Lean Project Management in Construction: A Case Study

Verified

Added on  2025/08/30

|14
|3191
|214
AI Summary
Desklib provides solved assignments and past papers to help students succeed.
Document Page
PPMP20009 LEADING LEAN
PROJECTS ASSESSMENT 1
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Contents
Introduction.................................................................................................................................................3
1. Select and explain the project management processes (either from PMBOK or PRINCE2 or a
combination of any best practices you have learned in this unit) that can help you:....................................4
a. Choose the suburb and decide the land size.........................................................................................4
b. Choose the best builder........................................................................................................................6
c. Identify the stakeholders for the project...............................................................................................7
2. What are the factors that will influence the design and layout of your dream home?..........................8
Explain the project management processes you used to determine the design/layout..............................8
3. Explain how you would implement lean best practices to achieve lean project management for (1) and
(2) above....................................................................................................................................................11
Conclusion.................................................................................................................................................12
References.................................................................................................................................................13
Document Page
Introduction
This particular assignment is focused on how lean project management can help in building
suburb and infrastructure, and project management practices and processes can be applicable and
helpful in construction management. How project management processes help attain construction
and project management of building a suburb using the guidance of PMBOK guidance. This
particular assignment is applicable over the objective, where such project management
processes, in different activities involved such as choosing the suburb, or choosing the builder
are some of the important parts of management should be included in the process of construction.
Document Page
1. Select and explain the project management processes (either from PMBOK or
PRINCE2 or a combination of any best practices you have learned in this unit) that
can help you:
The project management processes involved in construction management or choosing the suburb
or the builder is quite important to note here. The project management process in the guidance of
PMBOK, is described by 5 groups of management such as Initiation, planning, execution,
monitoring, and maintenance is important to note here that there are total 47 processes involved
in all these 5 groups of project management, hence it is important to understand the fact here that
how these project management processes and combinations can be helpful in application of these
project.
1. Choose the suburb and decide the land size
In the choosing the suburb and the land size, here under the first group of project managing
project charter is a crucial step in the process, it is because project charter chart out all the
important parts in the construction under priority basis, for example in the construction process,
it is important to mark the blueprint and contour of the land upon which construction will be
going one, hence this step will be on priority before construction can start. Choosing the size of
the land for the construction of the suburb is also inclusive of the project charter, and hence
these steps should be involved in the initiation process of the project charter.
Suburb chose in western Australia (Perth) Alexander heights
Size of the house/Layout 2500 sq. Ft
3 BHK house
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Here, it is important to note also that the project charter is a document-based step, where this
document will contain the list of stakeholders and how it can involve project participants will
also be available in this particular document (Jaeger, 2012).
Other than that, there are important part or steps which also initiate with the use of project
charter, as in the selection of land for construction, the budget set will also be considered in the
project charter. Budget is involved in it because with the project charter, the selection of the land
for the suburb including the layout and size will depend on to the budget set by the client. It is
also quite important to note here that the land size, for the suburb selected, also dependent on to
the number of members which will be the permanent residents in the house.
Furthermore if we talk about the next group of the project management there are processes such
as scope management processes and risk management plan are involved and used for the
construction of the suburb. Here, if we talk about the significance of the project charter, it will
help include the size of the land and to check whether the requirements for which the suburb is
been build are fulfilled by the quality of the soil or note. The size of the layout where the number
of rooms and other needed requirements will be according to the need of the client. If the total
number of members in the family for whom it is been build are more, then, in this case, the
selected land will be according to it (Brewer, 2012).
In selecting the land and setting out the layout of the house, it is important to check the quality of
soil, as to lose soils are not applicable to be considered in shaping the house. Loose soil is weak
for the construction purpose; hence it is important to note that the quality requirements should be
considered according to the construction needs. The quality product checklist is helpful here in
the planning purpose, which can check the quality of the soil which is been used for
construction. The quality product checklist is also helpful in checking the quality of the
cement and quality of bars used, but these are the steps taken after choosing the land (Gibson,
2012).
