PPMP20009 LEADING LEAN PROJECTS
Page | 1
Page | 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
Introduction......................................................................................................................................3
1. Select and explain the project management processes under PMBOK....................................4
a. Choosing the suburb and deciding the land size...................................................................4
b. Choosing the right builder for the new dream home............................................................5
c. Identification of stakeholders...............................................................................................6
2. What are the factors that will influence the design and layout of your dream home? Explain
the project management processes you used to determine the design/layout..................................7
2.1 What are the factors that will influence the design and layout of your dream home?...........7
2.2 Explain the project management processes you used to determine the design/layout...........8
Explain how you would implement lean best practices to achieve lean project management for
(1) and (2) above............................................................................................................................11
Conclusion.....................................................................................................................................13
References......................................................................................................................................14
Page | 2
Introduction......................................................................................................................................3
1. Select and explain the project management processes under PMBOK....................................4
a. Choosing the suburb and deciding the land size...................................................................4
b. Choosing the right builder for the new dream home............................................................5
c. Identification of stakeholders...............................................................................................6
2. What are the factors that will influence the design and layout of your dream home? Explain
the project management processes you used to determine the design/layout..................................7
2.1 What are the factors that will influence the design and layout of your dream home?...........7
2.2 Explain the project management processes you used to determine the design/layout...........8
Explain how you would implement lean best practices to achieve lean project management for
(1) and (2) above............................................................................................................................11
Conclusion.....................................................................................................................................13
References......................................................................................................................................14
Page | 2

Introduction
Lean project management refers to the practice of lean principles in projects by using data-driven
methods with the emphasis of continuous improvement in processes. Lean management in
projects is highly useful for the manufacturing projects in which product or service is developed.
The report will provide an overview of the significance of implementing project management
processes in different phases of a project. The report will develop a project for developing a new
home in Australia. For this, the report will implement project management processes in choosing
the suburb, land size and most suitable builder for the new home. It will also identify project
stakeholders. It will analyze the factors affecting the dream home’s design and layout. At last, it
will require the implementation of best lean practices for attaining the lean project management
in this project.
Page | 3
Lean project management refers to the practice of lean principles in projects by using data-driven
methods with the emphasis of continuous improvement in processes. Lean management in
projects is highly useful for the manufacturing projects in which product or service is developed.
The report will provide an overview of the significance of implementing project management
processes in different phases of a project. The report will develop a project for developing a new
home in Australia. For this, the report will implement project management processes in choosing
the suburb, land size and most suitable builder for the new home. It will also identify project
stakeholders. It will analyze the factors affecting the dream home’s design and layout. At last, it
will require the implementation of best lean practices for attaining the lean project management
in this project.
Page | 3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

1. Select and explain the project management processes under PMBOK.
Project management considers as a significant part of the project required for project success.
Project management is the concept of implementing certain functions such as initiation,
planning, execution, controlling and closure of project at a pre-determined time within specific
criteria. The main aim of project management identifies as the attainment of project goals and
objectives effectively and efficiently (Steinman, 2017). As per the PMBOK guide, the process of
project management is grouped into 5 categories named initiation, planning, execution,
controlling and closure. PMBOK has provided numerous processes for project management as
per the suitability of activities. In this report, the project management processes would help in
choosing the right suburb, land size and builder for the new home.
a. Choosing the suburb and deciding the land size
Moving to a new city in Australia and choosing the suburb and deciding the land size is a
complicated and time-consuming process. Building a dream home in an Australian suburb
requires a huge amount of research and time. For this purpose, the project management process
will include:
Initiation: In this phase, a project charter will develop for defining the scope, stakeholders, and
objectives of the project. For the current purpose, the main objective of the project is to select a
suburb and land size for the new dream home. The project scope is to research and identify all
the suburbs, estimating the costs, considerations while deciding the land size and choosing the
most suitable land size and suburb (Kumaraswamy, et. al., 2017). In this project charter, key
considerations while choosing the right suburb would be taken into account such as local
amenities, suitability as per personal requirement, social demographics and safety and so on.
