PPMP20009 Leading Lean Projects
Name
Student number
Campus
Tutor name
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Document Page
Introduction
This assessment is based on the topic of leading lean project which reflects the implementation
process of lean project management to build dream home. This assessment represents the
identification process of suburb appropriate for building dream home along with the description
of the land size in reference with budget that could be spend on the selected land. Apart from
this, the assessment also demonstrates market research and identification process of potential
home builders for further efficiently carrying out construction process of dream home project.
Moreover, the assessment is develop on the basis of project management process which further
reflects stakeholders required within the project, factors that influence design and layout of
dream home project along with the explanation of best lean practices and their implementation
for efficiently accomplishing lean project management of the dream home project.
Document Page
1. Select and explain the project management processes (either from
PMBOK or PRINCE2 or a combination of any best practices you have
learned in this unit) that can help you:
The project management process of PRINCE2 is undertaken in consideration in the project of
dream home as this project management process is appropriate for dream home project as this
process is generally regarded as flexible method that provides effective guidance for efficiently
managing successful project management and also enables to meet certain specific requirements
within project. PRINCE2 project management process generally reflects structure project
management method which further emphasis to divide project into controllable and manageable
stages as it supports project success (Sohi, et. al., 2016). The seven processes of PRINCE2 is an
effective process which undertake the consideration of effective and success flow of dream home
project process as stated below:
a. Choose the Suburb and decide the land size to buy.
The best and most appropriate suburb for the establishment and development of dream home
project is Northam in Western Australia as this suburb is regarded as one of the best suburb in
Midland. The start-up project process of PRINCE2 undertake the consideration of this
perspective as this process includes a project brief which reflects business caser, best way to do
the project, detailed stage plan and initiation stage of the dream home project which further
support in selecting best suburb for the project execution. Moreover, Northam is regarded
appropriate for the dream home project as it consist efficient medical facilities, neighbourly
spirit, less traffic, peace and quiet environment which further supports it as one of the best
suburb in Australia. The people that mostly found in the suburb area are families with kids,
country lovers, singles, professional and retirees which makes the area as friendly and helpful
(López, et. al., 2012).
Apart from this, Northam consist independent lifestyle and the suburb also sustain effective
public convenience along with the availability of parks, hospitals and supermarkets which
reflects it as ideal suburb for people who generally seek for independent, friendly and helpful
area and also for developing dream home project. Moreover, Northam is also regarded as city
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
that sustain peaceful atmosphere along with the facilities of train and bus for travelling other city
sides. For the dream home project, Northam is most appropriate as it provides beautiful
localities, parklands and pleasant environment for people.
Decision of Land Size
The process of initiating the project of PRINCE2 undertake the consideration of this decision as
this process decide the land size through identifying aspects such as project scope, requirement,
budget and risks. Moreover, the most appropriate land size that could be decided for the dream
home project in the selected suburb is 1087m2 as this decision is dependent on the price of the
properties as this aspect directly impacts the overall project execution and budget. Apart from
this, the land size of 1087m2 is decided as this land is appropriate for the dream home project as
this land size enables to develop the dream home with standard quality. The land size also
consist the potential of price about $295,000 which falls under budget of the dream home project
(Browning, et. al., 2015).
b. Choose the best builder
The directing process of PRINCE2 enables the dream home project of choose the best builders as
this process review the overall project and decide the requirement of builder within the project
operation and execution for ensuring project success. The directing process of PRINCE2
generally reflects professional and general construction builders as most appropriate for the
dream home project as the profession builder within the project consist the role of monitoring
project specification, project design, maintenance of project schedule and considering overall
analysis of project along with proper inspection of project operation and process. Moreover,
general construction builder are required within the project as they plays an efficient role
conducting building work of the dream home project, analyse the major scope and requirement
of project and they are also consider as overall workforce of the dream home project which
ensure the operation and execution project. Thus both profession and general construction
builders are decided for the dream home project as these builders monitor the overall project
along with the consideration of quality within the construction process of the dream home project
(Roy, et. al., 2018).
Document Page
c. Identify the stakeholder for the project
The controlling stage of PRINCE2 is regarded an efficient stage of the project management
process as it states the aspects which further reflects stakeholders for the dream home project.
The controlling stage states the individual role within the project and its operation and it also
further determines the authorised and distributed action undertaken by each stakeholders within
the project. Moreover, the stakeholders that are identified within the dream project reflect to
client which direct the project and its development, project team which consist project manager
who provide leadership and direction within the project and team members to carry out the
construction work of dream home project, resource manager for monitoring and browsing
resources availability within the project, government of Australia as they regulate environment
consideration within project, project sponsor as the financial status of the project depends on
them and steering committee as they impact the overall development of the project at the
selected suburb.
The stakeholders within the project are identified as they play an efficient role in analysing the
quality of work, cost within the project and schedule of the project operation process. The
stakeholders within the dream home project are generally identified as direct and indirect
stakeholders as the direct stakeholders refers to the client, project manager and project sponsor as
their opinion and roles are directly linked with the project operation and execution while indirect
stakeholders refers to project team members, government and steering committee as they
indirectly associated with the dream home project. The top management within the stakeholders
within dream home project refers to the project executives as they direct the project strategies
while the resource manager controls the overall resources within the project. Apart from this,
they are regarded as stakeholders of the dream home project as stakeholders are reflected as
those who sustain their interest in the project process and outcome along with their effective role
in the construction of dream home project (Anholon, et. al., 2016).
