Unit 6 Project Report: Strategies for a Diverse Workforce at Jaguar
VerifiedAdded on 2023/01/09
|22
|4406
|34
Report
AI Summary
This report presents a project undertaken to determine effective strategies and initiatives for managing a diverse workforce, specifically focusing on Jaguar. The project encompasses a comprehensive project management plan, including scope, cost analysis, quality considerations, and risk assessment. It details the formulation of a Work Breakdown Structure (WBS) and a Gantt chart for organized task execution. The research methodology employed combines qualitative and quantitative research methods, including the use of questionnaires to gather primary data on employee awareness and perceptions regarding diversity and equality policies. The report analyzes the collected data, presents findings, and provides recommendations for improving workforce productivity through the implementation of diversity-related strategies. The project also reflects on the value gained from conducting the research and its implications for fostering an inclusive work environment.

Managing A Successful
Business Project
Business Project
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Contents
Initiative and strategy for ensuring equality among diverse workforce..........................................3
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
Project aim and objectives......................................................................................................3
P2 Formulation of project management plan.........................................................................4
P3 Work-break down structure and Gantt chart.....................................................................6
TASK 2............................................................................................................................................7
P4 Small scale research for collecting the information related with project..........................7
TASK 3............................................................................................................................................9
P5 Findings and data by using appropriate tools and techniques...........................................9
P6 Recommendation.............................................................................................................15
TASK 4..........................................................................................................................................15
P7 Reflection on the project value........................................................................................15
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17
Initiative and strategy for ensuring equality among diverse workforce..........................................3
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
Project aim and objectives......................................................................................................3
P2 Formulation of project management plan.........................................................................4
P3 Work-break down structure and Gantt chart.....................................................................6
TASK 2............................................................................................................................................7
P4 Small scale research for collecting the information related with project..........................7
TASK 3............................................................................................................................................9
P5 Findings and data by using appropriate tools and techniques...........................................9
P6 Recommendation.............................................................................................................15
TASK 4..........................................................................................................................................15
P7 Reflection on the project value........................................................................................15
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17

Initiative and strategy for ensuring equality among diverse workforce
INTRODUCTION
With analysing the concept of equality and diverse in the organisation it is identified that
an organisation enable and engage individuals for accomplish of company goals and objectives.
By monitoring the impact of globalisation it is identified that an organisation improves
employee’s productivity with managing overall workforce. With analysis of diversity
management undertake aspects that are concern about increasing company acceptance to employ
individuals from different background (Al-Bayati and et. al., 2017). In context of this report,
Jaguar is considered as a British automotive organisation which headquarters is situated in the
Whitley, United Kingdom. Moreover, report highlights on strategy to ensure similar workforce
in organisation and for researcher develop specific, aim, question and objectives. Project
management plan will also formulated for completing all work in an organised manner. In the
last, adoption of different research methodologies for analysing the gathered information.
TASK 1
Project aim and objectives
Jaguar is an automotive organisation which is hold by Jaguar Land Rover Limited. In the
present scenario, it is a British multi-national motorized company which offer luxury as well as
sports utility vehicles in the market. Jaguar land rover is a subsidiary organisation of Tata Motors
(D'Netto and et. al., 2014). Moreover, organisation is well-known for managing its diverse
workforce and it leads business to complete all work with engaging better skills and capabilities
in organisation that also helps to ensure implement of strategy related with diverse workforce.
Research aim
INTRODUCTION
With analysing the concept of equality and diverse in the organisation it is identified that
an organisation enable and engage individuals for accomplish of company goals and objectives.
By monitoring the impact of globalisation it is identified that an organisation improves
employee’s productivity with managing overall workforce. With analysis of diversity
management undertake aspects that are concern about increasing company acceptance to employ
individuals from different background (Al-Bayati and et. al., 2017). In context of this report,
Jaguar is considered as a British automotive organisation which headquarters is situated in the
Whitley, United Kingdom. Moreover, report highlights on strategy to ensure similar workforce
in organisation and for researcher develop specific, aim, question and objectives. Project
management plan will also formulated for completing all work in an organised manner. In the
last, adoption of different research methodologies for analysing the gathered information.