Planning: In this phase, the definition of activities, cost estimation, quality management plan
and resource management would be considered. These activities would use for choosing the
suitable land size for the new dream home. The definition of activities would include what
activities would be required for deciding the land size. These activities would include the
location of land, members to be lived, home size and at last the availability of financial
resources. It should be considered while deciding on the land size that land size also depends on
the type of building that would be developed. In this case, the land size would determine as per
Page | 4
Project management considers as a significant part of the project required for project success.
Project management is the concept of implementing certain functions such as initiation,
planning, execution, controlling and closure of project at a pre-determined time within specific
criteria. The main aim of project management identifies as the attainment of project goals and
objectives effectively and efficiently (Steinman, 2017). As per the PMBOK guide, the process of
project management is grouped into 5 categories named initiation, planning, execution,
controlling and closure. PMBOK has provided numerous processes for project management as
per the suitability of activities. In this report, the project management processes would help in
choosing the right suburb, land size and builder for the new home.
a. Choosing the suburb and deciding the land size
Moving to a new city in Australia and choosing the suburb and deciding the land size is a
complicated and time-consuming process. Building a dream home in an Australian suburb
requires a huge amount of research and time. For this purpose, the project management process
will include:
Initiation: In this phase, a project charter will develop for defining the scope, stakeholders, and
objectives of the project. For the current purpose, the main objective of the project is to select a
suburb and land size for the new dream home. The project scope is to research and identify all
the suburbs, estimating the costs, considerations while deciding the land size and choosing the
most suitable land size and suburb (Kumaraswamy, et. al., 2017). In this project charter, key
considerations while choosing the right suburb would be taken into account such as local
amenities, suitability as per personal requirement, social demographics and safety and so on.
Planning: In this phase, the definition of activities, cost estimation, quality management plan
and resource management would be considered. These activities would use for choosing the
suitable land size for the new dream home. The definition of activities would include what
activities would be required for deciding the land size. These activities would include the
location of land, members to be lived, home size and at last the availability of financial
resources. It should be considered while deciding on the land size that land size also depends on
the type of building that would be developed. In this case, the land size would determine as per
Page | 4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

the residential building construction. Using cost estimation, the total cost would be calculated
regarding the acquisition of land. The quality management plan would assist in ensuring the
acquisition of land having good quality within the estimated cost (Corona-Suarez, et. al., 2014).
This quality management plan would test the soil for ensuring adequate land quality. The
resource management plan would include the availability of finance and human resources for the
acquisition of land with adequate size and quality.
b. Choosing the right builder for the new dream home
Construction of a building, whether residential or commercial or others, has always been a
complex process. An individual invests a huge amount of money for building his dream home.
While selecting the right builder, an individual must take into account certain considerations.
These considerations would ensure the construction of a dream house as per the requirements
and quality and would make sure to justify the investment in the builder and dream home project.
The project of choosing the most appropriate builder for the new dream home would undertake
in the execution phase.
In choosing the right builder, the processes such as manage project knowledge, quality
management, team development, communication management and managing stakeholder
engagement would adopt. While choosing the right builder, it is necessary to research the
availability of options available as builders (Walker, 2016). Therefore, project knowledge
management would help in enhancing knowledge about different builders so that the best
builder can select. Using quality management, the builder has the best quality work would be
identified and contracted.
The team development process would enable in bringing the best builder for the construction of
a dream home. The communication management process would assist in maintaining
communication with the chosen builder and asking all the queries with the builder so that
transparency can be maintained. It would further help in bringing synchronization in the
communication between the builder and other stakeholders. When a house is built, numerous
stakeholders are engaged such as builder, architects, labourers, electrician, decorator, painter,
suppliers, site supervisor and facilities manager and so on (Oppong, et. al., 2017). Using
stakeholder engagement management, the builder would ensure to manage communication and
coordination among all the individual groups identified as the stakeholders.
Page | 5
regarding the acquisition of land. The quality management plan would assist in ensuring the
acquisition of land having good quality within the estimated cost (Corona-Suarez, et. al., 2014).
This quality management plan would test the soil for ensuring adequate land quality. The
resource management plan would include the availability of finance and human resources for the
acquisition of land with adequate size and quality.
b. Choosing the right builder for the new dream home
Construction of a building, whether residential or commercial or others, has always been a
complex process. An individual invests a huge amount of money for building his dream home.
