Feasibility, Communication, and Risk in IS Project Execution
VerifiedAdded on 2020/07/23
|9
|2378
|43
Report
AI Summary
This report provides a comprehensive overview of IS project execution, emphasizing the importance of feasibility studies, project communication management, and risk control. It delves into various types of feasibility studies, including particular, fiscal, legal, and operational feasibility, highlighting their significance in project success. The report then explores the critical role of project communication management, discussing effective strategies and tools like email, daily stand-ups, and project announcement meetings. It also examines methods for project schedule management, such as task lists, Gantt charts, calendars, and the Critical Path Method (CPM). Finally, the report outlines techniques for controlling potential risks, including change and trend analysis, technical performance measurement, and the use of contingency and management reserves. The report concludes by summarizing key takeaways, emphasizing that successful project execution requires effective knowledge, skills, and a proactive approach to planning and risk mitigation.

Project Execution and
Quality Control
Quality Control
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION...........................................................................................................................3
CONCLUSION................................................................................................................................8
REFERENCES................................................................................................................................9
INTRODUCTION...........................................................................................................................3
CONCLUSION................................................................................................................................8
REFERENCES................................................................................................................................9

INTRODUCTION
Project execution is a critical activity which requires effective knowledge and skills to
perform successfully. This report will focus on the importance of various types of feasibility
studies for IS projects and the importance of project communication management for the same.
The report will also identify effective methods and tools for project schedule management, the
use of methods to control potential risks on specific IS projects will be also illustrated I the
present report.
Particular Feasibility - this assessment bases on the specific resources open to the
affiliation. It empowers relationship to choose if the specific resources meet the farthest
point and whether the particular gathering is prepared for changing over the
considerations into working systems (Harris, Harris, Carlson and Carlson,2015). Specific
credibility similarly incorporates appraisal of the gear, programming, and other
advancement requirements of the proposed system. As an exaggerated outline, an
affiliation wouldn't want to try to put Star Trek's transporters in their building—directly,
this endeavor isn't in reality feasible.
Fiscal Feasibility - this evaluation regularly incorporates a cost/benefits examination of
the endeavor, helping affiliations choose the sensibility, cost, and points of interest
related with an errand before cash related resources are appropriated. It in like manner
fills in as a free errand examination and enhances wander acceptability—helping pioneers
choose the positive budgetary favorable circumstances to the affiliation that the proposed
undertaking will give.
Real Feasibility - this assessment investigates whether any piece of the proposed wander
conflicts with legal essentials like zoning laws, data security acts, or online person to
person communication laws. Assume an affiliation needs to build up another office
working in a specific region (Kerzner and Kerzner 2017) A plausibility study may reveal
the affiliation's ideal zone isn't zoned for that kind of business. That affiliation has as of
late saved huge time and effort by finding that their endeavor was not functional perfect
from the most punctual beginning stage.
Operational Feasibility - this assessment incorporates undertaking an examination to
analyze and choose if—and how well—the affiliation's needs can be met by completing
the errand. Operational feasibility considers in like manner explore how an organisation
3
Project execution is a critical activity which requires effective knowledge and skills to
perform successfully. This report will focus on the importance of various types of feasibility
studies for IS projects and the importance of project communication management for the same.
The report will also identify effective methods and tools for project schedule management, the
use of methods to control potential risks on specific IS projects will be also illustrated I the
present report.
Particular Feasibility - this assessment bases on the specific resources open to the
affiliation. It empowers relationship to choose if the specific resources meet the farthest
point and whether the particular gathering is prepared for changing over the
considerations into working systems (Harris, Harris, Carlson and Carlson,2015). Specific
credibility similarly incorporates appraisal of the gear, programming, and other
advancement requirements of the proposed system. As an exaggerated outline, an
affiliation wouldn't want to try to put Star Trek's transporters in their building—directly,
this endeavor isn't in reality feasible.
Fiscal Feasibility - this evaluation regularly incorporates a cost/benefits examination of
the endeavor, helping affiliations choose the sensibility, cost, and points of interest
related with an errand before cash related resources are appropriated. It in like manner
fills in as a free errand examination and enhances wander acceptability—helping pioneers
choose the positive budgetary favorable circumstances to the affiliation that the proposed
undertaking will give.
Real Feasibility - this assessment investigates whether any piece of the proposed wander
conflicts with legal essentials like zoning laws, data security acts, or online person to
person communication laws. Assume an affiliation needs to build up another office
working in a specific region (Kerzner and Kerzner 2017) A plausibility study may reveal
the affiliation's ideal zone isn't zoned for that kind of business. That affiliation has as of
late saved huge time and effort by finding that their endeavor was not functional perfect
from the most punctual beginning stage.
