This project charter report details the design of a Training and Apprenticeship program (TAHS) for Globex, aimed at providing high school students with valuable work experience and increasing their employment opportunities in the farming sector. The report encompasses several key sections, including the identification of Measurable Organizational Value (MOV), which outlines the project's impact on operational, strategic, customer, social, and financial aspects. It also defines the project's scope, including in-scope and out-of-scope items, deliverables, and a resource list. Furthermore, the report provides a Work Breakdown Structure (WBS) to organize tasks, a Gantt chart for timeline visualization, project assumptions, a risk identification framework, and a quality planning and management strategy. The project involves collaboration between schools, farming equipment manufacturers, and Globex representatives, necessitating the development of a computer-based system to manage the program effectively. The report provides a comprehensive overview of the project's planning, execution, and control aspects, ensuring a structured approach to achieving the program's objectives.

Running head: DESIGNING TAHS PROGRAM FOR GLOBEX
Designing TAHS Program for Globex
Name of the Student
Name of the University
Author note
Designing TAHS Program for Globex
Name of the Student
Name of the University
Author note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1DESIGNING TAHS PROGRAM FOR GLOBEX
Table of Contents
Part 1: Identification of Measurable Organizational Value (MOV)................................................3
1.1 Description and Brief Overview of the Project.....................................................................3
1.2 Desired Area of Impact..........................................................................................................3
1.3 Identified Project Value for TAHS........................................................................................4
1.4 Target and Expectation of Stakeholders................................................................................4
1.5 Timeline of MOV..................................................................................................................5
1.6 Summarization of MOV........................................................................................................5
Part 2: Scope of the Project.............................................................................................................6
2.1 The Scope Management Plan................................................................................................6
2.1.1 Requirements of the Project............................................................................................6
2.1.2 Out Scope and In Scope of Project.................................................................................6
2.1.3 Project Deliverables........................................................................................................7
2.1.4 Scope Verification Process.............................................................................................7
2.2 Resource List.........................................................................................................................8
Part 3: Work Breakdown Structure (WBS).....................................................................................9
3.1 The Work Breakdown Structure for TAHS Development....................................................9
3.2 Project Deliverables and Phase Milestones.........................................................................13
3.3 Project Gantt chart...............................................................................................................15
Table of Contents
Part 1: Identification of Measurable Organizational Value (MOV)................................................3
1.1 Description and Brief Overview of the Project.....................................................................3
1.2 Desired Area of Impact..........................................................................................................3
1.3 Identified Project Value for TAHS........................................................................................4
1.4 Target and Expectation of Stakeholders................................................................................4
1.5 Timeline of MOV..................................................................................................................5
1.6 Summarization of MOV........................................................................................................5
Part 2: Scope of the Project.............................................................................................................6
2.1 The Scope Management Plan................................................................................................6
2.1.1 Requirements of the Project............................................................................................6
2.1.2 Out Scope and In Scope of Project.................................................................................6
2.1.3 Project Deliverables........................................................................................................7
2.1.4 Scope Verification Process.............................................................................................7
2.2 Resource List.........................................................................................................................8
Part 3: Work Breakdown Structure (WBS).....................................................................................9
3.1 The Work Breakdown Structure for TAHS Development....................................................9
3.2 Project Deliverables and Phase Milestones.........................................................................13
3.3 Project Gantt chart...............................................................................................................15

2DESIGNING TAHS PROGRAM FOR GLOBEX
Part 4: Assumptions for Project.....................................................................................................16
4.1 Project Assumptions............................................................................................................16
4.2 Risk Identification Framework............................................................................................16
4.3 Risk Analysis and Mitigation Plan......................................................................................18
Part 5: Project quality planning and management.........................................................................20
5.1 Philosophy of Team.............................................................................................................20
5.2 Quality Assurance................................................................................................................20
5.2.1 Validation of Activity...................................................................................................20
5.2.2 Verification of Activity.................................................................................................20
Bibliography..................................................................................................................................21
Part 4: Assumptions for Project.....................................................................................................16
4.1 Project Assumptions............................................................................................................16
4.2 Risk Identification Framework............................................................................................16
4.3 Risk Analysis and Mitigation Plan......................................................................................18
Part 5: Project quality planning and management.........................................................................20
5.1 Philosophy of Team.............................................................................................................20
5.2 Quality Assurance................................................................................................................20
5.2.1 Validation of Activity...................................................................................................20
5.2.2 Verification of Activity.................................................................................................20
Bibliography..................................................................................................................................21
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3DESIGNING TAHS PROGRAM FOR GLOBEX
Part 1: Identification of Measurable Organizational Value (MOV)
1.1 Description and Brief Overview of the Project
The management team of Globex have planned for the starting of a Training and
Apprenticeship program that would be based for the High School Students. The training program
would mainly be intended for helping the high school students towards getting useful experience
within their work. The program would further be intended to increase the employment
opportunities for the students in the farming field. This demand has mainly been raised by the
farming specialists as they require highly skilled students in order to meet the demands of
farming.