The scope management plan will help in keep the plan and process of construction on track, as
the structure and layout of the scope management plan are important for the selection of the
sources applicable in the identification of the key user requirements for construction. In the
Document Page
choice of the land for the purpose of the construction and the product quality checklist, it is
important to be included in the project management processes, because the quality management
will help construction to remain up to the mark in terms of the quality of the product such as
bars, cement, and other important construction materials. Here in the next group of the project
management plan, risk management is crucial to be involved, because this plan is important to
reflect upon the needs of the land used, and risk management plan helps control and monitor the
risks involved during the construction (Nasir, 2015).
In a civil engineering project, the land is a crucial part and an important aspect of construction. It
is because the land is the part of the structure, which takes up all the load of the house, hence in
the construction purposes, quality of the materials and quality of the soil of the land take up a
crucial part in it. The moisture is so selected, that the land in the quality of soil should be limited,
as more moisture loosen up the soil present in it.
b. Choose the best builder
In the earlier part, we have discussed the importance of the construction and the section of the
land and soil. Hence if we consider the project management processes useful in choosing the
builder, here in choosing the builder for the construction scope management plan and product
quality processes can be useful, because the quality of equipment's and labors it would have will
be tested and will help in choosing the project chart (Hegazy, 2013).
The change request and the deliverables will be considered for the quality of the raw materials
and in choosing up the builder. The product quality checklist will be crucial in checking up the
important activities involved in the builder project. Change request process also can be useful
here, in this case, because it can help in requesting the change in a labor or the raw material
useful, once the policies are set and construction starts. In the construction processes, in
Australia, and each country has a set standard of the raw materials used for the construction
purpose, hence client needs to check the whether the standard of the raw material builders uses in
its previous project with the standard of equipment it uses, are according to the standardization of
process of PMBOK or not, if not then in such case change or choosing a builder in middle of the
construction process will be helped by processes such as change request.
Document Page
c. Identify the stakeholders for the project
During the selection of the stakeholders, it is quite important to note that the scope management
plan will be considered in the selection and identification of the stakeholders. Stakeholders are
the one who is effective to the profit and loss over the construction, hence the scope with which
the construction project is going on will be considered for the stakeholder and its identification
for numerous risks which can be avoided through the correct stakeholders.
The quality management plan is also useful in identifying the stakeholders, as during choosing
process of raw material suppliers, it is important to consider such planning processes and the
quality of the product use should be included also.
In the process of risk management, it is used, as risk management processes or plan helps
manage the risks involved in construction such as financial risks, and other risks such as
supplier risk and raw material quality risks.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2. What are the factors that will influence the design and layout of your dream home?
Product and budget: It is important to note that the selected land is affected by the budget set
by the client. The layout of the dream is also affected by the nature of the product. The layout is
established according to the nature of the product. It is important to note that the nature and the
usage of the house are also affected by the layout. It is important to note here that the selected
land should be included in it.
The budget also describe and affect the layout of the house. Here in this case, once the layout is
set, the factors affected such as the direction of the wind and the nature of the weather will
describe the layout of the house. It is because the windows of the house will be set into the layout
of the house, which will be applicable according to the wind blowing. The architects are also
affected by the layout set by the land and the described raw materials useful in the house or
suburb, which is affected by the architects, who are dependent on to the project. the budget set
will also be considered in the project charter. Budget is involved in it because with the project
charter, the selection of the land for the suburb including the layout and size will depend on to
the budget set by the client.
Policies of the management: The policies applicable of the management, will describe the plant
layout so that the selected plant has some policies which will be important to understand the
policies useful in the management processes. Policies of management will understand all the
policies regarding the raw material useful for the layout of the process. There are numerous
cement and steel bars useful will describe the policies selected in the description of the
topography and the contours. The policies will also describe how the climatic conditions of the
construction field of the house will include in the construction process selected under the
policies.
Explain the project management processes you used to determine the design/layout.