While selecting the right builder, an individual must take into account certain considerations.
These considerations would ensure the construction of a dream house as per the requirements
and quality and would make sure to justify the investment in the builder and dream home project.
The project of choosing the most appropriate builder for the new dream home would undertake
in the execution phase.
In choosing the right builder, the processes such as manage project knowledge, quality
management, team development, communication management and managing stakeholder
engagement would adopt. While choosing the right builder, it is necessary to research the
availability of options available as builders (Walker, 2016). Therefore, project knowledge
management would help in enhancing knowledge about different builders so that the best
builder can select. Using quality management, the builder has the best quality work would be
identified and contracted.
The team development process would enable in bringing the best builder for the construction of
a dream home. The communication management process would assist in maintaining
communication with the chosen builder and asking all the queries with the builder so that
transparency can be maintained. It would further help in bringing synchronization in the
communication between the builder and other stakeholders. When a house is built, numerous
stakeholders are engaged such as builder, architects, labourers, electrician, decorator, painter,
suppliers, site supervisor and facilities manager and so on (Oppong, et. al., 2017). Using
stakeholder engagement management, the builder would ensure to manage communication and
coordination among all the individual groups identified as the stakeholders.
Page | 5

c. Identification of stakeholders
Stakeholders in the project are the people or group of people required for the management and
completion of the project. In other words, stakeholders are the individuals who have an interest
in the project or gain or lose something like the project outcomes. In the project of dream home
construction, the stakeholders need to be identified and the project can be completed as per the
expectations For this purpose, the key project management processes such as identification of
stakeholders, planning the stakeholder engagement, management of stakeholder engagement and
monitoring the stakeholder management. Using the process of stakeholder identification, the
stakeholders of the current project would identify as contractors, suppliers, architects, labourers,
and painters and so on (Mok, et. al., 2015). This process would be undertaken based on inputs,
tools & techniques and outputs.
The stakeholder engagement plan would assign the roles and responsibilities to the stakeholders
as well as considering their expectations with this project. Under managing stakeholder
engagement, it would ensure the stakeholder commitment and expectations at all the project
levels. It would also include the development of strategies for ensuring stakeholder engagement
at all project levels. Monitoring stakeholder engagement would include identifying issues and
concerns of stakeholders and integrate modifications in strategies of stakeholder engagement.
These project management processes would help in the achievement of certain tasks essential for
the house construction project. Choosing the right suburb, deciding the correct land size and
selecting the best builder for the new dream house all these activities are complex and need
serious considerations while undertaking (Damian Fearon, et. al., 2013). It is because these
activities would provide a foundation for the construction of a new house. Therefore, it has
become necessary for these activities to be undertaken effectively and due to this, the project
management processes are used for strengthening these activities and integrate efficiency.
Page | 6
Stakeholders in the project are the people or group of people required for the management and
completion of the project. In other words, stakeholders are the individuals who have an interest
in the project or gain or lose something like the project outcomes. In the project of dream home
construction, the stakeholders need to be identified and the project can be completed as per the
expectations For this purpose, the key project management processes such as identification of
stakeholders, planning the stakeholder engagement, management of stakeholder engagement and
monitoring the stakeholder management. Using the process of stakeholder identification, the
stakeholders of the current project would identify as contractors, suppliers, architects, labourers,
and painters and so on (Mok, et. al., 2015). This process would be undertaken based on inputs,
tools & techniques and outputs.
The stakeholder engagement plan would assign the roles and responsibilities to the stakeholders
as well as considering their expectations with this project. Under managing stakeholder
engagement, it would ensure the stakeholder commitment and expectations at all the project
levels. It would also include the development of strategies for ensuring stakeholder engagement
at all project levels. Monitoring stakeholder engagement would include identifying issues and
concerns of stakeholders and integrate modifications in strategies of stakeholder engagement.