Operational Feasibility - this assessment incorporates undertaking an examination to
analyze and choose if—and how well—the affiliation's needs can be met by completing
the errand. Operational feasibility considers in like manner explore how an organisation
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

configuration satisfies the necessities recognized in the requirements' examination time of
structure change.
Points of interest of Conducting a Feasibility Study
The importance of a feasibility consider relies upon definitive need to "put everything in order"
before presenting resources, time, or spending design. A plausibility study may uncover new
contemplation that could thoroughly change an errand's augmentation (Mubarak, 2015). It's best
to make these judgments early, rather than bounce in and finding that the errand just won't work.
Driving a common sense consider is continually important to the assignment as it gives you and
diverse accomplices an unmistakable photograph of the proposed wander.
1. The accompanying are some key preferences of coordinating a credibility consider:
2. Improves wander gatherings' center intrigue
3. Perceives new openings
4. Gives essential information to a "go/no-go" decision
5. Stream the business choices
6. Perceives a significant inspiration to grasp the organization.
7. Redesigns the accomplishment rate by evaluating various parameters
8. Helps fundamental authority on the errand
9. Recognizes reasons not to proceed
Significance of Project communication management in IS Projects
In Project management communication assumes a crucial part, it is one of the comer
stones of cooperation and significantly contribute towards the accomplishment of the task. As a
Project director see that the communication between the general population associated with any
undertakings have proceeds with stream without interferences and it includes every one of the
members (Schermerhorn, and et.al., 2014). Associations could utilize diverse strategies for
communication like email, Skype, every day fast refresh gatherings, week after week Project
announcement gatherings etc. Most of the associations pick their fundamental communication
channel as email. With different tasks running regularly monitoring the applicable
communication relating to the activities a specific asset is included ends up troublesome as it
might lose inside all other clamor. On the off chance that the included assets are working from
various areas the trouble of communication will additionally increment. A portion of the vital
focuses that should be tended to with regards to communication inside Projects
4
structure change.
Points of interest of Conducting a Feasibility Study
The importance of a feasibility consider relies upon definitive need to "put everything in order"
before presenting resources, time, or spending design. A plausibility study may uncover new
contemplation that could thoroughly change an errand's augmentation (Mubarak, 2015). It's best
to make these judgments early, rather than bounce in and finding that the errand just won't work.
Driving a common sense consider is continually important to the assignment as it gives you and
diverse accomplices an unmistakable photograph of the proposed wander.
1. The accompanying are some key preferences of coordinating a credibility consider:
2. Improves wander gatherings' center intrigue
3. Perceives new openings
4. Gives essential information to a "go/no-go" decision
5. Stream the business choices
6. Perceives a significant inspiration to grasp the organization.
7. Redesigns the accomplishment rate by evaluating various parameters
8. Helps fundamental authority on the errand
9. Recognizes reasons not to proceed
Significance of Project communication management in IS Projects
In Project management communication assumes a crucial part, it is one of the comer
stones of cooperation and significantly contribute towards the accomplishment of the task. As a
Project director see that the communication between the general population associated with any
undertakings have proceeds with stream without interferences and it includes every one of the
members (Schermerhorn, and et.al., 2014). Associations could utilize diverse strategies for
communication like email, Skype, every day fast refresh gatherings, week after week Project
announcement gatherings etc. Most of the associations pick their fundamental communication
channel as email. With different tasks running regularly monitoring the applicable
communication relating to the activities a specific asset is included ends up troublesome as it
might lose inside all other clamor. On the off chance that the included assets are working from
various areas the trouble of communication will additionally increment. A portion of the vital
focuses that should be tended to with regards to communication inside Projects
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

• how to keep the communication applicable to the undertaking you are working with?
• how various roads and mediums that are accessible for the members to convey?
• Does everybody should be available with a specific end goal to get the message?
• How to convey if the members are not in a room or in a similar area?
• How to monitor the communication and recover the data on a last stage?
• How to guarantee that every one of the members are gotten the message and set up
responsibility towards it?
With awesome accentuation on cooperation, Project Coordinator has some worked in
highlights that can help the clients in their communication and address diverse focuses specified
previously. Keeping in mind the end goal to expel the commotion from all other specialized
techniques and makes it important simply to the Projects, Project Coordinator accompanies its
own particular web based informing framework. With the hidden idea of Lobby and workspaces,
client access to various activities is controlled by the entrance rights (Colin and Vanhoucke
2014). Clients can choose whether they need to communicate something specific right through
the web based informing framework or send a warning about the message by means of email to
the beneficiary restricting it to these two mediums. Messages can be sent to singular clients or to
every one of the clients in a particular undertaking workspace. With the online access, clients can
send and get the messages whenever and from anyplace. With the messages are spared online
with every one of the points of interest whenever clients can track and check the old messages.