Based on managing the TAHS program, the Globex team has proposed a plan for
designing an interactive computer-based system. The program would become a collaborative
work based on focusing over three entities, which includes farming, schools, manufacturers of
equipment and the own representatives of Globex. Hence, they have requested Virtucon to
manage the entire aspect of the project by covering every necessary aspect and delivering the
system within proper time.
1.2 Desired Area of Impact
Operational: TAHS computer-based system would incur high system functionality and
would perform the operations with accuracy.
Strategy: The TAHS system would manage the learning experience of students based on
gaining precision within the work experience in relation to farming.
Customer: The students would be highly affected from the application. However, the
manufacturers of equipment would not be affected with developing the computer-based system.
Part 1: Identification of Measurable Organizational Value (MOV)
1.1 Description and Brief Overview of the Project
The management team of Globex have planned for the starting of a Training and
Apprenticeship program that would be based for the High School Students. The training program
would mainly be intended for helping the high school students towards getting useful experience
within their work. The program would further be intended to increase the employment
opportunities for the students in the farming field. This demand has mainly been raised by the
farming specialists as they require highly skilled students in order to meet the demands of
farming.
Based on managing the TAHS program, the Globex team has proposed a plan for
designing an interactive computer-based system. The program would become a collaborative
work based on focusing over three entities, which includes farming, schools, manufacturers of
equipment and the own representatives of Globex. Hence, they have requested Virtucon to
manage the entire aspect of the project by covering every necessary aspect and delivering the
system within proper time.
1.2 Desired Area of Impact
Operational: TAHS computer-based system would incur high system functionality and
would perform the operations with accuracy.
Strategy: The TAHS system would manage the learning experience of students based on
gaining precision within the work experience in relation to farming.
Customer: The students would be highly affected from the application. However, the
manufacturers of equipment would not be affected with developing the computer-based system.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4DESIGNING TAHS PROGRAM FOR GLOBEX
Social: The TAHS system would assist the students and the representatives of Globex to
manage the training programs and increase employment opportunities.
Financial: The development of computer-based system would increase the financial
stability of the company.
1.3 Identified Project Value for TAHS
Value of
Project
Area of
Impact
Best (Range
of 1 to 3)
Fast (Range of
1 to 3)
Cheap (Range
of 1 to 3)
Do More (Range
of 1 to 3)
Operational 1 3 2 1
Strategy 3 2 1 3
Customer 3 1 2 2
Social 2 3 3 3
Financial 1 2 2 1
1.4 Target and Expectation of Stakeholders
Stakeholders of
Project
Expectations from project Target for the Project
(Improvement Needs)
Virtucon Understanding the requirements from Globex
and successful management of project
High
Globex Corporation A fully developed computer system based on
developing the training program
High
Development Team Delivering a high quality of project output High
Schools High rate of employment opportunities of their
students
Medium
Social: The TAHS system would assist the students and the representatives of Globex to
manage the training programs and increase employment opportunities.
Financial: The development of computer-based system would increase the financial
stability of the company.
