stream
Persuasion of perfection
Benefits of BIM:
design validation
quantity take-off
phase planning
site utilization planning
Document Page
Research Objective
To identify and assess lean principles and
methods that improve the value of construction
processes
To identify and assess BIM functionalities that
improve the value of construction processes
To review where integration of lean principles
and BIM functionalities have been applied to
identify gaps to develop new integration
framework
Identify barriers and enablers for integrating
lean construction and BIM
Document Page
Methodology
A literature
review in the
Scopus and
Web of
Science
databases
PRISMA
method to sort
the list
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Methodology
Thematic
Analysis
Inductive Thematic Analysis Theoretical Thematic
Analysis
Semantic Theme
Latent Theme
Document Page
CHAPTER 2: LEAN CONSTRUCTION PRINCIPLES
Specification
of the value
Identificatio
n of the
value stream
Work
Flow
Pull technique in
the production
process
Document Page
Application of lean
construction
Just in time (JIT)
Kaizen / Quality management
Time-based competition
Value-based management
Visual management
Employee involvement
Concurrent engineering
Kanban system
Lean project delivery system (LPDS)
Last planner system (LPS)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CHAPTER 3: BIM FUNCTIONALITIES
Digitization of a building and its elements
Typically takes the form of a three-
dimensional (3D) model
Can be reviewed using software such as
Navisworks
A minimum requirement for delivery of major
projects of UK government is Level 2 BIM
Design development and modeling
Model reviews through visualization
Production of documentation, management of
materials and costs, and project controls
Operation and maintenance of facilities
Document Page
Potential uses for BIM as per the
Natspec Guidelines
Modelling existing conditions
Site analysis
Space and equipment validation
Spatial and material design models
Design visualization for communication
and functional analysis
Code checking & Sustainability
evaluation
Structural Modelling and Analysis
Energy & Lighting Analysis
Virtual testing and balancing
Document Page
CHAPTER 4: INTEGRATING LEAN CONSTRUCTION
PRINCIPLES AND BIM FUNCTIONALITIES
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Interaction Matrix for Lean and BIM Activities
LEAN PRINCIPLES → Specify Value Identifying
Value Stream Work Flow Pull Pursue
Perfection
BIM FUNCTIONALITIES ↓
Data Capture for existing structures &
equipment
X X X X X
Development of models X X
Design analysis X
Collaborative reviews of safety,
constructability,and operability
X X X X X
Schedule sequencing X X X
Production of documentation and
fabrication drawings/models
X X X
Generation of reports X X X X X
Project controls
X X X
As-built documentation X X X
Operations planning X X
Operation manuals X X
Document Page
CHAPTER 5: BARRIERS AND ENABLERS TO
ADOPTING AN INTEGRATED APPROACH
Barriers and Enablers
Client
Government
Research and development
chevron_up_icon
1 out of 16
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]