So as to guarantee the responsibility, extraordinary shading pointers are added to the messages
indicating diverse status when the beneficiary is perused the message.
Undertaking List
Of all the Project booking strategies, the errand list is no ifs ands or buts, the most
straightforward. This is a rundown of assignments for each colleague, recorded in a spreadsheet
or word processor. This strategy is straightforward and natural to the vast majority, and is
5
• how various roads and mediums that are accessible for the members to convey?
• Does everybody should be available with a specific end goal to get the message?
• How to convey if the members are not in a room or in a similar area?
• How to monitor the communication and recover the data on a last stage?
• How to guarantee that every one of the members are gotten the message and set up
responsibility towards it?
With awesome accentuation on cooperation, Project Coordinator has some worked in
highlights that can help the clients in their communication and address diverse focuses specified
previously. Keeping in mind the end goal to expel the commotion from all other specialized
techniques and makes it important simply to the Projects, Project Coordinator accompanies its
own particular web based informing framework. With the hidden idea of Lobby and workspaces,
client access to various activities is controlled by the entrance rights (Colin and Vanhoucke
2014). Clients can choose whether they need to communicate something specific right through
the web based informing framework or send a warning about the message by means of email to
the beneficiary restricting it to these two mediums. Messages can be sent to singular clients or to
every one of the clients in a particular undertaking workspace. With the online access, clients can
send and get the messages whenever and from anyplace. With the messages are spared online
with every one of the points of interest whenever clients can track and check the old messages.
So as to guarantee the responsibility, extraordinary shading pointers are added to the messages
indicating diverse status when the beneficiary is perused the message.
Undertaking List
Of all the Project booking strategies, the errand list is no ifs ands or buts, the most
straightforward. This is a rundown of assignments for each colleague, recorded in a spreadsheet
or word processor. This strategy is straightforward and natural to the vast majority, and is
5

particularly helpful for littler Projects; in any case, for substantial activities with various errands,
conditions and assets, an undertaking list isn't attainable for having a general view and following
the task. On the off chance that the spreadsheet isn't online, there are outrageous restrictions with
regards to working together and remarking on the record (Heagney, 2016). There is additionally
no forming offered, which prompts botches, loss of efficiency brings about copy duplicates and
distinctive variants of a similar report. It's likewise close difficult to track the advance of the
undertaking, since the spreadsheet isn't a piece of a greater framework and everything should be
refreshes physically.
Gantt Chart
The Project plan Gantt outline is a valuable representation strategy for advance following
and revealing purposes. It's the go-to device for most Project Managers when they need to get a
speedy gauge of the time it will take to finish all the Project exercises (Lindgren, Lindner,
Pereira and Pinho, 2015). A task plan Gantt outline is a bar graph that presentations enter
exercises in succession on the left (first action is at the upper left and last movement closes in the
base right corner) versus time (on the best or base). Each undertaking is spoken to by a bar that
mirrors the begin and date of the movement, and thusly its term. The diagram demonstrates
every one of the exercises, when they're set to begin and end, to what extent every movement
will last, where there are covers of exercises, conditions between exercises, which are associated
with bolts and the begin/end date of the whole Project.
Calendar
In many date-books, there's a choice to make diverse logbooks with their own particular
one of a kind names. For this situation, you can make one date-book per Project and calendar
occasions for that undertaking (Gyulai, Pfeiffer, Kádár and Monostori, 2016). The logbook
demonstrates a timetable for the whole undertaking. The other incredible thing is that date-books
are shareable, so you can add your colleagues to them also. While this is an awesome approach
for survey every one of the errands and seeing where they may cover, it has certain impediments;
you can't dole out undertakings to specific individuals and you can't see assignment conditions.
CPM-THE CRITICAL PATH METHOD
6
conditions and assets, an undertaking list isn't attainable for having a general view and following
the task. On the off chance that the spreadsheet isn't online, there are outrageous restrictions with
regards to working together and remarking on the record (Heagney, 2016). There is additionally
no forming offered, which prompts botches, loss of efficiency brings about copy duplicates and
distinctive variants of a similar report. It's likewise close difficult to track the advance of the
undertaking, since the spreadsheet isn't a piece of a greater framework and everything should be
refreshes physically.
