This report details a project management assignment focused on the construction of a university dining cafe. It begins by outlining the project's purpose, which is to address the lack of dining and recreational facilities on campus. The report defines the project scope, including the construction of a kitchen and dining area to serve approximately 500 students, while also specifying what is considered out of scope, such as external food vendors. It then describes the measures of success, such as student surveys to assess food quality and tracking student entry/exit times. Stakeholders are identified, along with communication methods for each, including meetings and emails. A communication process example, involving email correspondence with a project sponsor, is provided and evaluated. The report also reflects on change management, highlighting the benefits for students and suppliers. Finally, it includes a case reflection summarizing the project's key elements and emphasizing the importance of effective communication for success. The report adheres to the provided assignment brief and incorporates the various elements requested, such as project charter components, stakeholder identification, communication strategies, and a case reflection. This assignment is designed to provide practical experience in project management, including planning, stakeholder management, and communication.

Running head: PROJECT MANAGEMENT
Project Management
Name of the Student
Name of the University
Author’s Note
Project Management
Name of the Student
Name of the University
Author’s Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
PROJECT MANAGEMENT
Table of Contents
2.3.2 Project purpose..................................................................................................................2
2.3.3 Project scope.....................................................................................................................2
2.3.4 Out of Scope......................................................................................................................3
2.3.5 Measure of success............................................................................................................3
2.4.1 List of stakeholders...........................................................................................................4
2.4.2 Method of communication................................................................................................4
2.4.3 Communication process example.....................................................................................4
2.4.4 Comment on communication process...............................................................................5
2.4.5 Comment of statement submitting to previous company..................................................5
2.4.10 Change management.......................................................................................................5
2.5.1 Case reflection...................................................................................................................6
References..................................................................................................................................7
PROJECT MANAGEMENT
Table of Contents
2.3.2 Project purpose..................................................................................................................2
2.3.3 Project scope.....................................................................................................................2
2.3.4 Out of Scope......................................................................................................................3
2.3.5 Measure of success............................................................................................................3
2.4.1 List of stakeholders...........................................................................................................4
2.4.2 Method of communication................................................................................................4
2.4.3 Communication process example.....................................................................................4
2.4.4 Comment on communication process...............................................................................5
2.4.5 Comment of statement submitting to previous company..................................................5
2.4.10 Change management.......................................................................................................5
2.5.1 Case reflection...................................................................................................................6
References..................................................................................................................................7

2
PROJECT MANAGEMENT
2.3.2 Project purpose
The project purpose is referred as the actual aim of the project. Here the actual project
is construct the building where the students can get the facilities from the university campus
(Kerzner, 2017). Within the university, there was not have proper dining café and also other
facilities including medical help as well as movies or recreation etc. For that, they are bound
to go at the outside for searching their native foods. To solve this issue, it requires to
construct a building where the students can get all of the facilities inside the university
campus. The project is going on the construction of the Kitchen which will open for 24 hours
to provide the proper food service to the students (Meredith, Mantel Jr & Shafer, 2017). The
kitchen will construct for almost 500 students and there requires to conduct a survey where
the student can find their native dishes.
Project goals
The goal of the project is to provide the good quality food so that the student can get
their native food. However, in this university, the students come from various countries and
for that they have different native foods. Due to this variation, there should conduct a survey
by which it can understand about their native foods. Moreover, the charges of the facilities do
not have any charges because all the charges should include in the annual residential charge.
The dining café should offer the foods with minimum charges to the students.
2.3.3 Project scope
The scope of the project is considered as project deliverables that is related with all of
the detailed information of project (Heagney, 2016). The project will relate with the
construction of the kitchen or a building where the students can get all the facilities from the
inside of the university campus. It needs to construct the project of the construction of kitchen
within the proper timing so that the students can get the facilities within the time. The kitchen
PROJECT MANAGEMENT
2.3.2 Project purpose
The project purpose is referred as the actual aim of the project. Here the actual project
is construct the building where the students can get the facilities from the university campus
(Kerzner, 2017). Within the university, there was not have proper dining café and also other
facilities including medical help as well as movies or recreation etc. For that, they are bound
to go at the outside for searching their native foods. To solve this issue, it requires to
construct a building where the students can get all of the facilities inside the university
campus. The project is going on the construction of the Kitchen which will open for 24 hours
to provide the proper food service to the students (Meredith, Mantel Jr & Shafer, 2017). The
kitchen will construct for almost 500 students and there requires to conduct a survey where
the student can find their native dishes.
