PRJ701: IOT Healthcare Mobile App Project Proposal NMIT, 2018
VerifiedAdded on  2023/06/08
|16
|2764
|351
Project
AI Summary
This document presents a project proposal for the development of an IOT-based healthcare mobile application. The project aims to create a mobile application that simplifies healthcare functions for both patients and doctors, improving existing services through technological innovation. Key aspects covered in the proposal include project goals, background, functions (divided into initial, planning, design, execution, and closure phases), required skills, anticipated outcomes, application features (patient, doctor, and staff records, payment information, wireless connectivity, and doctor feedback), necessary resources, potential limitations (time, budget, quality), a detailed timeline, ethical considerations, and a statement of ownership. The proposal outlines a structured approach to project execution using IT project management principles, emphasizing the use of work packages and resource allocation to ensure successful completion within the estimated time and budget. The document also includes a work breakdown structure, a time-phased budget, and a Gantt chart illustrating the project schedule. The project is designed to enhance healthcare service delivery and accessibility through a user-friendly mobile application.

Running head: PROJECT PROPOSAL
Project Proposal
Development of IOT based Healthcare Mobile Application
Name of the Student:
Student ID:
Name of the University:
Author’ note:
Project Proposal
Development of IOT based Healthcare Mobile Application
Name of the Student:
Student ID:
Name of the University:
Author’ note:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT PROPOSAL
Table of Contents
Project Title.....................................................................................................................................2
Preferred Choice of Supervisor.......................................................................................................2
Fundamental Project Goal...............................................................................................................2
Background......................................................................................................................................3
Project Functions.............................................................................................................................3
Skills Required.................................................................................................................................5
Anticipated Outcomes.....................................................................................................................6
Features of Application....................................................................................................................6
Required Resources.........................................................................................................................7
Possible Limitations.........................................................................................................................9
Anticipated Timeline.......................................................................................................................9
Anticipated Ethical Issues..............................................................................................................13
Statement of Ownership................................................................................................................13
Bibliography..................................................................................................................................14
Table of Contents
Project Title.....................................................................................................................................2
Preferred Choice of Supervisor.......................................................................................................2
Fundamental Project Goal...............................................................................................................2
Background......................................................................................................................................3
Project Functions.............................................................................................................................3
Skills Required.................................................................................................................................5
Anticipated Outcomes.....................................................................................................................6
Features of Application....................................................................................................................6
Required Resources.........................................................................................................................7
Possible Limitations.........................................................................................................................9
Anticipated Timeline.......................................................................................................................9
Anticipated Ethical Issues..............................................................................................................13
Statement of Ownership................................................................................................................13
Bibliography..................................................................................................................................14

2PROJECT PROPOSAL
Project Title
The title of the project is
‘Formation of IOT based Healthcare Mobile Application’.
Preferred Choice of Supervisor
<<please_fill>>
Fundamental Project Goal
The goals of the ‘Formation of IOT based Healthcare Mobile Application’ project are,
Formation of Mobile Application: The mobile application was developed for easing the
functions of the organization. The ‘Formation of IOT based Healthcare Mobile Application’
project would result in forming the mobile application supporting the healthcare facilities to the
patients and doctors.
Support for Improvement of the functions: The existing functions was improved using
the technology innovation and faster delivery of the services. The improvement of the
technology for easing the supportive functions was a major benefit from the organization.
Completion of the project: The successful completion of the project was based on the
support and formation implying the IT formation functions. The improvement of the project was
based on the simplification of the functions so that the mobile application was developed in the
estimated time and budget.
Project Title
The title of the project is
‘Formation of IOT based Healthcare Mobile Application’.
Preferred Choice of Supervisor
<<please_fill>>
Fundamental Project Goal
The goals of the ‘Formation of IOT based Healthcare Mobile Application’ project are,
Formation of Mobile Application: The mobile application was developed for easing the
functions of the organization. The ‘Formation of IOT based Healthcare Mobile Application’
project would result in forming the mobile application supporting the healthcare facilities to the
patients and doctors.
Support for Improvement of the functions: The existing functions was improved using
the technology innovation and faster delivery of the services. The improvement of the
technology for easing the supportive functions was a major benefit from the organization.