These project management processes would help in the achievement of certain tasks essential for
the house construction project. Choosing the right suburb, deciding the correct land size and
selecting the best builder for the new dream house all these activities are complex and need
serious considerations while undertaking (Damian Fearon, et. al., 2013). It is because these
activities would provide a foundation for the construction of a new house. Therefore, it has
become necessary for these activities to be undertaken effectively and due to this, the project
management processes are used for strengthening these activities and integrate efficiency.
Page | 6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

2. What are the factors that will influence the design and layout of your dream home?
Explain the project management processes you used to determine the design/layout.
2.1 What are the factors that will influence the design and layout of your dream home?
Developing a design and layout of the dream home requires significant focus and considerations
for making it sustainable in future. It has become a complicated task to plan the designing and
layout of the dream home for ensuring its efficiency, effectiveness and sustainable as well.
Therefore, for the project of dream home construction, the following considerations would be
determined:
Firstly, the most considerable aspect while determining the house design and layout has been
identified as the latest trends. The design and layout should be according to the latest trends so
that the house may look trendy and new. Using the latest trends, the house construction may
undertake as per the requirements and using the latest construction styles for the house. It is
because the latest construction styles ensure the attainment of high quality.
Flexibility should integrate into the house design and layout for attaining sustainability and
efficiency. Every house when originally built gets modified after some years either for
renovation or expansion. Therefore, it should be considered that the house facilities should be
designed in a way that can enable future expansion (Ozturk, et. al., 2016). It is necessary to
integrate flexibility in house design and layout due to changing production needs and changing
house trends. Redesigning is vital for the house when planned for renovation or future expansion.
But the original design and layout should ensure the minimum changes since redesigning is a
complex and expensive task.
One factor that needs to be considered while developing the house design and layout has been
identified as convenient materials handling. While constructing a house, numerous materials
such as raw materials, containers and equipment are used. The design and layout of the house
should develop in a way that these materials should be handled safely and conveniently. Such
design and layout are vital for the material handling process operating in an efficient and orderly
manner. Contrary to this, inefficient material handling would lead to high-cost incurrence,
increased wastage and delayed project completion.
Page | 7
Explain the project management processes you used to determine the design/layout.
2.1 What are the factors that will influence the design and layout of your dream home?
Developing a design and layout of the dream home requires significant focus and considerations
for making it sustainable in future. It has become a complicated task to plan the designing and
layout of the dream home for ensuring its efficiency, effectiveness and sustainable as well.
Therefore, for the project of dream home construction, the following considerations would be
determined:
Firstly, the most considerable aspect while determining the house design and layout has been
identified as the latest trends. The design and layout should be according to the latest trends so
that the house may look trendy and new. Using the latest trends, the house construction may
undertake as per the requirements and using the latest construction styles for the house. It is
because the latest construction styles ensure the attainment of high quality.
Flexibility should integrate into the house design and layout for attaining sustainability and
efficiency. Every house when originally built gets modified after some years either for
renovation or expansion. Therefore, it should be considered that the house facilities should be
designed in a way that can enable future expansion (Ozturk, et. al., 2016). It is necessary to
integrate flexibility in house design and layout due to changing production needs and changing
house trends. Redesigning is vital for the house when planned for renovation or future expansion.
But the original design and layout should ensure the minimum changes since redesigning is a
complex and expensive task.
One factor that needs to be considered while developing the house design and layout has been
identified as convenient materials handling. While constructing a house, numerous materials
such as raw materials, containers and equipment are used. The design and layout of the house
should develop in a way that these materials should be handled safely and conveniently. Such
design and layout are vital for the material handling process operating in an efficient and orderly
manner. Contrary to this, inefficient material handling would lead to high-cost incurrence,
increased wastage and delayed project completion.
Page | 7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Legislation plays a vital role while constructing the design and layout of the new house. Certain
legislations and laws have developed in Australia for regulating the building constructions.
These laws and legislations may vary as per the building type whether commercial, shopping
malls or residential building. Non-compliance of these legislations and laws may make the
contractor or builder liable for the huge penalties and fines. Non-compliance directly leads to
raising a big question on the safety and protection of individuals living or working in the
building. Therefore, the design and layout of the new dream home should be constructed
according to the requirements of the Australian construction laws.