Gantt Chart
The Project plan Gantt outline is a valuable representation strategy for advance following
and revealing purposes. It's the go-to device for most Project Managers when they need to get a
speedy gauge of the time it will take to finish all the Project exercises (Lindgren, Lindner,
Pereira and Pinho, 2015). A task plan Gantt outline is a bar graph that presentations enter
exercises in succession on the left (first action is at the upper left and last movement closes in the
base right corner) versus time (on the best or base). Each undertaking is spoken to by a bar that
mirrors the begin and date of the movement, and thusly its term. The diagram demonstrates
every one of the exercises, when they're set to begin and end, to what extent every movement
will last, where there are covers of exercises, conditions between exercises, which are associated
with bolts and the begin/end date of the whole Project.
Calendar
In many date-books, there's a choice to make diverse logbooks with their own particular
one of a kind names. For this situation, you can make one date-book per Project and calendar
occasions for that undertaking (Gyulai, Pfeiffer, Kádár and Monostori, 2016). The logbook
demonstrates a timetable for the whole undertaking. The other incredible thing is that date-books
are shareable, so you can add your colleagues to them also. While this is an awesome approach
for survey every one of the errands and seeing where they may cover, it has certain impediments;
you can't dole out undertakings to specific individuals and you can't see assignment conditions.
CPM-THE CRITICAL PATH METHOD
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Sinnaps Gantt-stream is a modernized and refreshed rendition of the conventional Gantt Chart
for the previously mentioned reason and furthermore for the reality the it incorporates a Project's
basic way. The vertical request of exercises in the Gantt stream characterizes the criticality of a
specific action. Utilizing the CPM apparatus, groups can comprehend the criticality of each
errand by the stature at which it is set. To ascertain the basic way, Sinnaps thinks about the
length, conditions between all exercises, and date imperatives that you could have characterized
in the arranging. Present day programming incorporates Project observing instruments and
systems. In the Sinnaps application, it is anything but difficult to distinguish the Project's basic
way. There is a best line in the exercises painted over that says, 'basic way' so you can see your
Project's basic way easily.
Techniques for controlling IS projects
Change and pattern investigation
Likewise with numerous control forms, we now search for changes between the timetable
and cost baselines and the real outcomes. When we the differences are expanding, there is
expanded vulnerability and hazard. Watch the patterns and react before the circumstance escapes
hand.
Specialized execution estimation
Envision that you are chipping away at a product improvement Project and that the
utilitarian prerequisites have been created. You've wanted to convey capacities at a point in time
—toward the finish of the fourth dash, toward the finish of stage 1, or a development. The
specialized execution estimation is an estimation of the specialized achievements (Fuller,
Valacich, George, and Schneider, 2017).
Hold investigation
Amid the cost arranging, the possibility and management holds are added to the Project spending
plan as required. As dangers happen, the stores may diminish. Contingent upon how your
association handles holds and your hazard management design, Project administrators may ask
for more saves when lacking.
Gatherings
Project administrators ought to be think chance chiefs. Connect with your colleagues and suitable
partners in gatherings to encourage the hazard management forms. For these gatherings, make
certain to:
• Distribute a motivation with an unmistakably expressed reason
• Invite the fitting colleagues and partners
• Use fitting devices and methods
• Distribute meeting minutes containing choices, activity things, issues, and dangers
7
for the previously mentioned reason and furthermore for the reality the it incorporates a Project's
basic way. The vertical request of exercises in the Gantt stream characterizes the criticality of a
specific action. Utilizing the CPM apparatus, groups can comprehend the criticality of each
errand by the stature at which it is set. To ascertain the basic way, Sinnaps thinks about the
length, conditions between all exercises, and date imperatives that you could have characterized
in the arranging. Present day programming incorporates Project observing instruments and
systems. In the Sinnaps application, it is anything but difficult to distinguish the Project's basic
way. There is a best line in the exercises painted over that says, 'basic way' so you can see your
Project's basic way easily.
Techniques for controlling IS projects
Change and pattern investigation
Likewise with numerous control forms, we now search for changes between the timetable
and cost baselines and the real outcomes. When we the differences are expanding, there is
expanded vulnerability and hazard. Watch the patterns and react before the circumstance escapes
hand.
Specialized execution estimation
Envision that you are chipping away at a product improvement Project and that the
utilitarian prerequisites have been created. You've wanted to convey capacities at a point in time
—toward the finish of the fourth dash, toward the finish of stage 1, or a development. The
specialized execution estimation is an estimation of the specialized achievements (Fuller,
Valacich, George, and Schneider, 2017).
