ITECH2002 Systems Modelling Assignment 2 - Dynamic Modelling

Verified

Added on  2022/10/04

|12
|1130
|57
Project
AI Summary
This document presents a comprehensive solution for ITECH2002 Systems Modelling Assignment 2, focusing on dynamic modelling, screen design, and test plans within a Customer Relationship Management System (CRMS) context. The assignment involves the analysis of a sub-system, WMS Subsystem, of a CRMS, including the creation of fully developed use case descriptions for 'Prepare Quote' and 'Request Quote' use cases. Furthermore, the solution provides activity diagrams, sequence diagrams, and storyboards to model the system's behavior. The document also features screen designs and a test plan to ensure the functionality and quality of the modeled system. The assignment adheres to the course requirements including the use of UML diagrams. This assignment is for the year 2019/17.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1 of 1
4
School of Engineering and Information Technology
Assignment 2, 2019/17
ITECH2002 – Systems Modelling
__________________________________________________________________________________
Assignment 2 – Dynamic Modelling, Screen
Design and Test Plans
Timelines and Expectations
Marks: Assignment will be assessed based on a mark out of 100
The following information is a summary from your Course Description:
Percentage Value of Task: 20% of the course marks
Due: Friday, September 27th, 2019 at 11:55pm
Minimum time expectation: 40 hours (per student)
Individual.
The organization Name:Publicit-e Pty. Ltd.
Student Name student ID sub-system
WMS Subsystem.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
Table of Contents
Design and Test Plans..............................................................................................................................................1
Timelines and Expectations..................................................................................................................................1
The fully developed use case descriptions............................................................................................................3
Table 1 below showing the fully developed Register job use case description of wms subsystem..................3
Table 2 below showing the fully developed Register job use case description of wms subsystem..................5
The activity diagrams............................................................................................................................................7
Figure 2 below showing the activity diagram of Register job Use Case of WMS subsystem..........................7
Figure 3 below showing the activity diagram of Make Payment Use Case of WMS subsystem.....................8
Sequence diagrams...............................................................................................................................................9
Figure 5 below showing the Sequence diagram of Make payment Use Case of WMS subsystem................10
Storyboarding......................................................................................................................................................11
The screens of use care register job by client are shown below.....................................................................11
The screens of Make payments by client are shown below............................................................................12
The test plan for register job usecase..................................................................................................................13
Figure 6 below show test plan of register job..................................................................................................13
References...........................................................................................................................................................14
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
The fully developed use case descriptions.
Table 1 below illustrates the fully developed Prepare quote use case description of QuotenContract
subsystem.
Fully developed use case description
Use Case Name Prepare Quote
Scenario Success Scenario: The quote is
successfully requested, approved,
Prepared and provided.
Failure Scenario: The quote is rejected
because they do not meet the standard.
The system failed to register quote.
Triggering Event The sales person wants to prepare the
quote on the quoten Contract
subsystem.
Actors Client, and sales person .
Purpose To prepare quote for clients.
Overview/Description The use case shows overview and
description of the sales person
preparing quote and receiving quote
request from client on the quoten
Contract subsystem.
Type Business Requirement and Design
Requirement.
Stakeholders Client, system administrator,staffs,
Publicit-e Pty.
Ltd,partners,suppliers , Australia
Government and Sales person.
Pre-Conditions The quoten Contract subsystem is
operating normally. The client is login
on the system and has placed quote
request.
Post-Conditions The sales person has prepared the quote
and client has received quote.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
Special Requirements
Flow of Events
Actor Action System Response
The clients login, make quote request. The sales person’s
login on system and checks the status of the quote request.
If the request meets the standard the sales person accepts it
and if the quote does not meet the standard the sale person
rejects it and comment the reason to reject it.When quote is
accepted the client receives the quote.
System Authenticate both salesperson
and Client. The system displays page
which enable client to enter quote
request. The system verify quote
details. The system notify the client
about status of quote.
Alternate Flow of Events/Exceptional Conditions
Authentication client and sale person with correct details,
client make quote request, Prepare quote, complete quote
notification.
Wrong login details.
Quote rejected.
System calculate wrong details.
No internet services.
The system is not working
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
Table 2 below illustration of the fully developed use case description of Request Quote on
QuotenContract subsystem.
Fully developed use case of Request Quote.
Use Case Name Request Quote.
Scenario Success Scenario: Clients’ success
request quote.
Failure Scenario: The quote request
failed to be submitted due to failure to
meet standard .The sales person fails to
work on quote. The system is not
working.
Triggering Event The Client need to send the quote
request.
Actors Client, and sales person.
Purpose To request for the quote.
Overview/Description The use case shows overview and
description of how client request for
quotes
Type Business Requirement and Design
Requirement.
Stakeholders Client, system administrator,staffs,
Publicit-e Pty. Ltd,partners,suppliers ,
Australia Government and Sales
person.
Pre-Conditions The QuotenContract subsystem is operating
normally. The client has login details..
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
Post-Conditions The client has requested for the quotes
and received quote status.
Special Requirements
Flow of Events
Actor Action System Response
Clients login on QuotenContract subsystem system and select
request quote option .The client enters the job id, job name
and cost then place request quote. The client receive
notification of the request successfully submitted.
System Authenticate Client, The
system displays request quote option.
The system verify quote and checks if
it meet the standard then notifies the
client of the quote successfully
submitted.
Alternate Flow of Events/Exceptional Conditions
Client Authentication, Enter quote details , quote request
notification
And Receive Cash.
Wrong job details, The job details does
not exist. The system is faulty.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
The activity diagrams.
Figure 1 below illustrates the activity diagram of Use Case Prepare quote of QuotenContract subsystem.
Figure 2 below showing the activity diagram subsystem.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
Sequence diagrams.
Figure 3 below showing the Sequence diagram Use Case of.
Figure 4 below showing the Sequence diagram .
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
Storyboarding.
The screens of use careby client are shown below.
1 2
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
3 4
The screens of client are shown below.
1 2
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
3 4
The test plan for usecase.
Figure 5 below show test plan of.
Document Page
CRICOS Provider No. 00103D ITECH2002_Assignment2_sem9_2019_201917 _T_Keogh .docx Page 1
3
of 1
3
School of Engineering and Information Technology
ITECH2002 Systems Modelling Assignment 2, 2019/17
References
Satzinger, J.W., Jackson, R.B. & Burd, S.D. (2016). Systems Analysis and Design in a Changing
World (7th ed.). Boston, MA: Cengage Learning US
chevron_up_icon
1 out of 12
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]