TASK 1
Project aim and objectives
Jaguar is an automotive organisation which is hold by Jaguar Land Rover Limited. In the
present scenario, it is a British multi-national motorized company which offer luxury as well as
sports utility vehicles in the market. Jaguar land rover is a subsidiary organisation of Tata Motors
(D'Netto and et. al., 2014). Moreover, organisation is well-known for managing its diverse
workforce and it leads business to complete all work with engaging better skills and capabilities
in organisation that also helps to ensure implement of strategy related with diverse workforce.
Research aim
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

“To determine the strategy and initiatives which are related with diverse workforce for
improving the overall productivity of organisation through providing similar opportunity to all
employees”.
Research objective
To analyse the impact of gap such as gender, religion etc. between workforce that reduces
productivity of organisation.
To determine strategy and initiatives which are implemented in organisation for
managing overall workforce for providing similar advantage to all employee’s.
To identify all techniques that support organisation for implementing strategy that
manage diverse workforce.
P2 Formulation of project management plan
The term project management is the guidance of Project management body of knowledge
that is used to implement and apply different skills, techniques and tools for managing project
activities. The main aim of project management plan is to match research activities with project
requirements (Mathews, 2015). This is also used for managing aspects of project with teams and
tools in order to ensure success of project that is leading business to work with better practices
for completing all work in an organised manner.
Benefits of project management
Project management is an important aspect which is used for managing and delivering
aspect that is used in delivering better value against business opportunity. Each research is
developed to accomplish specific goals and objectives that are used in managing project for a
specific purpose. So it helps in calculating business information and utilise them for delivering
right and relevant value from research results.
Project planning phase
Scope- The scope of the project report is too wide and it is used for assisting the
researcher that is used in making frame tactics for managing all diverse employees. It
plays an important role that aids to gain competitive advantages against rival organisation
by reducing conflicts among employees. This also refers project scope is broad because
employees are recruited in each organisation to complete business operations properly.
Cost- In order to conduct all investigation this is identified cost plays an important role
for complete of research in an accurate manner (Meyer, Morrison and Zuniga, 2017).
improving the overall productivity of organisation through providing similar opportunity to all
employees”.
Research objective
To analyse the impact of gap such as gender, religion etc. between workforce that reduces
productivity of organisation.
To determine strategy and initiatives which are implemented in organisation for
managing overall workforce for providing similar advantage to all employee’s.
To identify all techniques that support organisation for implementing strategy that
manage diverse workforce.
P2 Formulation of project management plan
The term project management is the guidance of Project management body of knowledge
that is used to implement and apply different skills, techniques and tools for managing project
activities. The main aim of project management plan is to match research activities with project
requirements (Mathews, 2015). This is also used for managing aspects of project with teams and
tools in order to ensure success of project that is leading business to work with better practices
for completing all work in an organised manner.
Benefits of project management
Project management is an important aspect which is used for managing and delivering
aspect that is used in delivering better value against business opportunity. Each research is
developed to accomplish specific goals and objectives that are used in managing project for a
specific purpose. So it helps in calculating business information and utilise them for delivering
right and relevant value from research results.
Project planning phase
Scope- The scope of the project report is too wide and it is used for assisting the
researcher that is used in making frame tactics for managing all diverse employees. It
plays an important role that aids to gain competitive advantages against rival organisation
by reducing conflicts among employees. This also refers project scope is broad because
employees are recruited in each organisation to complete business operations properly.
Cost- In order to conduct all investigation this is identified cost plays an important role
for complete of research in an accurate manner (Meyer, Morrison and Zuniga, 2017).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

This is also used for providing appropriate information for completing research in an
accurate manner through completing research in the formulated budget. For undertaking
research it is used in managing and completing all tasks with the allocated amount.