Completion of the project: The successful completion of the project was based on the
support and formation implying the IT formation functions. The improvement of the project was
based on the simplification of the functions so that the mobile application was developed in the
estimated time and budget.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT PROPOSAL
Background
The project of ‘Formation of IOT based Healthcare Mobile Application’ is developed
aligning the simplification of the functions. The project was based on the use of the IT project
formation. The IT project management principles were executed for forming the mobile
application. The mobile application was developed for easing the functions of the organization.
The improvement of the technology for easing the supportive functions was a major benefit from
the organization.
Project Functions
The project of ‘Formation of IOT based Healthcare Mobile Application’ is developed for
easing the formation and formation of the functions favourable for the formation and installation
of the healthcare application was helpful for easing the simplification of the factors defining the
processes of the functions. The support and formation using the formation of effective and smart
improvement methods was successively deployed using specific work packages. The following
diagram would show the work packages required for the execution of the project,
Background
The project of ‘Formation of IOT based Healthcare Mobile Application’ is developed
aligning the simplification of the functions. The project was based on the use of the IT project
formation. The IT project management principles were executed for forming the mobile
application. The mobile application was developed for easing the functions of the organization.
The improvement of the technology for easing the supportive functions was a major benefit from
the organization.
Project Functions
The project of ‘Formation of IOT based Healthcare Mobile Application’ is developed for
easing the formation and formation of the functions favourable for the formation and installation
of the healthcare application was helpful for easing the simplification of the factors defining the
processes of the functions. The support and formation using the formation of effective and smart
improvement methods was successively deployed using specific work packages. The following
diagram would show the work packages required for the execution of the project,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT PROPOSAL
Development of IOT based
Healthcare Mobile
Application
Initial Phase
Identification of
requirements
Making List of
resources required
Accumulation of
resources
Charter
Documentation
Kick off
Planning Phase
Outline of the Plan
Review of Plan
Complete Plan
Development
Plan Approval
Design Phase
Interface Design is
developed
Complete Design is
formed
Design Simulation
Design Approved
Execution
Interface is formed
Functions are
aligned
Programming is
done
Functions are
defined
System is developed
System Approved
Closure
Final documents are
made
Inspection of the
system
Sign off
Project Closed
Figure 1: Work Breakdown Structure
The project functions was divided into the five phases of initial phase, planning phase,
design phase, execution phase, and closure phase. These phases was completed successfully for
developing the final project execution. The explanation of the phases is shown below,
Initial Phase: The initial phase of the project was based on the initialization of the
project functions and defining of the successful formation. The initial phase would comprise of
identification of requirements, making list of resources required, accumulation of resources,
charter documentation, and kick off. In this phase the functions of the project was initiated by the
use of the resource identification and the formation of the initiation documents.
Plan Formation Phase: The planning phase would comprise of developing the
successful activity scheduling and forming the simplification of the project functions. The plan
formation was implied for easing the utilization of the formation process. It would include
outline of the plan, review of plan, complete plan formation, and plan approval. The plan
Development of IOT based
Healthcare Mobile
Application
Initial Phase
Identification of
requirements
Making List of
resources required
Accumulation of
resources
Charter
Documentation
Kick off
Planning Phase
Outline of the Plan
Review of Plan
Complete Plan
Development
Plan Approval
Design Phase
Interface Design is
developed
Complete Design is
formed
Design Simulation
Design Approved
Execution
Interface is formed
Functions are
aligned
Programming is
done
Functions are
defined
System is developed
System Approved
Closure
Final documents are
made
Inspection of the
system
Sign off
Project Closed
Figure 1: Work Breakdown Structure
The project functions was divided into the five phases of initial phase, planning phase,
design phase, execution phase, and closure phase. These phases was completed successfully for
developing the final project execution. The explanation of the phases is shown below,
Initial Phase: The initial phase of the project was based on the initialization of the
project functions and defining of the successful formation. The initial phase would comprise of
identification of requirements, making list of resources required, accumulation of resources,
charter documentation, and kick off. In this phase the functions of the project was initiated by the
use of the resource identification and the formation of the initiation documents.
Plan Formation Phase: The planning phase would comprise of developing the
successful activity scheduling and forming the simplification of the project functions. The plan
formation was implied for easing the utilization of the formation process. It would include
outline of the plan, review of plan, complete plan formation, and plan approval. The plan

5PROJECT PROPOSAL
formation phase was formed for easing the simplification of the functions defining the support
and formation management.