Sustainability is significant for the commercial as well as residential buildings. It has become an
essential component that should be integrated within the house design and layout. The
construction should be undertaken in a way that it can exhibit the least harm to the society and
environment (Yu, et. al., 2019). And the construction is undertaken as per the design and layout
developed for the house. In another way, the house construction must be undertaken in a way
that it can be suitable for the environment and society. Therefore, sustainability in house
construction can attain by integrating it in the house layout and design.
While constructing a house, numerous processes need to be undertaken. These processes involve
framing, roofing, foundation construction, plumbing, painting, electrical, windows and doors
installation, and siding and many more. These processes require an easy flow of movement so
that effective and efficient construction can attain. When processes face difficulties in
movement, the construction has to deal with confusions, waste increment and high costs. Hence,
the house design and layout should facilitate the convenient and rapid flow of processes
movement.
2.2 Explain the project management processes you used to determine the design/layout.
Developing the house design and layout is an important task in the house construction project.
As provided by PMBOK, different project management processes may use for the effective
management of project aimed at appropriate house design and layout. Numerous factors have
identified that would influence the dream house design and layout. These factors are determined
considering the project management processes. Some of these processes have identified for
undertaking this task effectively.
Page | 8
legislations and laws have developed in Australia for regulating the building constructions.
These laws and legislations may vary as per the building type whether commercial, shopping
malls or residential building. Non-compliance of these legislations and laws may make the
contractor or builder liable for the huge penalties and fines. Non-compliance directly leads to
raising a big question on the safety and protection of individuals living or working in the
building. Therefore, the design and layout of the new dream home should be constructed
according to the requirements of the Australian construction laws.
Sustainability is significant for the commercial as well as residential buildings. It has become an
essential component that should be integrated within the house design and layout. The
construction should be undertaken in a way that it can exhibit the least harm to the society and
environment (Yu, et. al., 2019). And the construction is undertaken as per the design and layout
developed for the house. In another way, the house construction must be undertaken in a way
that it can be suitable for the environment and society. Therefore, sustainability in house
construction can attain by integrating it in the house layout and design.
While constructing a house, numerous processes need to be undertaken. These processes involve
framing, roofing, foundation construction, plumbing, painting, electrical, windows and doors
installation, and siding and many more. These processes require an easy flow of movement so
that effective and efficient construction can attain. When processes face difficulties in
movement, the construction has to deal with confusions, waste increment and high costs. Hence,
the house design and layout should facilitate the convenient and rapid flow of processes
movement.
2.2 Explain the project management processes you used to determine the design/layout.
Developing the house design and layout is an important task in the house construction project.
As provided by PMBOK, different project management processes may use for the effective
management of project aimed at appropriate house design and layout. Numerous factors have
identified that would influence the dream house design and layout. These factors are determined
considering the project management processes. Some of these processes have identified for
undertaking this task effectively.
Page | 8

Quality management: Quality is a vital component of house construction since it provides a
foundation for sustainability. In project management, quality management considers as one of
the strong pillars for the project. Factors such as sustainability, latest trends, and easy flow of
movement are considered as a part of quality management in house construction projects
(Ceptureanu, et. al., 2017). Quality management ensures that the project is using correct and
adequate materials for the construction. Quality management also involves certain types of
testing processes for raw materials and design. Quality management will be undertaken in the
execution phase.
Project Charter: Project charter is the most primary process in project management. While
determining the factors, project charter has helped in defining project vision, project objectives
and the entire project structure. The factors have been determined regarding the house design and
layout. House design and layout is a significant part of house construction and project charter
helps in focusing on key points which should be considered in this project. Project charter has
assisted in maintaining synchronization with the project objectives, project scope and project
implementation plan.
Definition of activities: With defining activities, the factors identified affecting the house design
and layout have helped in defining some significant activities for the house construction. These
factors such as adopting sustainability and free flow of processes movement and material
handling can be considered as project activities (Desmond, 2014). Defining activities in planning
phase provide a foundation to other management processes of the project. These processes are
cost estimation, project scheduling and project control and so on. These processes are undertaken
when activities are clearly defined in project planning.