Description Cost
Market survey £ 40
Project equipment £30
Travel cost £35
Investigation and management cost £70
Total £175
Quality- To improve overall project results, researcher is focused for implementing
quality information within the business. There are various tools and techniques used by
organisation such as primary method data collection for completing of research on a
specific topic with more quality. Moreover, investigator also focuses that all
information which is collected must be gain from authentic and relevant sources. It also
ensures that all information which is collected by is useful for implementing strategy
and initiative related with diverse workforce (Okçu, 2014).
Time- It is the frame which is used by researcher to complete research in an
appropriate manner specifically within minimum time. The duration for the completion
of this research project is two months. In the first third week topic and aim of research
is selected and after that in further weeks information related with research activities for
analysing respondent review is used to complete research task in minimum time period.
Communication- Formal and informal are two types of communication method that is
used by investigators for completing research with sharing important information.
Further, all relevant information is distributed among all divisions by utilising
transparent communication channel. Researcher communicates with project members
and respondents through using email, telephone and video conference.
Risk- At the time of conducting all investigation it is identified that several risk factors
are associated that creates problems in research (Phillips and et. al., 2016). The major
risk is the raise of conflicts between workforce due to implement of new diversity
accurate manner through completing research in the formulated budget. For undertaking
research it is used in managing and completing all tasks with the allocated amount.
Description Cost
Market survey £ 40
Project equipment £30
Travel cost £35
Investigation and management cost £70
Total £175
Quality- To improve overall project results, researcher is focused for implementing
quality information within the business. There are various tools and techniques used by
organisation such as primary method data collection for completing of research on a
specific topic with more quality. Moreover, investigator also focuses that all
information which is collected must be gain from authentic and relevant sources. It also
ensures that all information which is collected by is useful for implementing strategy
and initiative related with diverse workforce (Okçu, 2014).
Time- It is the frame which is used by researcher to complete research in an
appropriate manner specifically within minimum time. The duration for the completion
of this research project is two months. In the first third week topic and aim of research
is selected and after that in further weeks information related with research activities for
analysing respondent review is used to complete research task in minimum time period.
Communication- Formal and informal are two types of communication method that is
used by investigators for completing research with sharing important information.
Further, all relevant information is distributed among all divisions by utilising
transparent communication channel. Researcher communicates with project members
and respondents through using email, telephone and video conference.
Risk- At the time of conducting all investigation it is identified that several risk factors
are associated that creates problems in research (Phillips and et. al., 2016). The major
risk is the raise of conflicts between workforce due to implement of new diversity

related strategy. Project management tools such as Gantt chart and WBS is used for
managing risk and completing research by analysing all risk related aspects.
Resources- Human, machines, laptop, mobile phone and printer are some essential
resources for completion of research or project. In the context of diverse workforce
related strategy research utilise internet, laptop, finance and coordinate them with
human resources so the projects are completed with more efficiency in order to
interpret effective results and it also leads individuals for completing project with more
efficiency which generate meaningful and relevant results from research.
P3 Work-break down structure and Gantt chart
WBS- At the time of completing this research, researcher or investigator divide and
delegate the complex project into small projects. This defines the main focus of researcher is to
decompose large project into smaller components for all work is executed appropriately. Further,
with the use of WBS project management tool all project activities engage their efforts with
motive of accomplishing organisational goals and objectives (Syed, 2020). The main purpose of
WBS is to delegate small activities for completing research with more efficiency as it is easy to
understand by all employees with analysing task into small manner.
Gantt chart- The Gantt chart is formulated by the different individuals which are used for
representing the work action and activities into smaller projects. Moreover, all bars are divided
according to work needs that are performed by researcher with analysis of all task and projects in
an appropriate manner (Uygur and Aydin, 2015). This also defines all the work, action and
managing risk and completing research by analysing all risk related aspects.
Resources- Human, machines, laptop, mobile phone and printer are some essential
resources for completion of research or project. In the context of diverse workforce
related strategy research utilise internet, laptop, finance and coordinate them with
human resources so the projects are completed with more efficiency in order to
interpret effective results and it also leads individuals for completing project with more
efficiency which generate meaningful and relevant results from research.