1.3 Identified Project Value for TAHS
Value of
Project
Area of
Impact
Best (Range
of 1 to 3)
Fast (Range of
1 to 3)
Cheap (Range
of 1 to 3)
Do More (Range
of 1 to 3)
Operational 1 3 2 1
Strategy 3 2 1 3
Customer 3 1 2 2
Social 2 3 3 3
Financial 1 2 2 1
1.4 Target and Expectation of Stakeholders
Stakeholders of
Project
Expectations from project Target for the Project
(Improvement Needs)
Virtucon Understanding the requirements from Globex
and successful management of project
High
Globex Corporation A fully developed computer system based on
developing the training program
High
Development Team Delivering a high quality of project output High
Schools High rate of employment opportunities of their
students
Medium

5DESIGNING TAHS PROGRAM FOR GLOBEX
1.5 Timeline of MOV
Task Name Duration Start Finish
Development of Computer-based System 154 days Mon 26-08-19 Thu 26-03-20
Start Project 0 days Mon 26-08-19 Mon 26-08-19
Project Initiation and Planning 9 days Mon 26-08-19 Thu 05-09-19
Evaluating the Requirements of Globex 11 days Fri 06-09-19 Fri 20-09-19
Technical Designing Phase of the
Computer-based system 19 days Mon 23-09-19 Thu 17-10-19
Development of the project 60 days Fri 18-10-19 Thu 09-01-20
Testing over the project 39 days Fri 10-01-20 Wed 04-03-20
Quality Assurance and Deployment 5 days Thu 05-03-20 Wed 11-03-20
Documentation of the System 11 days Thu 12-03-20 Thu 26-03-20
End Project 0 days Thu 26-03-20 Thu 26-03-20
1.6 Summarization of MOV
Serial
No
MOV Description
1 Explanation of Project Defining deliverables and aim for the
development of a computer-based system to
initiate the TAHS
2 Desired Impact Area Identification of Business Strategy, Customer,
Operational, Financial and Social impacts made
over the project.
3 Value of Project Maintain high form of business performance and
lower budgets for the computer-based system.
4 Expectations and dedicated
Target for Stakeholders
Development of expectation from stakeholders
and increase of system efficiency
5 MOV Timeframe 154 days
1.5 Timeline of MOV
Task Name Duration Start Finish
Development of Computer-based System 154 days Mon 26-08-19 Thu 26-03-20
Start Project 0 days Mon 26-08-19 Mon 26-08-19
Project Initiation and Planning 9 days Mon 26-08-19 Thu 05-09-19
Evaluating the Requirements of Globex 11 days Fri 06-09-19 Fri 20-09-19
Technical Designing Phase of the
Computer-based system 19 days Mon 23-09-19 Thu 17-10-19
Development of the project 60 days Fri 18-10-19 Thu 09-01-20
Testing over the project 39 days Fri 10-01-20 Wed 04-03-20
Quality Assurance and Deployment 5 days Thu 05-03-20 Wed 11-03-20
Documentation of the System 11 days Thu 12-03-20 Thu 26-03-20
End Project 0 days Thu 26-03-20 Thu 26-03-20
1.6 Summarization of MOV
Serial
No
MOV Description
1 Explanation of Project Defining deliverables and aim for the
development of a computer-based system to
initiate the TAHS
2 Desired Impact Area Identification of Business Strategy, Customer,
Operational, Financial and Social impacts made
over the project.
3 Value of Project Maintain high form of business performance and
lower budgets for the computer-based system.
4 Expectations and dedicated
Target for Stakeholders
Development of expectation from stakeholders
and increase of system efficiency
5 MOV Timeframe 154 days
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6DESIGNING TAHS PROGRAM FOR GLOBEX
Part 2: Scope of the Project
2.1 The Scope Management Plan
2.1.1 Requirements of the Project
The requirements for the project based on developing the computer system are discussed
as follows:
1. The TAHS system that would be defined for Globex should be highly cost efficient
and should be prepared within the estimated budget.
2. The quality of the software system should have a high kind of system performance.
3. The functionality of the software system should be highly functional in nature.
4. There should be an effective form of system coordination within the included
functionalities within the system.
