Lead and Manage Team Effectiveness: Assessments 1-3 Report Analysis
VerifiedAdded on 2022/12/29
|15
|2485
|150
Report
AI Summary
This report presents a comprehensive analysis of a student's assignment focused on leading and managing team effectiveness. The assignment includes three assessments centered around scenarios and virtual classroom exercises. Assessment 1 delves into sustainability data, policy procedures, and meeting agendas, examining team dynamics, team performance plans, and communication strategies. Assessment 2 revolves around email communications related to training schedules, concerns, and expenditure approvals. Assessment 3 focuses on providing feedback and developing new policies. The report covers various aspects of team management, including team purpose, roles, responsibilities, key performance indicators, communication, decision-making processes, training opportunities, and strategies for addressing team member concerns. It emphasizes the importance of sustainability, efficient resource usage, and effective communication within a team environment. The report also includes examples of emails used for communication within the team.

Lead and Manage Team
Effectiveness
Effectiveness
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Contents
Assessment 1 – Scenario and Virtual Classroom....................................................................................3
Question 1...............................................................................................................................................3
Question 2...............................................................................................................................................7
Question 3...............................................................................................................................................9
Question 4.............................................................................................................................................10
Assessment 2 – Scenario..........................................................................................................................11
Question 1.............................................................................................................................................11
Question 2.............................................................................................................................................12
Question 3.............................................................................................................................................12
Assessment 3 – Scenario..........................................................................................................................13
Question 1.............................................................................................................................................13
Question 2.............................................................................................................................................14
Assessment 1 – Scenario and Virtual Classroom....................................................................................3
Question 1...............................................................................................................................................3
Question 2...............................................................................................................................................7
Question 3...............................................................................................................................................9
Question 4.............................................................................................................................................10
Assessment 2 – Scenario..........................................................................................................................11
Question 1.............................................................................................................................................11
Question 2.............................................................................................................................................12
Question 3.............................................................................................................................................12
Assessment 3 – Scenario..........................................................................................................................13
Question 1.............................................................................................................................................13
Question 2.............................................................................................................................................14

Assessment 1 – Scenario and Virtual Classroom
Question 1
The sustainability data shows that the usage of resources was more than as expected.
There were different materials that were purchased for the different operations of the business.
But the report shows that their usage is higher than as it should have been.
Policy Procedure
DOCUMENT TITLE: [ENTER TITLE OF POLICY AND PROCEDURE]
ADMINISTERED BY: [ENTER NAME AND TITLE OF DOCUMENT ADMINISTRATOR]
APPLICABILITY: [ENTER AUDIENCE]
Purpose
The purpose of developing and implementing the policy as well as procedure is to make
sure that the team members work together effectively. Another intent of developing the same is
that reduce the resource usage in the HR offices as well as to facilitate sustainable practices.
Context
The background of the policy and procedure is that its values and goals is that the internal
targets that will be set, will be aligned with the policy and procedures to achieve the objectives.
Policy statement
The respective business is committed towards reducing the harmful impact on the
environment and is keen on taking various initiatives for the same. The available resources
within the company will be utilized in an effective manner and their overconsumption will be
reduced. The policy and procedure are mainly aimed to benefit the customers as well as the
stakeholders as well. The company will also undertake an innovation campaign with main focus
on sustainability.
Question 1
The sustainability data shows that the usage of resources was more than as expected.
There were different materials that were purchased for the different operations of the business.
But the report shows that their usage is higher than as it should have been.
Policy Procedure
DOCUMENT TITLE: [ENTER TITLE OF POLICY AND PROCEDURE]
ADMINISTERED BY: [ENTER NAME AND TITLE OF DOCUMENT ADMINISTRATOR]
APPLICABILITY: [ENTER AUDIENCE]
Purpose
The purpose of developing and implementing the policy as well as procedure is to make
sure that the team members work together effectively. Another intent of developing the same is
that reduce the resource usage in the HR offices as well as to facilitate sustainable practices.