P3 Work-break down structure and Gantt chart
WBS- At the time of completing this research, researcher or investigator divide and
delegate the complex project into small projects. This defines the main focus of researcher is to
decompose large project into smaller components for all work is executed appropriately. Further,
with the use of WBS project management tool all project activities engage their efforts with
motive of accomplishing organisational goals and objectives (Syed, 2020). The main purpose of
WBS is to delegate small activities for completing research with more efficiency as it is easy to
understand by all employees with analysing task into small manner.
Gantt chart- The Gantt chart is formulated by the different individuals which are used for
representing the work action and activities into smaller projects. Moreover, all bars are divided
according to work needs that are performed by researcher with analysis of all task and projects in
an appropriate manner (Uygur and Aydin, 2015). This also defines all the work, action and
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

activities of project plan is divided into bars within given task so all project is completed
according to given time period. With formulating an effective Gantt chart it is also easy to
understand the time taken for completion of each activity.
TASK 2
P4 Small scale research for collecting the information related with project
Qualitative research- Subjective examination is an open-finished and non-numerical
examination of which answers can't be yes or no. Prospect need to offer their input about given
subject. This exploration is communicational in nature that implies scientist need to direct a little
discussion with prospect. There are a few strategies for performing subjective exploration like
Meeting, perception, submergence, open-finished overview and so on (Zaitouni and Gaber,
2017). Value of subjective exploration is that it helps in recognizing consumer\'s taste. It is an
exceptionally flexible approach. Negative mark of subjective information is that it is
exceptionally emotional in nature and not factually calculative. In setting of this examination,
scientist utilize subjective methodology as it help them to pick up top to bottom data about point
and can make better answer for recognized examination issue in an improved way.
Quantitative Research- Quantitative examination refers to the assortment of numerical
information from test universe with the end goal of measurable count. Quantitative exploration is
worried about quantifiable information like numbers and figures which are scientifically
according to given time period. With formulating an effective Gantt chart it is also easy to
understand the time taken for completion of each activity.
TASK 2
P4 Small scale research for collecting the information related with project
Qualitative research- Subjective examination is an open-finished and non-numerical
examination of which answers can't be yes or no. Prospect need to offer their input about given
subject. This exploration is communicational in nature that implies scientist need to direct a little
discussion with prospect. There are a few strategies for performing subjective exploration like
Meeting, perception, submergence, open-finished overview and so on (Zaitouni and Gaber,
2017). Value of subjective exploration is that it helps in recognizing consumer\'s taste. It is an
exceptionally flexible approach. Negative mark of subjective information is that it is
exceptionally emotional in nature and not factually calculative. In setting of this examination,
scientist utilize subjective methodology as it help them to pick up top to bottom data about point
and can make better answer for recognized examination issue in an improved way.
Quantitative Research- Quantitative examination refers to the assortment of numerical
information from test universe with the end goal of measurable count. Quantitative exploration is
worried about quantifiable information like numbers and figures which are scientifically
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

measured. Detriment of quantitative research is in favourable position of subjective exploration
and the other way around. Strategy for executing quantitative research is to review, meet, survey,
calendar and perception. Preferred position of quantitative exploration is that it is anything but
difficult to break down. It is factually measurable (Turner and et. al., 2016). It is a non-one-sided
approach and has a wide reach. Disservices of quantitative examination are hard to make
inference through using simple approach in organisation research.
Primary research- It refers to accumulate and undertake original data with using sample
from all research activities. In the primary research all information is collected directly from the
respondents which provide data according to current situations. Moreover, all primary data
which is collected is unpublished and it is used by researcher for the first time. This also refers
data and information are collected by investigating more time which aid researcher to make
delay in completion of research.