Hold investigation
Amid the cost arranging, the possibility and management holds are added to the Project spending
plan as required. As dangers happen, the stores may diminish. Contingent upon how your
association handles holds and your hazard management design, Project administrators may ask
for more saves when lacking.
Gatherings
Project administrators ought to be think chance chiefs. Connect with your colleagues and suitable
partners in gatherings to encourage the hazard management forms. For these gatherings, make
certain to:
• Distribute a motivation with an unmistakably expressed reason
• Invite the fitting colleagues and partners
• Use fitting devices and methods
• Distribute meeting minutes containing choices, activity things, issues, and dangers
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

CONCLUSION
From this report it has been summarized that Project execution is a critical activity which
requires effective knowledge and skills to perform successfully. The importance of a feasibility
consider relies upon definitive need to "put everything in order" before presenting resources,
time, or spending design. A plausibility study may uncover new contemplation that could
thoroughly change an errand's augmentation. A task plan Gantt outline is a bar graph that
presentations enter exercises in succession on the left
8
From this report it has been summarized that Project execution is a critical activity which
requires effective knowledge and skills to perform successfully. The importance of a feasibility
consider relies upon definitive need to "put everything in order" before presenting resources,
time, or spending design. A plausibility study may uncover new contemplation that could
thoroughly change an errand's augmentation. A task plan Gantt outline is a bar graph that
presentations enter exercises in succession on the left
8

REFERENCES
Books and journals
Fuller, M.A., Valacich, J.S., George, J.F. and Schneider, C., 2017. Information Systems Project
Management: A Process and Team Approach, Edition 1.1. Prospect Press.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Mubarak, S.A., 2015. Construction project scheduling and control. John Wiley & Sons.
Colin, J. and Vanhoucke, M., 2014. Setting tolerance limits for statistical project control using
earned value management.Omega, 49, pp.107-122.
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Lindgren, P., Lindner, M., Pereira, D. and Pinho, L.M., 2015, August. A Formal Perspective on
IEC 61499 Execution Control Chart Semantics. In Trustcom/BigDataSE/ISPA, 2015
IEEE (Vol. 3, pp. 293-300). IEEE.
Dyer, T., Kass, A. and Mehta, M., Accenture Global Solutions Ltd, 2017. Dynamic Process
Execution Architecture With Disassociated Resource Control. U.S. Patent Application
15/435,690.
Gyulai, D., Pfeiffer, A., Kádár, B. and Monostori, L., 2016. Simulation-based production
planning and execution control for reconfigurable assembly cells. Procedia CIRP, 57,
pp.445-450.
Schermerhorn, J., and et.al., 2014. Management: Foundations and Applications (2nd Asia-Pacific
Edition). John Wiley & Sons.
Harris, K.J., Harris, R.B., Carlson, J.R. and Carlson, D.S., 2015. Resource loss from technology
overload and its impact on work-family conflict: Can leaders help?. Computers in Human
Behavior, 50, pp.411-417.
9
Books and journals
Fuller, M.A., Valacich, J.S., George, J.F. and Schneider, C., 2017. Information Systems Project
Management: A Process and Team Approach, Edition 1.1. Prospect Press.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Mubarak, S.A., 2015. Construction project scheduling and control. John Wiley & Sons.
Colin, J. and Vanhoucke, M., 2014. Setting tolerance limits for statistical project control using
earned value management.Omega, 49, pp.107-122.
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Lindgren, P., Lindner, M., Pereira, D. and Pinho, L.M., 2015, August. A Formal Perspective on
IEC 61499 Execution Control Chart Semantics. In Trustcom/BigDataSE/ISPA, 2015
IEEE (Vol. 3, pp. 293-300). IEEE.
Dyer, T., Kass, A. and Mehta, M., Accenture Global Solutions Ltd, 2017. Dynamic Process
Execution Architecture With Disassociated Resource Control. U.S. Patent Application
15/435,690.
Gyulai, D., Pfeiffer, A., Kádár, B. and Monostori, L., 2016. Simulation-based production
planning and execution control for reconfigurable assembly cells. Procedia CIRP, 57,
pp.445-450.
Schermerhorn, J., and et.al., 2014. Management: Foundations and Applications (2nd Asia-Pacific
Edition). John Wiley & Sons.
Harris, K.J., Harris, R.B., Carlson, J.R. and Carlson, D.S., 2015. Resource loss from technology
overload and its impact on work-family conflict: Can leaders help?. Computers in Human
Behavior, 50, pp.411-417.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 9
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.