Context
The background of the policy and procedure is that its values and goals is that the internal
targets that will be set, will be aligned with the policy and procedures to achieve the objectives.
Policy statement
The respective business is committed towards reducing the harmful impact on the
environment and is keen on taking various initiatives for the same. The available resources
within the company will be utilized in an effective manner and their overconsumption will be
reduced. The policy and procedure are mainly aimed to benefit the customers as well as the
stakeholders as well. The company will also undertake an innovation campaign with main focus
on sustainability.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Procedure
In order to achieve the policy statement, the company will undertake various initiatives
such as run an innovation campaign. This will include initiating and launching an innovation
campaign which will be based on environmentally sustainable practices. Apart from this, a
sustainable purchasing policy and strategy will be developed. The results regarding greenhouse
footprint will be published annually. Apart from this, the various environmental risks will also be
reviewed once a year. Targets for reducing the greenhouse gas emissions will also be developed.
Community engagement will also be sought so that more appropriate strategies can be
developed. Therefore, sustainability will be the main aim of the company in order to build a
successful business.
MEETING AGENDA
Date and Time:
27th January, 2021
Location:
Australia
Purpose of the meeting:
Discuss team purpose, roles, responsibilities and accountabilities
Develop a team performance plan
Attendees:
Agenda items:
Time Topics Speaker
2 minutes Explain your role in the team
Purpose of the team and how the team supports GSE
strategic objectives
Feedback to the team relating to current sustainability
performance
5 minutes Establishing processes and expectations for the team
including:
In order to achieve the policy statement, the company will undertake various initiatives
such as run an innovation campaign. This will include initiating and launching an innovation
campaign which will be based on environmentally sustainable practices. Apart from this, a
sustainable purchasing policy and strategy will be developed. The results regarding greenhouse
footprint will be published annually. Apart from this, the various environmental risks will also be
reviewed once a year. Targets for reducing the greenhouse gas emissions will also be developed.
Community engagement will also be sought so that more appropriate strategies can be
developed. Therefore, sustainability will be the main aim of the company in order to build a
successful business.
MEETING AGENDA
Date and Time:
27th January, 2021
Location:
Australia
Purpose of the meeting:
Discuss team purpose, roles, responsibilities and accountabilities
Develop a team performance plan
Attendees:
Agenda items:
Time Topics Speaker
2 minutes Explain your role in the team
Purpose of the team and how the team supports GSE
strategic objectives
Feedback to the team relating to current sustainability
performance
5 minutes Establishing processes and expectations for the team
including:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

hinder our team’s performance
o Processes we will use to facilitate team
cohesion, participation, high performance,
consensus
o Processes we will use to resolve issues
10 minutes Develop team performance plan including:
o Team purpose, roles, responsibilities and
accountabilities
o Outcomes, outputs, key performance indicators
(KPIs) and goals for work team
Once finalised, all members to agree and sign
2 minutes Thank the team for their participation
Explain that you will be regularly updating Sarah
Jackson
Any issues or concerns to contact you
Bret Downie
Meeting preparation notes:
1 How can group dynamics can support or hinder team performance? Support your answer with an
example to tell the team.
Positive group dynamics allow the group members to trust each other whereas poor group
dynamics can affect the overall decision-making in an adverse manner.
Example group dynamics that support:
(minimum of two)
Example group dynamics that hinder:
(minimum of two)
Effective communication
Transparency about the progress of a
project
Over communication
Non-accountability for results
2 Develop and explain two (2) processes you and the team will use to support team cohesion,
participation and performance.