Secondary research- All the information or data which is collected by the use of
electronic and printed activities is known as the secondary activities. Information which is
collected by researcher is not unique and already it is used several times so all sources must be
required with internal and external sources. The methods of data collection relates with
newspaper, journal and reading books (Veysel, 2014). On the other side, it is also used for
gathering information with use of online sources and also help researcher to gather data in
minimum time period.
Sample size- With analyse of sample size it is identified that by selecting individuals
from different group it is used in managing large number of respondents. Probability and non-
probability are two methods of sample size. Moreover, the sample size of investigator is 30
which are selected with probability method.
Q1) Are individuals aware about the diversity as well as equality related policy?
a) Yes
b) No
Q2) Do organisation workforce is able to implement diversity and equality in the workplace?
a) Yes
b) No
Q3) What is the reason to ensure equality and diverse workforce in internal premises of
organisation?
and the other way around. Strategy for executing quantitative research is to review, meet, survey,
calendar and perception. Preferred position of quantitative exploration is that it is anything but
difficult to break down. It is factually measurable (Turner and et. al., 2016). It is a non-one-sided
approach and has a wide reach. Disservices of quantitative examination are hard to make
inference through using simple approach in organisation research.
Primary research- It refers to accumulate and undertake original data with using sample
from all research activities. In the primary research all information is collected directly from the
respondents which provide data according to current situations. Moreover, all primary data
which is collected is unpublished and it is used by researcher for the first time. This also refers
data and information are collected by investigating more time which aid researcher to make
delay in completion of research.
Secondary research- All the information or data which is collected by the use of
electronic and printed activities is known as the secondary activities. Information which is
collected by researcher is not unique and already it is used several times so all sources must be
required with internal and external sources. The methods of data collection relates with
newspaper, journal and reading books (Veysel, 2014). On the other side, it is also used for
gathering information with use of online sources and also help researcher to gather data in
minimum time period.
Sample size- With analyse of sample size it is identified that by selecting individuals
from different group it is used in managing large number of respondents. Probability and non-
probability are two methods of sample size. Moreover, the sample size of investigator is 30
which are selected with probability method.
Q1) Are individuals aware about the diversity as well as equality related policy?
a) Yes
b) No
Q2) Do organisation workforce is able to implement diversity and equality in the workplace?
a) Yes
b) No
Q3) What is the reason to ensure equality and diverse workforce in internal premises of
organisation?

a) Gender discrimination
b) Conflicts among employees
Q4) Which type of problems is faced by organisation for managing diverse workforce?
a) Less coordination between workforce
b) In appropriate communication
Q5) What are the most benefits which is obtained by organisation with implement of strategy
and initiatives related with workforce?
a) Fair and right decision
b) Similar opportunity to all employees
Q6) Does the gap among workforce due to diversity impacts on productivity of employees?
a) Strongly agree
b) Disagree
Q7) Which positive points are obtained by organisation by managing diverse employees?
a) Increase in goodwill
b) Improved work culture
TASK 3
P5 Findings and data by using appropriate tools and techniques
Questionnaire
Q1) Are individuals aware about the diversity as well as equality related
policy?
Frequency
c) Yes 15
d) No 15
Q2) Do organisation workforce is able to implement diversity and equality
in the workplace?
Frequency
c) Yes 20
d) No 10
Q3) What is the reason to ensure equality and diverse workforce in internal
premises of organisation?
Frequency
c) Gender discrimination 18
d) Conflicts among employees 12
b) Conflicts among employees
Q4) Which type of problems is faced by organisation for managing diverse workforce?
a) Less coordination between workforce
b) In appropriate communication
Q5) What are the most benefits which is obtained by organisation with implement of strategy
and initiatives related with workforce?
a) Fair and right decision
b) Similar opportunity to all employees
Q6) Does the gap among workforce due to diversity impacts on productivity of employees?
a) Strongly agree
b) Disagree
Q7) Which positive points are obtained by organisation by managing diverse employees?
a) Increase in goodwill
b) Improved work culture
TASK 3
P5 Findings and data by using appropriate tools and techniques
Questionnaire
Q1) Are individuals aware about the diversity as well as equality related
policy?