Management of project knowledge: Project knowledge involves current project and individual
knowledge as well as developing new knowledge for making improvements in the project
outcomes and future project stages (Michelle Burger & Benita Zulch, 2018). Determining factors
for the project design and layout has followed the project knowledge process for enhancing
knowledge about the house design and layout.
Scope management plan: In this process, the project scope is identified and planned effectively
during the planning phase. The project scope involves project structure, project activities, aims,
Page | 9
foundation for sustainability. In project management, quality management considers as one of
the strong pillars for the project. Factors such as sustainability, latest trends, and easy flow of
movement are considered as a part of quality management in house construction projects
(Ceptureanu, et. al., 2017). Quality management ensures that the project is using correct and
adequate materials for the construction. Quality management also involves certain types of
testing processes for raw materials and design. Quality management will be undertaken in the
execution phase.
Project Charter: Project charter is the most primary process in project management. While
determining the factors, project charter has helped in defining project vision, project objectives
and the entire project structure. The factors have been determined regarding the house design and
layout. House design and layout is a significant part of house construction and project charter
helps in focusing on key points which should be considered in this project. Project charter has
assisted in maintaining synchronization with the project objectives, project scope and project
implementation plan.
Definition of activities: With defining activities, the factors identified affecting the house design
and layout have helped in defining some significant activities for the house construction. These
factors such as adopting sustainability and free flow of processes movement and material
handling can be considered as project activities (Desmond, 2014). Defining activities in planning
phase provide a foundation to other management processes of the project. These processes are
cost estimation, project scheduling and project control and so on. These processes are undertaken
when activities are clearly defined in project planning.
Management of project knowledge: Project knowledge involves current project and individual
knowledge as well as developing new knowledge for making improvements in the project
outcomes and future project stages (Michelle Burger & Benita Zulch, 2018). Determining factors
for the project design and layout has followed the project knowledge process for enhancing
knowledge about the house design and layout.
Scope management plan: In this process, the project scope is identified and planned effectively
during the planning phase. The project scope involves project structure, project activities, aims,
Page | 9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

objectives, processes, stakeholders and cost estimation and other activities. As per PMBOK,
scope management plan helps in ensuring that all the project processes required for the project
compaction have been beneficially identified. It also helps in excluding all the works which are
irrelevant and not required by the project. Using the process of the scope management plan, the
factors have identified that can be integrated while developing the design and layout for the new
dream house (Derenskaya, 2018). These factors have helped in determining what to include in
the house design and layout.
Consideration of these factors has been necessary for this project since these factors affect not
only in positive but also in a negative context. The identified factors need to be integrated into
house design and layout for attaining sustainability, wastage reduction and overrunning of costs
and so on. Therefore, project management processes have been used for ensuring the
identification of all the essential factors.
Page | 10
scope management plan helps in ensuring that all the project processes required for the project
compaction have been beneficially identified. It also helps in excluding all the works which are
irrelevant and not required by the project. Using the process of the scope management plan, the
factors have identified that can be integrated while developing the design and layout for the new
dream house (Derenskaya, 2018). These factors have helped in determining what to include in
the house design and layout.
Consideration of these factors has been necessary for this project since these factors affect not
only in positive but also in a negative context. The identified factors need to be integrated into
house design and layout for attaining sustainability, wastage reduction and overrunning of costs
and so on. Therefore, project management processes have been used for ensuring the
identification of all the essential factors.
Page | 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Explain how you would implement lean best practices to achieve lean project management
for (1) and (2) above.
Lean practices in lean project management hold a significant place in the success of project
management. These practices help organizations or individuals undertaking a lean project with
the ability of efficiency enhancement, productivity increment and wastage reduction. In this big
project, different sub-projects would be managed by applying project management processes.
Implementation of certain lean practices would enhance the effectiveness and efficiency of the
entire project.
Firstly, the identification of stakeholders is significant for any project as who would be the
stakeholders of this project. It would assist in understanding their role and responsibility in this
project life cycle (Xue, et. al., 2018). It is because the stakeholders are the supporters of project
success and they help in attaining project objectives and vision more productively.