The process of training and development will support the participation among team
o Processes we will use to facilitate team
cohesion, participation, high performance,
consensus
o Processes we will use to resolve issues
10 minutes Develop team performance plan including:
o Team purpose, roles, responsibilities and
accountabilities
o Outcomes, outputs, key performance indicators
(KPIs) and goals for work team
Once finalised, all members to agree and sign
2 minutes Thank the team for their participation
Explain that you will be regularly updating Sarah
Jackson
Any issues or concerns to contact you
Bret Downie
Meeting preparation notes:
1 How can group dynamics can support or hinder team performance? Support your answer with an
example to tell the team.
Positive group dynamics allow the group members to trust each other whereas poor group
dynamics can affect the overall decision-making in an adverse manner.
Example group dynamics that support:
(minimum of two)
Example group dynamics that hinder:
(minimum of two)
Effective communication
Transparency about the progress of a
project
Over communication
Non-accountability for results
2 Develop and explain two (2) processes you and the team will use to support team cohesion,
participation and performance.
The process of training and development will support the participation among team

members and also help in enhancing their performance
Encourage team building among the team members in order to support team
cohesion.
3 Develop and explain two (2) processes you and the team will use to ensure team members have
input into planning and decision making during the development of the team performance plan.
During the decision-making process, the team members will be encouraged to
share their ideas and thoughts.
Goals and values will be defined clearly so that there is no confusion among the
team members.
4 Develop and explain two (2) strategies you and the team will use to ensure consensus is gained
when making decisions during the development of the team performance plan.
Brainstorming is one of the strategies that will be used for the team in order to
ensure that a consensus is gained.
Developing ideas and implementing them is another strategy that will be
implemented when making decisions during the development of the team
performance plan.
5 Develop and explain two (2) processes you and the team will use to identify and resolve issues that
arise.
In order to resolve the issues that may arise, there are different processes that will
be used, such as effective communication will be promoted.
Also, the plan will be monitored and controlled in order to ensure that there are no
errors or in the same.
6 Provide a brief overview of informal and formal training opportunities that you may suggest to the
team if training needs are identified.
Encourage team building among the team members in order to support team
cohesion.
3 Develop and explain two (2) processes you and the team will use to ensure team members have
input into planning and decision making during the development of the team performance plan.
During the decision-making process, the team members will be encouraged to
share their ideas and thoughts.
Goals and values will be defined clearly so that there is no confusion among the
team members.
4 Develop and explain two (2) strategies you and the team will use to ensure consensus is gained
when making decisions during the development of the team performance plan.
Brainstorming is one of the strategies that will be used for the team in order to
ensure that a consensus is gained.
Developing ideas and implementing them is another strategy that will be
implemented when making decisions during the development of the team
performance plan.
5 Develop and explain two (2) processes you and the team will use to identify and resolve issues that
arise.
In order to resolve the issues that may arise, there are different processes that will
be used, such as effective communication will be promoted.
Also, the plan will be monitored and controlled in order to ensure that there are no
errors or in the same.
6 Provide a brief overview of informal and formal training opportunities that you may suggest to the
team if training needs are identified.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Training and development sessions will be conducted for the employees so that they get a chance
to develop new skills as well as enhance their existing knowledge.
Question 2
TEAM PERFORMANCE PLAN
Team Members: Name Role
Name Role
Name Role
Reporting to:
Team Manager:
Team Purpose: The purpose of the team is to work towards a common goal of adopting
various sustainable practices so as to reduce the wastage of materials.
GSE Sustainability
Objectives for
‘sustainable
operations’:
To reduce to wastage and limit the usage of resources by 15% in order tom promote
sustainability in the workplace.
To ensure that the packaging of the products is sustainable so that the wastage is
reduced.
Key responsibilities
for all managers
and staff relating to
All the staff members of the company, including the managers will be responsible for
making sure that the business operations are conducted in an efficient manner.
The managers have to ensure that the team members are aware of their roles and
responsibilities.
to develop new skills as well as enhance their existing knowledge.
Question 2
TEAM PERFORMANCE PLAN
Team Members: Name Role
Name Role
Name Role
Reporting to:
Team Manager:
Team Purpose: The purpose of the team is to work towards a common goal of adopting
various sustainable practices so as to reduce the wastage of materials.