2.1.2 Out Scope and In Scope of Project
In Scope for Project
ï‚· To manage the efficiency of managing the training program for TAHS
ï‚· To manage the different project management aspects based on development of the TAHS
system
ï‚· To develop system based on allocation of proper kind of time and budget estimates
Out Scope for Project
ï‚· Inclusion of training approaches for the Globex employees
ï‚· Installing of the TAHS application at each of the computers within the laboratories
Part 2: Scope of the Project
2.1 The Scope Management Plan
2.1.1 Requirements of the Project
The requirements for the project based on developing the computer system are discussed
as follows:
1. The TAHS system that would be defined for Globex should be highly cost efficient
and should be prepared within the estimated budget.
2. The quality of the software system should have a high kind of system performance.
3. The functionality of the software system should be highly functional in nature.
4. There should be an effective form of system coordination within the included
functionalities within the system.
2.1.2 Out Scope and In Scope of Project
In Scope for Project
ï‚· To manage the efficiency of managing the training program for TAHS
ï‚· To manage the different project management aspects based on development of the TAHS
system
ï‚· To develop system based on allocation of proper kind of time and budget estimates
Out Scope for Project
ï‚· Inclusion of training approaches for the Globex employees
ï‚· Installing of the TAHS application at each of the computers within the laboratories
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7DESIGNING TAHS PROGRAM FOR GLOBEX
ï‚· To save the records of students and teachers who would participate in the training
program
2.1.3 Project Deliverables
Outline
Number Task Name
0 Development of Computer-based System
1 Start Project
2 Project Initiation and Planning
3 Evaluating the Requirements of Globex
4 Technical Designing Phase of the Computer-based system
5 Development of the project
6 Testing over the project
7 Quality Assurance and Deployment
8 Documentation of the System
9 End Project
2.1.4 Scope Verification Process
In the process of verification of scope, the teachers who would be participating in the
training program should abide with the work breakdown structure and cost estimates that have
been defined within the business case.
ï‚· To save the records of students and teachers who would participate in the training
program
2.1.3 Project Deliverables
Outline
Number Task Name
0 Development of Computer-based System
1 Start Project
2 Project Initiation and Planning
3 Evaluating the Requirements of Globex
4 Technical Designing Phase of the Computer-based system
5 Development of the project
6 Testing over the project
7 Quality Assurance and Deployment
8 Documentation of the System
9 End Project
2.1.4 Scope Verification Process
In the process of verification of scope, the teachers who would be participating in the
training program should abide with the work breakdown structure and cost estimates that have
been defined within the business case.

8DESIGNING TAHS PROGRAM FOR GLOBEX
2.2 Resource List
Resource Name Type Max. Units Std. Rate
Business Analyst Work 100% $120.00/hr
Designing Team Work 100% $100.00/hr
Development Team Work 100% $80.00/hr
System Tester Work 100% $70.00/hr
Globex Employees Work 100% $95.00/hr
Project Manager Work 100% $150.00/hr
Project Sponsor Work 100% $110.00/hr
Quality Analyst Work 100% $90.00/hr
Subject Matter Experts Work 100% $50.00/hr
Hardware Material $4,000.00
2.2 Resource List
Resource Name Type Max. Units Std. Rate