Project goals
The goal of the project is to provide the good quality food so that the student can get
their native food. However, in this university, the students come from various countries and
for that they have different native foods. Due to this variation, there should conduct a survey
by which it can understand about their native foods. Moreover, the charges of the facilities do
not have any charges because all the charges should include in the annual residential charge.
The dining café should offer the foods with minimum charges to the students.
2.3.3 Project scope
The scope of the project is considered as project deliverables that is related with all of
the detailed information of project (Heagney, 2016). The project will relate with the
construction of the kitchen or a building where the students can get all the facilities from the
inside of the university campus. It needs to construct the project of the construction of kitchen
within the proper timing so that the students can get the facilities within the time. The kitchen
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
PROJECT MANAGEMENT
should contain so many dishes which are native for the students. Moreover, it must maintain
the proper hygiene in the kitchen for health purpose of the university students. However, it
requires to implement a tracking system which track the entry or exit time of the students
(Fleming & Koppelman, 2016). The campus should arrange a survey where the student can
select their native dishes for creating the menu card of the hostel dining café.
2.3.4 Out of Scope
According to the project scope, there exists some of the boundaries which are
considered as out of scope. The out of scope contains that there is no persons allowed in this
dining café from the outside of the university. Only university students can allow to enter this
dining café (Walker, 2015). Moreover, outside foods are not allowed in this dining café.
Moreover, there will not have any chance of occurrence of financial exchange.
2.3.5 Measure of success
# Description of the
Measure of Success
How
Measured
Deadline to
Achieve the
Measure of
Success
Is this measurement
designed to determine
if specific project goals
described in the
Project’s Purpose
section have been
achieved? If yes,
which goals?
1. It requires to take the
survey between the
students so that it can
analyze the food quality
and also the native
foods of the students
(Leach, 2014).
From the
medium of
survey.
However,
through the
survey, the
students can
provide proper
feedback about
the food
quality.
February 2020 From the survey, it can
understand that which
cuisine is loved by the
students and also
understand the level of
food quality.
2. It requires to analyze
the entry or exit timing
By using the
software, the
April 2020 Based on these timing,
it can understand the
PROJECT MANAGEMENT
should contain so many dishes which are native for the students. Moreover, it must maintain
the proper hygiene in the kitchen for health purpose of the university students. However, it
requires to implement a tracking system which track the entry or exit time of the students
(Fleming & Koppelman, 2016). The campus should arrange a survey where the student can
select their native dishes for creating the menu card of the hostel dining café.
2.3.4 Out of Scope
According to the project scope, there exists some of the boundaries which are
considered as out of scope. The out of scope contains that there is no persons allowed in this
dining café from the outside of the university. Only university students can allow to enter this
dining café (Walker, 2015). Moreover, outside foods are not allowed in this dining café.
Moreover, there will not have any chance of occurrence of financial exchange.
2.3.5 Measure of success
# Description of the
Measure of Success
How
Measured
Deadline to
Achieve the
Measure of
Success
Is this measurement
designed to determine
if specific project goals
described in the
Project’s Purpose
section have been
achieved? If yes,
which goals?
1. It requires to take the
survey between the
students so that it can
analyze the food quality
and also the native
foods of the students
(Leach, 2014).
From the
medium of
survey.
However,
through the
survey, the
students can
provide proper
feedback about
the food
quality.
February 2020 From the survey, it can
understand that which
cuisine is loved by the
students and also
understand the level of
food quality.
2. It requires to analyze
the entry or exit timing
By using the
software, the
April 2020 Based on these timing,
it can understand the
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
PROJECT MANAGEMENT
of the students. timing can be
tracked.
timing of the entry and
depends on it, the
dining café should
understand the timing
in which they can
prepare the foods.
2.4.1 List of stakeholders
In this project, the major stakeholders who engage with this project are as follows:
Project manager, finance manager, risk analyst, IT employee, suppliers, sponsor, team
members etc.
2.4.2 Method of communication
Project manager – The project supervisor is considered as the head of the project. He is
responsible to arrange meeting or other communication methods.
Finance manager – The meeting is the effective communication way which is applicable for
all the stakeholders.
Risk analyst – Meeting
IT employee – Meeting
Suppliers – Meeting
Sponsor – Email.
Team members – Meeting
2.4.3 Communication process example
The email is the effective communication way for the project sponsor. The head of the team
or project manager can send the email to the sponsor and the example of email is as follows:
PROJECT MANAGEMENT
of the students. timing can be
tracked.
timing of the entry and
depends on it, the
dining café should
understand the timing
in which they can
prepare the foods.
