PPMP20010: Project Controls Report for Kerb Construction Project
VerifiedAdded on  2020/02/24
|6
|2565
|77
Report
AI Summary
This report, prepared for the Kerb Construction Project at Fison Ave West, details the project's controllable categories, configuration, status accounts, logs, and issues. It covers deliverables like ordering and erection of kerb furniture, underground work quality, and health and safety measures. Configuration aspects include revisions to concrete quality standards and safety measures for night work and rerouting of service roads. Status accounts encompass mobilization, cost, time, and quality. Logs record weather information and site verification visits. Issues addressed include rerouting underground facilities and material procurement challenges. The report also provides a configuration control matrix outlining procedural outputs for each controllable item, with detailed explanations of inputs, tools, techniques, and outputs. Furthermore, it examines time-driven items, emphasizing the establishment of the site office. The report highlights the importance of variance analysis and status reporting to ensure project success. The report uses PMBOK knowledge areas such as scope, time, cost, quality, integration and procurement management to analyse the project.
1 out of 6