Design Phase: The design phase would involve the formation of the effective design and
formation of the successful utilization process. The design of the application was designed in this
phase making is suitable to develop the IOT based healthcare mobile application as the final
deliverable. The design phase would include the following functions interface design is
developed, complete design is formed, design simulation, and design approved.
Execution: The execution phase is developed forming the improvement of the improved
operation formation for ensuring that the project would result in forming the completion of the
IOT based healthcare mobile application. The phase would involve the functions of interface is
formed, functions are aligned, programming is done, functions are defined, system is developed,
and system approved.
Closure: The closure is the final phase of the project and it would involve the functions
of the final documents are made, inspection of the system, sign off, and project closed. It is the
end point of the project functions.
Skills Required
The skills required for the project functions are given below,
Project Members Skills
Analyst Deep analysis, Use of information, analytical
Project Manager Management of the functions, leadership, effective communication,
Documenter Writing, Documenting
formation phase was formed for easing the simplification of the functions defining the support
and formation management.
Design Phase: The design phase would involve the formation of the effective design and
formation of the successful utilization process. The design of the application was designed in this
phase making is suitable to develop the IOT based healthcare mobile application as the final
deliverable. The design phase would include the following functions interface design is
developed, complete design is formed, design simulation, and design approved.
Execution: The execution phase is developed forming the improvement of the improved
operation formation for ensuring that the project would result in forming the completion of the
IOT based healthcare mobile application. The phase would involve the functions of interface is
formed, functions are aligned, programming is done, functions are defined, system is developed,
and system approved.
Closure: The closure is the final phase of the project and it would involve the functions
of the final documents are made, inspection of the system, sign off, and project closed. It is the
end point of the project functions.
Skills Required
The skills required for the project functions are given below,
Project Members Skills
Analyst Deep analysis, Use of information, analytical
Project Manager Management of the functions, leadership, effective communication,
Documenter Writing, Documenting
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT PROPOSAL
Planner Planning tools, activity recognition,
Designer Designing capability, skills
Tester Testing,
Engineer Skills, Knowledge, and communicator
Programmer Programming, Communication
Anticipated Outcomes
The anticipated outcomes of the ‘Formation of IOT based Healthcare Mobile Application
project are,
ï‚· The project would result in forming the mobile application supporting the
healthcare facilities to the patients and doctors.
ï‚· The existing functions were improved using the technology innovation and faster
delivery of the services.
Features of Application
The probable features of the Formation of IOT based Healthcare Mobile Application are
given below,
Patient Records: the application would serve the purpose of keeping the records of the
patients so that it can be accessed easily in time of need.
Doctor Records: the application would serve the purpose of keeping the records of the
doctors so that it can be accessed easily in time of need.
Planner Planning tools, activity recognition,
Designer Designing capability, skills
Tester Testing,
Engineer Skills, Knowledge, and communicator
Programmer Programming, Communication
Anticipated Outcomes
The anticipated outcomes of the ‘Formation of IOT based Healthcare Mobile Application
project are,
ï‚· The project would result in forming the mobile application supporting the
healthcare facilities to the patients and doctors.
ï‚· The existing functions were improved using the technology innovation and faster
delivery of the services.
Features of Application
The probable features of the Formation of IOT based Healthcare Mobile Application are
given below,
Patient Records: the application would serve the purpose of keeping the records of the
patients so that it can be accessed easily in time of need.
Doctor Records: the application would serve the purpose of keeping the records of the
doctors so that it can be accessed easily in time of need.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT PROPOSAL
Staff Records: the application would serve the purpose of keeping the records of the
staffs so that it can be accessed easily in time of need.
Payment Information: The payment information by the patients can be stored in the
application so that the doctors and patients would get the access to the payment records easily.
Wireless Connectivity: The wireless connectivity would allow the benefit of accessing
the information from any place and at any time.
Doctor Feedback: The feedback by the doctors would help in keeping track of the
patients health condition or any specific advice.
Required Resources
The project of ‘Formation of IOT based Healthcare Mobile Application’ is formed
supporting the improvement of the effective and improved formation process. The improvement
of the successive management of the processes was applied for easing the successful formation
of the application. Various resources were required for the improvement of the functions. The
utilization of the resources is given below,
Resource Name Type Work/Units Standard Rate Cost
Analyst Human 24 $85.00 $2,040.00
Project Manager Human 56 $150.00 $8,400.00
Documenter Human 40 $90.00 $3,600.00
Planner Human 48 $95.00 $4,560.00
Designer Human 72 $110.00 $7,920.00
Tester Human 40 $100.00 $4,000.00
Engineer Human 72 $140.00 $10,080.00
Staff Records: the application would serve the purpose of keeping the records of the
staffs so that it can be accessed easily in time of need.