Business Analyst Work 100% $120.00/hr
Designing Team Work 100% $100.00/hr
Development Team Work 100% $80.00/hr
System Tester Work 100% $70.00/hr
Globex Employees Work 100% $95.00/hr
Project Manager Work 100% $150.00/hr
Project Sponsor Work 100% $110.00/hr
Quality Analyst Work 100% $90.00/hr
Subject Matter Experts Work 100% $50.00/hr
Hardware Material $4,000.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9DESIGNING TAHS PROGRAM FOR GLOBEX
Part 3: Work Breakdown Structure (WBS)
3.1 The Work Breakdown Structure for TAHS Development
Outline
Number Task Name Duration Start Finish Predecessors Resource Names Cost
0 Development of Computer-
based System 154 days Mon 26-08-19 Thu 26-03-20 $168,240.00
1 Start Project 0 days Mon 26-08-19 Mon 26-08-19 $0.00
2 Project Initiation and
Planning 9 days Mon 26-08-19 Thu 05-09-19 $23,600.00
2.1 Meeting with Globex
team 4 days Mon 26-08-19 Thu 29-08-19 1
Business
Analyst ,Designing
Team,Development
Team,Project
Manager ,Project
Sponsor
$17,920.00
2.2 Explaining the business
requirements 4 days Fri 30-08-19 Wed 04-09-19 3 Business Analyst $3,840.00
2.3 Development of a
technical solution 1 day Thu 05-09-19 Thu 05-09-19 4
Development
Team,Project
Manager
$1,840.00
3 Evaluating the
Requirements of Globex 11 days Fri 06-09-19 Fri 20-09-19 $12,240.00
3.1 Preparing a project plan 6 days Fri 06-09-19 Fri 13-09-19 5 Project Manager $7,200.00
3.2 Defining stakeholder list 2 days Mon 16-09-19 Tue 17-09-19 7 Project Manager $2,400.00
Part 3: Work Breakdown Structure (WBS)
3.1 The Work Breakdown Structure for TAHS Development
Outline
Number Task Name Duration Start Finish Predecessors Resource Names Cost
0 Development of Computer-
based System 154 days Mon 26-08-19 Thu 26-03-20 $168,240.00
1 Start Project 0 days Mon 26-08-19 Mon 26-08-19 $0.00
2 Project Initiation and
Planning 9 days Mon 26-08-19 Thu 05-09-19 $23,600.00
2.1 Meeting with Globex
team 4 days Mon 26-08-19 Thu 29-08-19 1
Business
Analyst ,Designing
Team,Development
Team,Project
Manager ,Project
Sponsor
$17,920.00
2.2 Explaining the business
requirements 4 days Fri 30-08-19 Wed 04-09-19 3 Business Analyst $3,840.00
2.3 Development of a
technical solution 1 day Thu 05-09-19 Thu 05-09-19 4
Development
Team,Project
Manager
$1,840.00
3 Evaluating the
Requirements of Globex 11 days Fri 06-09-19 Fri 20-09-19 $12,240.00
3.1 Preparing a project plan 6 days Fri 06-09-19 Fri 13-09-19 5 Project Manager $7,200.00
3.2 Defining stakeholder list 2 days Mon 16-09-19 Tue 17-09-19 7 Project Manager $2,400.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

10DESIGNING TAHS PROGRAM FOR GLOBEX
3.3 Preparing a financial plan 3 days Wed 18-09-19 Fri 20-09-19 8 Project Sponsor $2,640.00
3.4 Approval of project and
financial plan 0 days Fri 20-09-19 Fri 20-09-19 9 $0.00
4
Technical Designing
Phase of the Computer-
based system
19 days Mon 23-09-19 Thu 17-10-19 $27,040.00
4.1 Preparing a technical plan 10 days Mon 23-09-19 Fri 04-10-19 10
Designing
Team,Development
Team
$14,400.00
4.2 Approval over technical
plan 0 days Fri 04-10-19 Fri 04-10-19 12 $0.00
4.3 Hiring of software
engineers and testers 9 days Mon 07-10-19 Thu 17-10-19 12
Business
Analyst ,Hardware[1
]
$12,640.00
4.4 Signing of contract for
the project 0 days Thu 17-10-19 Thu 17-10-19 13,14 $0.00
5 Development of the
project 60 days Fri 18-10-19 Thu 09-01-20 $74,400.00
5.1 Preparing the coding for
the system 45 days Fri 18-10-19 Thu 19-12-19 15 Development Team $28,800.00
5.2 Preparing the designs for
the system interface 30 days Fri 18-10-19 Thu 28-11-19 15 Designing Team $24,000.00
5.3 Enhancing the system
functionality