Frequency
c) Yes 15
d) No 15
Q2) Do organisation workforce is able to implement diversity and equality
in the workplace?
Frequency
c) Yes 20
d) No 10
Q3) What is the reason to ensure equality and diverse workforce in internal
premises of organisation?
Frequency
c) Gender discrimination 18
d) Conflicts among employees 12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Q4) Which type of problems is faced by organisation for managing diverse
workforce?
Frequency
c) Less coordination between workforce 14
d) In appropriate communication 16
Q5) What are the most benefits which is obtained by organisation with
implement of strategy and initiatives related with workforce?
Frequency
c) Fair and right decision 13
d) Similar opportunity to all employees 17
Q6) Does the gap among workforce due to diversity impacts on
productivity of employees?
Frequency
c) Strongly agree 11
d) Disagree 19
Q7) Which positive points are obtained by organisation by managing
diverse employees?
Frequency
c) Increase in goodwill 9
d) Improved work culture 21
Q1) Are individuals aware about the diversity as well as equality related
policy?
Frequency
a) Yes 15
b) No 15
workforce?
Frequency
c) Less coordination between workforce 14
d) In appropriate communication 16
Q5) What are the most benefits which is obtained by organisation with
implement of strategy and initiatives related with workforce?
Frequency
c) Fair and right decision 13
d) Similar opportunity to all employees 17
Q6) Does the gap among workforce due to diversity impacts on
productivity of employees?
Frequency
c) Strongly agree 11
d) Disagree 19
Q7) Which positive points are obtained by organisation by managing
diverse employees?
Frequency
c) Increase in goodwill 9
d) Improved work culture 21
Q1) Are individuals aware about the diversity as well as equality related
policy?
Frequency
a) Yes 15
b) No 15
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Interpretation- The data interpretation of first question demonstrate that there are various
challages faced by management at the time to provide information related with managing diverse
workforce. Through this it is also analysed by company that half individuals are aware about
equality policy while other half are not aware.
Q2) Do organisation workforce is able to implement diversity and equality
in the workplace?
Frequency
a) Yes 20
b) No 10
challages faced by management at the time to provide information related with managing diverse
workforce. Through this it is also analysed by company that half individuals are aware about
equality policy while other half are not aware.
Q2) Do organisation workforce is able to implement diversity and equality
in the workplace?
Frequency
a) Yes 20
b) No 10

Interpretation- The data bar signifies that organisation holds the power for managing and
providing infformation related with workforce management. Along with this it is also used to
complete all work in an organised manner that is leading management to implement policy
which boost workforce possibility to improve employee performance.
Q3) What is the reason to ensure equality and diverse workforce in internal
premises of organisation?
Frequenc
y
a) Gender discrimination 18
b) Conflicts among employees 12
Interpretation- The chart represent that large number of workforce engaged in company
operations that belongs to different backgroud. This results gender discrimination among
employees is increasing with rapid speed. On the other side, due to the reason of difference
within workforce conflicts are also faced by management to manage its employees properly.
Q4) Which type of problems is faced by organisation for managing diverse
workforce?
Frequency
a) Less coordination between workforce 14
b) In appropriate communication 16
providing infformation related with workforce management. Along with this it is also used to
complete all work in an organised manner that is leading management to implement policy
which boost workforce possibility to improve employee performance.
Q3) What is the reason to ensure equality and diverse workforce in internal
premises of organisation?
Frequenc
y
a) Gender discrimination 18
b) Conflicts among employees 12
Interpretation- The chart represent that large number of workforce engaged in company
operations that belongs to different backgroud. This results gender discrimination among
employees is increasing with rapid speed. On the other side, due to the reason of difference
within workforce conflicts are also faced by management to manage its employees properly.
Q4) Which type of problems is faced by organisation for managing diverse
workforce?
Frequency
a) Less coordination between workforce 14
b) In appropriate communication 16
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 22
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.