Payment Information: The payment information by the patients can be stored in the
application so that the doctors and patients would get the access to the payment records easily.
Wireless Connectivity: The wireless connectivity would allow the benefit of accessing
the information from any place and at any time.
Doctor Feedback: The feedback by the doctors would help in keeping track of the
patients health condition or any specific advice.
Required Resources
The project of ‘Formation of IOT based Healthcare Mobile Application’ is formed
supporting the improvement of the effective and improved formation process. The improvement
of the successive management of the processes was applied for easing the successful formation
of the application. Various resources were required for the improvement of the functions. The
utilization of the resources is given below,
Resource Name Type Work/Units Standard Rate Cost
Analyst Human 24 $85.00 $2,040.00
Project Manager Human 56 $150.00 $8,400.00
Documenter Human 40 $90.00 $3,600.00
Planner Human 48 $95.00 $4,560.00
Designer Human 72 $110.00 $7,920.00
Tester Human 40 $100.00 $4,000.00
Engineer Human 72 $140.00 $10,080.00

8PROJECT PROPOSAL
Programmer Human 72 $125.00 $9,000.00
Documents Material 2 $100.00 $200.00
Design Tools Material 2 $900.00 $1,800.00
System Material 1 $1,500.00 $1,500.00
Program
Software Material 1 $1,000.00 $1,000.00
Testing Tools Material 2 $450.00 $900.00
Total Budget $55,000.00
The project was successfully implied with the help of easing the formation of the
effective resources accumulated for defining the formation. The project resources comprised of
both human and material resources defining the successful formation of the functions. The
analysis of the functions was successfully formed for easing the formation of the improved
formation. The following is the time phased diagram,
Programmer Human 72 $125.00 $9,000.00
Documents Material 2 $100.00 $200.00
Design Tools Material 2 $900.00 $1,800.00
System Material 1 $1,500.00 $1,500.00
Program
Software Material 1 $1,000.00 $1,000.00
Testing Tools Material 2 $450.00 $900.00
Total Budget $55,000.00
The project was successfully implied with the help of easing the formation of the
effective resources accumulated for defining the formation. The project resources comprised of
both human and material resources defining the successful formation of the functions. The
analysis of the functions was successfully formed for easing the formation of the improved
formation. The following is the time phased diagram,
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT PROPOSAL
Figure 2: Time Phased Budget
Possible Limitations
The possible limitations of the project are,
ï‚· Time Bounded
ï‚· Budget Limitation
ï‚· Quality Requirements
Anticipated Timeline
The project of ‘Formation of IOT based Healthcare Mobile Application’ is developed
forming the improvement of the effective and smart inclusion of the processing. The project
schedule is shown below,
WBS Task Name Duration Start Finish
0 Formation of IOT based Healthcare Mobile
Application 53 days Wed 8/1/18 Fri 10/12/18
1 Initial Phase 9 days Wed 8/1/18 Mon
8/13/18
1.1 Identification of requirements 2 days Wed 8/1/18 Thu 8/2/18
1.2 Making List of resources required 1 day Fri 8/3/18 Fri 8/3/18
1.3 Accumulation of resources 4 days Mon 8/6/18 Thu 8/9/18
1.4 Charter Documentation 2 days Fri 8/10/18 Mon
8/13/18
1.5 Kick off 0 days Mon 8/13/18 Mon
8/13/18
2 Planning Phase 8 days Tue 8/14/18 Thu 8/23/18
Figure 2: Time Phased Budget
Possible Limitations
The possible limitations of the project are,
ï‚· Time Bounded