The products which are useful in the construction process will be useful, hence here the product
quality checklist and the project scope managing process describes the land and size of the
layout. The scope management plan and the product checklist are helpful in the description of the
management plan. The product checklist and quality management plan are useful in monitor the
project client and the scope management plan is also helpful in manage the scope of the project
Document Page
management plan. The stakeholders which are chosen will describe the checklist according to the
Gantt chart set by the completed guidelines set by the formed raw materials.
In the factors useful in the change request and the deliverables, all the management in the
change request and the deliverables will describe the construction processes, which will
describe the process of the soil useful in the construction. The quality or moisture of the soil,
which will be used to describe the process of the quality checklist, will be useful in the product
quality checklist.
The project procurement process and the change request process help manage the choice of the
best builder for the construction process because the chosen builder is not able to fulfill l the
demand of the client, the change request will help determine the alternative option for the
builder.
While the site is selected, it is important to consider the procurement processes involved along
with the quality management plan which can help manage the planning process and the
execution process of the modified project change request. In the earlier tasks in the described
selection of the layout, quality and risk-managed processes are important, as it can identify any
risk due to the selection of the stakeholder or use of a raw material not standardized by the
organization.
There are many crucial or important civil aspects should be considered during the selection or
the construction. In such civil aspects and standards, quality management and product quality
checklist is quite a useful project managed process helpful in managing the project proportion.
The quality of the soil, the moisture content in the soil and the layout process involving the set
layout, which should not create any risk in the description of the change in the proportion for the
addition or removal or rooms or any area of the project. The change request and the deliverables
will be considered for the quality of the raw materials and in choosing up the builder. The
product quality checklist will be crucial in checking up the important activities involved in the
builder project (Du, 2012).
The project quality checklist and the project status report are some of the key aspects, which are
included in the project management process of construction of a house. The change request
process under execution process is important to monitor any change given in the project
Document Page
proportion with the reflection of the change request process, available for the set layout standard,
in the quality management process for providing extra strength to the concrete used in the
construction.
The project status report, which is in the monitoring part of the Project management book of
knowledge, is important to monitor the key project management processes involved according to
the set standard and suppliers. The reflected project status report is the key included in the
project management process, will be monitored by the project status report. This project status
report is important in managing the raw materials and the deliverables, in the field of
construction such as equitable raw materials and good quality of equipment used for the
construction. In the deliverable process, under execution process, all the raw materials and the
equipment should be included in the project discussion boards. It is quite important to note here
that the project management processes should be involved in the department of the construction
so that the quality and all the processes can be involved in the execution plan available for the
project management planning and construction. There is some important part in the construction
which will be useful in describing the key project management processes including in the
guidance of PMBOK, which says project management processes will help manage the project of
construction quite well.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
3. Explain how you would implement lean best practices to achieve lean project
management for (1) and (2) above.
In various project management process, lean project managing processes are important processes
to be included in the construction so that the tools can be useful in managing time and money to
be spent on to the project client. There are various processes or ways in which a lean project
management processes can be implemented, these practices stabilize the business partners, and
other processes so that the flow of should not be hampered. The lean project management
processes are quite smooth and it helps the construction management to be smooth enough so
that the tasks which are linked with the project management practices in the construction of the
house can be established, in emphasizing the loans available from the government (Moore,
2013).
The lean practices which can be useful in the construction management are, value stream
mapping, poke yoke and mistake-proofing, these are some of the key lean management
practices which can be applicable and can be included in the process of the construction. Poke
yoke which is a lean project management process, rely on the fact that humans do commit
mistakes, and it monitors the mistakes made by the management during the construction. It is
hence helpful in managing the mistakes, under management processes and facts.
In the elimination of waste, it saves money, and wastage during the construction processes, if
increased, might create risks of financial instability and bad land management, hence elimination
of waste, within the process of the construction is quite useful in managing project management
processes , under project status report which is quite helpful in managing the important part in
the project management processes involved.
Document Page
Conclusion
This particular assignment had explained how lean project management practices can be useful
by applicating it under various project management processes. The project status report is quite
crucial in understanding the fact that the project management processes which is important to be
involved under various process of planning and other important part of the project management
process should be included in the process of construction, and how they are useful is explained
completely.