2.4.1 List of stakeholders
In this project, the major stakeholders who engage with this project are as follows:
Project manager, finance manager, risk analyst, IT employee, suppliers, sponsor, team
members etc.
2.4.2 Method of communication
Project manager – The project supervisor is considered as the head of the project. He is
responsible to arrange meeting or other communication methods.
Finance manager – The meeting is the effective communication way which is applicable for
all the stakeholders.
Risk analyst – Meeting
IT employee – Meeting
Suppliers – Meeting
Sponsor – Email.
Team members – Meeting
2.4.3 Communication process example
The email is the effective communication way for the project sponsor. The head of the team
or project manager can send the email to the sponsor and the example of email is as follows:

5
PROJECT MANAGEMENT
Respected sponsor,
We would to like to make an application for receiving the requirements which is
essential for the project. The project team can analyze the requirements for achieving the
targets. We are requesting you to look the attachment of the project requirements. Please
confirm us for proceeding the project after observing the requirement.
Thanks and regards
Project team
2.4.4 Comment on communication process
According to the communication process, this emailing of the communication is more
effective and better. Project meetings will conduct every week which is more effective for the
project (Too & Weaver, 2014). The bonding of project sponsor with project manager depends
on the method of communication. Through weekly meeting, the project manager can
communicate with the team.
2.4.5 Comment of statement submitting to previous company
In the case of previous company, the communication process is poor and there exists
many flaws within the communication process. The executives are not passed the information
properly and for that there occurs a break in communication process.
2.4.10 Change management
According to this management, the students are the first priority for the dining café
and due to construct this dining café, the students are more beneficial and change their life
style (Joslin & Müller, 2015). However, they are easily get their native foods. Moreover, they
are getting their foods within 24 hours. In addition to this, the suppliers get their permanent
business to build up the financial strong.
PROJECT MANAGEMENT
Respected sponsor,
We would to like to make an application for receiving the requirements which is
essential for the project. The project team can analyze the requirements for achieving the
targets. We are requesting you to look the attachment of the project requirements. Please
confirm us for proceeding the project after observing the requirement.
Thanks and regards
Project team
2.4.4 Comment on communication process
According to the communication process, this emailing of the communication is more
effective and better. Project meetings will conduct every week which is more effective for the
project (Too & Weaver, 2014). The bonding of project sponsor with project manager depends
on the method of communication. Through weekly meeting, the project manager can
communicate with the team.
2.4.5 Comment of statement submitting to previous company
In the case of previous company, the communication process is poor and there exists
many flaws within the communication process. The executives are not passed the information
properly and for that there occurs a break in communication process.
2.4.10 Change management
According to this management, the students are the first priority for the dining café
and due to construct this dining café, the students are more beneficial and change their life
style (Joslin & Müller, 2015). However, they are easily get their native foods. Moreover, they
are getting their foods within 24 hours. In addition to this, the suppliers get their permanent
business to build up the financial strong.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
PROJECT MANAGEMENT
2.5.1 Case reflection
As per this project, the project is based on the construction of kitchen in university
campus in order to provide the proper food service to the students. To conduct the project
successfully, the project supervisor is referred as the lead of project and he is responsible for
all the project. In that case, the communication is effective way in order to success the
project. For effective communication, the project director desires to arrange the weekly
meeting.
PROJECT MANAGEMENT
2.5.1 Case reflection
As per this project, the project is based on the construction of kitchen in university
campus in order to provide the proper food service to the students. To conduct the project
successfully, the project supervisor is referred as the lead of project and he is responsible for
all the project. In that case, the communication is effective way in order to success the
project. For effective communication, the project director desires to arrange the weekly
meeting.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7
PROJECT MANAGEMENT
References
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology
and project success in different project governance contexts. International journal of
project management, 33(6), 1377-1392.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Leach, L. P. (2014). Critical chain project management. Artech House.
Meredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial
approach. John Wiley & Sons.
Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual
framework for project governance. International Journal of Project
Management, 32(8), 1382-1394.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
PROJECT MANAGEMENT
References
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Joslin, R., & Müller, R. (2015). Relationships between a project management methodology
and project success in different project governance contexts. International journal of
project management, 33(6), 1377-1392.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Leach, L. P. (2014). Critical chain project management. Artech House.
Meredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial
approach. John Wiley & Sons.
Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual
framework for project governance. International Journal of Project
Management, 32(8), 1382-1394.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
1 out of 8

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.