15 days Fri 20-12-19 Thu 09-01-20 18,17 Designing
Team,Development
$21,600.00
3.3 Preparing a financial plan 3 days Wed 18-09-19 Fri 20-09-19 8 Project Sponsor $2,640.00
3.4 Approval of project and
financial plan 0 days Fri 20-09-19 Fri 20-09-19 9 $0.00
4
Technical Designing
Phase of the Computer-
based system
19 days Mon 23-09-19 Thu 17-10-19 $27,040.00
4.1 Preparing a technical plan 10 days Mon 23-09-19 Fri 04-10-19 10
Designing
Team,Development
Team
$14,400.00
4.2 Approval over technical
plan 0 days Fri 04-10-19 Fri 04-10-19 12 $0.00
4.3 Hiring of software
engineers and testers 9 days Mon 07-10-19 Thu 17-10-19 12
Business
Analyst ,Hardware[1
]
$12,640.00
4.4 Signing of contract for
the project 0 days Thu 17-10-19 Thu 17-10-19 13,14 $0.00
5 Development of the
project 60 days Fri 18-10-19 Thu 09-01-20 $74,400.00
5.1 Preparing the coding for
the system 45 days Fri 18-10-19 Thu 19-12-19 15 Development Team $28,800.00
5.2 Preparing the designs for
the system interface 30 days Fri 18-10-19 Thu 28-11-19 15 Designing Team $24,000.00
5.3 Enhancing the system
functionality
15 days Fri 20-12-19 Thu 09-01-20 18,17 Designing
Team,Development
$21,600.00

11DESIGNING TAHS PROGRAM FOR GLOBEX
Team
6 Testing over the project 39 days Fri 10-01-20 Wed 04-03-20 $21,840.00
6.1 Preparing a test plan 5 days Fri 10-01-20 Thu 16-01-20 19 System Tester $2,800.00
6.2 Performing unit testing 14 days Fri 17-01-20 Wed 05-02-20 21 System Tester $7,840.00
6.3 Integration testing 9 days Thu 06-02-20 Tue 18-02-20 22 System Tester $5,040.00
6.4 System testing 5 days Wed 19-02-20 Tue 25-02-20 23 System Tester $2,800.00
6.5 Acceptance testing 6 days Wed 26-02-20 Wed 04-03-20 24 System Tester $3,360.00
7 Quality Assurance and
Deployment 5 days Thu 05-03-20 Wed 11-03-20 $3,600.00
7.1 Ensuring proper quality
standards 5 days Thu 05-03-20 Wed 11-03-20 25 Quality Analyst $3,600.00
7.2 Approval for the quality
aspects of the project 0 days Wed 11-03-20 Wed 11-03-20 27 $0.00
8 Documentation of the
System 11 days Thu 12-03-20 Thu 26-03-20 $5,520.00
8.1 Documentation of the
project 9 days Thu 12-03-20 Tue 24-03-20 28 Subject Matter
Experts $3,600.00
8.2 Paying off to stakeholders 2 days Wed 25-03-20 Thu 26-03-20 30 Business Analyst $1,920.00
8.3 Project Sign Off 0 days Thu 26-03-20 Thu 26-03-20 31 $0.00
9 End Project 0 days Thu 26-03-20 Thu 26-03-20 32 $0.00
Team
6 Testing over the project 39 days Fri 10-01-20 Wed 04-03-20 $21,840.00
6.1 Preparing a test plan 5 days Fri 10-01-20 Thu 16-01-20 19 System Tester $2,800.00
6.2 Performing unit testing 14 days Fri 17-01-20 Wed 05-02-20 21 System Tester $7,840.00
6.3 Integration testing 9 days Thu 06-02-20 Tue 18-02-20 22 System Tester $5,040.00
6.4 System testing 5 days Wed 19-02-20 Tue 25-02-20 23 System Tester $2,800.00
6.5 Acceptance testing 6 days Wed 26-02-20 Wed 04-03-20 24 System Tester $3,360.00
7 Quality Assurance and
Deployment 5 days Thu 05-03-20 Wed 11-03-20 $3,600.00
7.1 Ensuring proper quality
standards 5 days Thu 05-03-20 Wed 11-03-20 25 Quality Analyst $3,600.00
7.2 Approval for the quality
aspects of the project 0 days Wed 11-03-20 Wed 11-03-20 27 $0.00
8 Documentation of the
System 11 days Thu 12-03-20 Thu 26-03-20 $5,520.00
8.1 Documentation of the
project 9 days Thu 12-03-20 Tue 24-03-20 28 Subject Matter
Experts $3,600.00
8.2 Paying off to stakeholders 2 days Wed 25-03-20 Thu 26-03-20 30 Business Analyst $1,920.00
8.3 Project Sign Off 0 days Thu 26-03-20 Thu 26-03-20 31 $0.00
9 End Project 0 days Thu 26-03-20 Thu 26-03-20 32 $0.00
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 23
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.