ï‚· Budget Limitation
ï‚· Quality Requirements
Anticipated Timeline
The project of ‘Formation of IOT based Healthcare Mobile Application’ is developed
forming the improvement of the effective and smart inclusion of the processing. The project
schedule is shown below,
WBS Task Name Duration Start Finish
0 Formation of IOT based Healthcare Mobile
Application 53 days Wed 8/1/18 Fri 10/12/18
1 Initial Phase 9 days Wed 8/1/18 Mon
8/13/18
1.1 Identification of requirements 2 days Wed 8/1/18 Thu 8/2/18
1.2 Making List of resources required 1 day Fri 8/3/18 Fri 8/3/18
1.3 Accumulation of resources 4 days Mon 8/6/18 Thu 8/9/18
1.4 Charter Documentation 2 days Fri 8/10/18 Mon
8/13/18
1.5 Kick off 0 days Mon 8/13/18 Mon
8/13/18
2 Planning Phase 8 days Tue 8/14/18 Thu 8/23/18
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10PROJECT PROPOSAL
2.1 Outline of the Plan 1 day Tue 8/14/18 Tue 8/14/18
2.2 Review of Plan 2 days Wed 8/15/18 Thu 8/16/18
2.3 Complete Plan Formation 5 days Fri 8/17/18 Thu 8/23/18
2.4 Plan Approval 0 days Thu 8/23/18 Thu 8/23/18
3 Design Phase 12 days Fri 8/24/18 Mon
9/10/18
3.1 Interface Design is developed 2 days Fri 8/24/18 Mon
8/27/18
3.2 Complete Design is formed 7 days Tue 8/28/18 Wed 9/5/18
3.3 Design Simulation 3 days Thu 9/6/18 Mon
9/10/18
3.4 Design Approved 0 days Mon 9/10/18 Mon
9/10/18
4 Execution 18 days Tue 9/11/18 Thu 10/4/18
4.1 Interface is formed 2 days Tue 9/11/18 Wed
9/12/18
4.2 Functions are aligned 3 days Thu 9/13/18 Mon
9/17/18
4.3 Programming is done 6 days Tue 9/18/18 Tue 9/25/18
4.4 Functions are defined 3 days Wed 9/26/18 Fri 9/28/18
4.5 System is developed 4 days Mon 10/1/18 Thu 10/4/18
4.6 System Approved 0 days Thu 10/4/18 Thu 10/4/18
5 Closure 6 days Fri 10/5/18 Fri 10/12/18
5.1 Final documents are made 3 days Fri 10/5/18 Tue 10/9/18
5.2 Inspection of the system 2 days Wed
10/10/18
Thu
10/11/18
5.3 Sign off 1 day Fri 10/12/18 Fri 10/12/18
2.1 Outline of the Plan 1 day Tue 8/14/18 Tue 8/14/18
2.2 Review of Plan 2 days Wed 8/15/18 Thu 8/16/18
2.3 Complete Plan Formation 5 days Fri 8/17/18 Thu 8/23/18
2.4 Plan Approval 0 days Thu 8/23/18 Thu 8/23/18
3 Design Phase 12 days Fri 8/24/18 Mon
9/10/18
3.1 Interface Design is developed 2 days Fri 8/24/18 Mon
8/27/18
3.2 Complete Design is formed 7 days Tue 8/28/18 Wed 9/5/18
3.3 Design Simulation 3 days Thu 9/6/18 Mon
9/10/18
3.4 Design Approved 0 days Mon 9/10/18 Mon
9/10/18
4 Execution 18 days Tue 9/11/18 Thu 10/4/18
4.1 Interface is formed 2 days Tue 9/11/18 Wed
9/12/18
4.2 Functions are aligned 3 days Thu 9/13/18 Mon
9/17/18
4.3 Programming is done 6 days Tue 9/18/18 Tue 9/25/18
4.4 Functions are defined 3 days Wed 9/26/18 Fri 9/28/18
4.5 System is developed 4 days Mon 10/1/18 Thu 10/4/18
4.6 System Approved 0 days Thu 10/4/18 Thu 10/4/18
5 Closure 6 days Fri 10/5/18 Fri 10/12/18
5.1 Final documents are made 3 days Fri 10/5/18 Tue 10/9/18
5.2 Inspection of the system 2 days Wed
10/10/18
Thu
10/11/18
5.3 Sign off 1 day Fri 10/12/18 Fri 10/12/18

11PROJECT PROPOSAL
5.4 Project Closed 0 days Fri 10/12/18 Fri 10/12/18
The project schedule has been developed using the Ms-Project software for aligning the
simplification of the improved communication and formation. The complete project can be
shown in the following Gantt chart diagram,
5.4 Project Closed 0 days Fri 10/12/18 Fri 10/12/18
The project schedule has been developed using the Ms-Project software for aligning the
simplification of the improved communication and formation. The complete project can be
shown in the following Gantt chart diagram,
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.