GSE Sustainability
Objectives for
‘sustainable
operations’:
To reduce to wastage and limit the usage of resources by 15% in order tom promote
sustainability in the workplace.
To ensure that the packaging of the products is sustainable so that the wastage is
reduced.
Key responsibilities
for all managers
and staff relating to
All the staff members of the company, including the managers will be responsible for
making sure that the business operations are conducted in an efficient manner.
The managers have to ensure that the team members are aware of their roles and
responsibilities.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Environmental
Sustainability
Strategy:
The managers will ensure that the company strives towards finding new as
well as innovative ways to reduce excess use of resources.
Plan
commencement
date:
20th February, 2021
Plan end date: 31st March, 2021
Team ground rules
Agreed strategies to
ensure team
members have input
into planning,
decision making and
operational aspects
of work team
To encourage the team members to share their ideas during the process of
decision-making. Also, during the process of strategy development, the
managers will involve the team members and ask them to share in their ideas.
Training and development opportunities will also be provided.
Agreed strategies to
ensure that issues,
concerns and
problems identified
by team members
are recognised and
addressed
In case the team members face any problems, they will report the same to
their team leaders or managers. The team members will also be encouraged to
come up with innovative ideas to address the problems.
Sustainability
Strategy:
The managers will ensure that the company strives towards finding new as
well as innovative ways to reduce excess use of resources.
Plan
commencement
date:
20th February, 2021
Plan end date: 31st March, 2021
Team ground rules
Agreed strategies to
ensure team
members have input
into planning,
decision making and
operational aspects
of work team
To encourage the team members to share their ideas during the process of
decision-making. Also, during the process of strategy development, the
managers will involve the team members and ask them to share in their ideas.
Training and development opportunities will also be provided.
Agreed strategies to
ensure that issues,
concerns and
problems identified
by team members
are recognised and
addressed
In case the team members face any problems, they will report the same to
their team leaders or managers. The team members will also be encouraged to
come up with innovative ideas to address the problems.

Team Goals Team Outputs Team KPI’s Person/s
responsible
Due Date
To reduce the
usage of resources
in the company
More efficient
results
Team members
Informal and formal training to be arranged:
Name Role Signature Date
Question 3
EMAIL
To:
CC:
BCC:
From:
Date:
Subject:
responsible
Due Date
To reduce the
usage of resources
in the company
More efficient
results
Team members
Informal and formal training to be arranged:
Name Role Signature Date
Question 3
To:
CC:
BCC:
From:
Date:
Subject:
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Hello,
This mail is to provide you with an overview of the meeting that was conducted earlier
this week. During, the meeting, the roles as well as responsibilities of the different members of
the team. There were various issues that some of you raised and they were handled in a very
efficient manner. We at GSE, are committed towards building a sustainable business and making
sure that the needs of the customers are met along with the minimal wastage of resources. I
believe that there is a requirement for training for all the team members. I will speak to the HR
manager and try to arrange the same as soon as possible. If there is anything that you find
difficulty with, feel free to reach out to me.
Thank You.
Yours Sincerely,
Bret Downie
Question 4
EMAIL
To: Connie123@gse.com
CC: Cheng00@gse.com
BCC:
From:
Date:
Subject: Regarding your Concern
Hello,
This mail is regarding your concern that if anything unexpected happens, how can you
react to the same. I agree with you on this and now that I have had sometime to think about this,
I suggest you that if such a situation arises and you feel that you cannot control the same, you
must consider taking an immediate action by taking into account the suggestions as well as
consulting your other team members. This is because during such occurrences, it is important
This mail is to provide you with an overview of the meeting that was conducted earlier
this week. During, the meeting, the roles as well as responsibilities of the different members of
the team. There were various issues that some of you raised and they were handled in a very
efficient manner. We at GSE, are committed towards building a sustainable business and making
sure that the needs of the customers are met along with the minimal wastage of resources. I
believe that there is a requirement for training for all the team members. I will speak to the HR
manager and try to arrange the same as soon as possible. If there is anything that you find
difficulty with, feel free to reach out to me.