In this project, the most significant resource for building a new dream home would be finance
and people. There would be a need for resource management in which resources are estimates,
acquired, managed, and controlled. It would help in building a new dream home within the
available resources such as finance. It would use during the project of deciding the suburb and
land size and choosing the best builder.
Identifying constraints and risks are significant for any project success. In this project, the
project manager would require emphasizing on the risks and constraints pertained to the house
construction. These risks and constraints are the barriers to attaining higher efficiency in a house
construction project. These risks and constraints when not identified and controlled on time may
lead to damage the project efficiency and success.
Value stream mapping considers a vital lean practice for project management. Value stream
mapping refers to the visual representation of the project activities and management at the
current and desired state. With value stream mapping, the project activities are visually
represented that are required for the project completion in a way that it can enhance overall value
(Matt, 2014). This practice would help the house construction project to identify all the necessary
Page | 11
for (1) and (2) above.
Lean practices in lean project management hold a significant place in the success of project
management. These practices help organizations or individuals undertaking a lean project with
the ability of efficiency enhancement, productivity increment and wastage reduction. In this big
project, different sub-projects would be managed by applying project management processes.
Implementation of certain lean practices would enhance the effectiveness and efficiency of the
entire project.
Firstly, the identification of stakeholders is significant for any project as who would be the
stakeholders of this project. It would assist in understanding their role and responsibility in this
project life cycle (Xue, et. al., 2018). It is because the stakeholders are the supporters of project
success and they help in attaining project objectives and vision more productively.
In this project, the most significant resource for building a new dream home would be finance
and people. There would be a need for resource management in which resources are estimates,
acquired, managed, and controlled. It would help in building a new dream home within the
available resources such as finance. It would use during the project of deciding the suburb and
land size and choosing the best builder.
Identifying constraints and risks are significant for any project success. In this project, the
project manager would require emphasizing on the risks and constraints pertained to the house
construction. These risks and constraints are the barriers to attaining higher efficiency in a house
construction project. These risks and constraints when not identified and controlled on time may
lead to damage the project efficiency and success.
Value stream mapping considers a vital lean practice for project management. Value stream
mapping refers to the visual representation of the project activities and management at the
current and desired state. With value stream mapping, the project activities are visually
represented that are required for the project completion in a way that it can enhance overall value
(Matt, 2014). This practice would help the house construction project to identify all the necessary
Page | 11

activities and mapping them in a way that they can be accomplished in a sequential and timely
manner.
As per the lean principles and practices, communication is significant universally for the
organizations as well as individuals. In project management, communication acts as the blood to
a body by undertaking a continuous flow of information. Communication provides an open
platform for the project stakeholders and management for information sharing. In lean project
management, many times the processes and operations flow may get interrupted due to the
irregular or disturbed flow of information. Therefore, for practising lean principles, there should
a fostering of communication culture where individuals are free for communicating with each
other.
Continuous improvement refers to an ongoing process for improving the products, services and
processes. In lean project management, this process includes efforts for improving the processes
and outcomes of the house construction project (Peter, et. al., 2013). Also, in this project, the
continuous improvement would aim for the improvement of not only the processes but also the
people working on the project. Improving people would indicate to provide ongoing learning and
training opportunities to people over the project lifecycle. It would help in enhancing the
productivity of the people and ensuring quality development of dream house.
Page | 12
manner.
As per the lean principles and practices, communication is significant universally for the
organizations as well as individuals. In project management, communication acts as the blood to
a body by undertaking a continuous flow of information. Communication provides an open
platform for the project stakeholders and management for information sharing. In lean project
management, many times the processes and operations flow may get interrupted due to the
irregular or disturbed flow of information. Therefore, for practising lean principles, there should
a fostering of communication culture where individuals are free for communicating with each
other.
Continuous improvement refers to an ongoing process for improving the products, services and
processes. In lean project management, this process includes efforts for improving the processes
and outcomes of the house construction project (Peter, et. al., 2013). Also, in this project, the
continuous improvement would aim for the improvement of not only the processes but also the
people working on the project. Improving people would indicate to provide ongoing learning and
training opportunities to people over the project lifecycle. It would help in enhancing the
productivity of the people and ensuring quality development of dream house.
Page | 12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.