Thank You.
Yours Sincerely,
Bret Downie
Question 4
To: Connie123@gse.com
CC: Cheng00@gse.com
BCC:
From:
Date:
Subject: Regarding your Concern
Hello,
This mail is regarding your concern that if anything unexpected happens, how can you
react to the same. I agree with you on this and now that I have had sometime to think about this,
I suggest you that if such a situation arises and you feel that you cannot control the same, you
must consider taking an immediate action by taking into account the suggestions as well as
consulting your other team members. This is because during such occurrences, it is important
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

that you display teamwork skills. Also, you must me or any immediate leader that you are in
contact with so that they can help you out with the situation more effectively. If there is any
other confusion, you can come and discuss the same with me.
Thank You.
Yours Sincerely,
Bret Downie
Assessment 2 – Scenario
Question 1
EMAIL
To: team@gse.com
CC:
BCC:
From:
Date:
Subject: Confirmation of training dates
Hello,
This mail is to inform you that I have received a mail from the General Manager stating
the confirmation of all the team members training schedule. This email is to confirm that your
schedules training dates are suitable. Also, I would like to confirm that Connie is booked to
attend the formal sustainability training the first week of next month and that Cheng has been
booked for the second week. Further to this, I request you all to share an overview of how are
each one of you is getting on with their action items as per the team performance plan. Please
feel free to reach out to me for support regarding the completion of you action items.
Yours Sincerely,
Bret Downie
contact with so that they can help you out with the situation more effectively. If there is any
other confusion, you can come and discuss the same with me.
Thank You.
Yours Sincerely,
Bret Downie
Assessment 2 – Scenario
Question 1
To: team@gse.com
CC:
BCC:
From:
Date:
Subject: Confirmation of training dates
Hello,
This mail is to inform you that I have received a mail from the General Manager stating
the confirmation of all the team members training schedule. This email is to confirm that your
schedules training dates are suitable. Also, I would like to confirm that Connie is booked to
attend the formal sustainability training the first week of next month and that Cheng has been
booked for the second week. Further to this, I request you all to share an overview of how are
each one of you is getting on with their action items as per the team performance plan. Please
feel free to reach out to me for support regarding the completion of you action items.
Yours Sincerely,
Bret Downie

Question 2
EMAIL
To: sarahjackson@gse.com
CC:
BCC:
From:
Date:
Subject: Regarding your concern
Hello,
The conference is going great. I had forgot about your leaves and I am fine with you
taking up the training at the end of the month. I believe there would be an empty slot so I can
adjust you there. But kindly make sure that you don’t skip the training at the end of the month
when it is held again. Kindly confirm that your dates for the same would be 25th and 26th March,
2021. Regarding your second concern, I would like you to share with me your plans about what
you are up to as per the team performance plan to get a brief idea about your performance. kindly
do the needful as soon as possible.
Thank You.
Yours Sincerely,
Bret Downie
Question 3
EMAIL
To:
CC:
To: sarahjackson@gse.com
CC:
BCC:
From:
Date:
Subject: Regarding your concern
Hello,
The conference is going great. I had forgot about your leaves and I am fine with you
taking up the training at the end of the month. I believe there would be an empty slot so I can
adjust you there. But kindly make sure that you don’t skip the training at the end of the month
when it is held again. Kindly confirm that your dates for the same would be 25th and 26th March,
2021. Regarding your second concern, I would like you to share with me your plans about what
you are up to as per the team performance plan to get a brief idea about your performance. kindly
do the needful as soon as possible.
Thank You.
Yours Sincerely,
Bret Downie
Question 3
To:
CC:
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 15
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.