Document Page
2. What are the factors that will influence the design and layout of your
dream home? Explain the project management processes you used to
determine the design/layout.
The managing product delivery process of PRINCE2 undertakes the consideration of the project
aspects such as design and layout and also plays an efficient role in determining the factors that
influence the design and layout of the dream home project as this process of PRINCE2 link
project manager and team manager for identifying the factors that consist the ability to influence
design and layout of dream home project (Brioso, 2015). The factors that influence the design
and layout of dream home project as identified by managing product delivery process are stated
below:
Space: The space that the dream home project sustains determines the entire interior and
exterior design of the project as space available within the selected suburb generally
states the accessibility of the project. The overall layout of the dream home project is
generally developed on the basis of the space and accessibility that the dream home is
required and available so as to successfully complete the project. Both the design and
layout of the dream home project is influenced by the space factor as it consist the ability
to impact the overall operation of the project and its accessibility. Space generally
influences the design and layout of dream home project through impacting the
requirement of storage space and study space within the project.
Trends: The latest trend also act as a factor which consist the ability to influence the
design and layout of the dream home project as trend in the construction sector impacts
the construction style, project priority and also the overall design and layout of the
project. The latest trend impact the priority of project which further impact design and
layout of the dream home project as the priority includes the consideration of texture,
kitchen, bedroom and bathroom design and layout in reference to the latest trends. The
latest trend also influence the design and layout of stairs, surface and also the appearance
of the dream home (Elias, 2016).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Project Budget: The project budget generally act as factor which sustains the ability to
influence the dream home project design and layout as it the budget of project consist the
capacity to impact the overall project execution and operation. The budget of project
usually determines land size and requirements of dream home project which further
impacts and influence the design and layout of the project as budget factor determines the
quality and requirement of the project design and layout (Mathur, et. al., 2014).
Apart from this, the project management process that is used to determine the design and layout
of the project is PRINCE2 as this project management process enables effective project
management of the dream home project as the six aspects, seven principles, seven themes and
seven processes of PRINCE2 determine a set of guidance which further supports efficient project
management of dream home project. The seven process of PRINCE2 plays an efficient role in
dream project while choosing appropriate suburbs, land size, builders and stakeholders along
with the determination of the factors that influence the design and layout of the dream home
project. Moreover, the PRINCE2 project management process divides the dream home project
for effective control and measure the project operations. The seven process of PRINCE2 that
further enhance and consider the dream home project are stated below:
Start-up Project: This process states the project visibility along with the determination
of project case and details of each stage plan within project. This process is generally
considered while choosing the best and most appropriate suburb for the dream home
project as this enables to determine the factors of the suburb in reference to the dream
home project requirements and use that concept for the development of project case and
project operation plan (Rogala, 2016).
Initiate the Project: This process generally address certain questions in relation to the
project which considers project scope, objectives, risks and quality for ensuring effective
project execution and completion. This process is considered while deciding the land size
required and is suitable for the dream home project as this process determines the prices
of properties prevailing for further deciding the size of land for dream home project.
Document Page
Direct the Project: This process includes the consideration of project accountability and
decision in reference to the authority engaged and associated with project. This process
plays an efficient role while choosing the best builders for the dream home project as this
process identify the required characteristics required for successful completion of the
dream home project.
Control Stages: This stage of PRINCE2 project management process determines and
assigns task within project which further determines issues within project and develop
report of the project. This stage is undertaken in consideration while identifying
stakeholders of the dream home project as this stage determines the stakeholders that
engage with the project operation, authorizing and reviewing process of the project
(Sunder, 2016).
Manage Project Delivery: This process of PRINCE2 process project control work and
relation between project manager and project team members. This process is effective
while identifying and determining the factors that influence the project design and layout
of the dream home project as it determines the project work package along with the
execution and operation of the project.
Manage Stage Boundary: This process generally related with overview of the project
performance and updated plan within the project for planning the project stage and
determine project report. This process is adopted while monitoring the overall dream
home project performance.
Close the Project: This process of PRINCE2 is associated with ensuring that the project
has achieved its goal and objectives at the decided time limit. This process is undertaken
in consideration while developing a closure report of dream home project as it process
enables to develop the closure report through evaluating the project and overing the
project objectives (Roy, et. al., 2018).
Document Page
3. Explain how you would implement lean best practices to achieve lean
project management for (1) and (2) above
The project of dream home also required to consider certain lean practices within the above
stated processes of dream home project which further support to achieve lean project
management as the lean practices enables to effective examine the project processes and enhance
the value of the project. Apart from this, the lean practices also lead to effective outcome of the
dream home project with proper control and management of the project. The best lean practices
that would be effective for achieving lean project management within the dream home project
are stated below:
Project Continuous Improvement: This practice is considered as best lean practice as
this practice is related with project actions, process and performance which further
determine the project development. This practice enables to analyse the project process
and ongoing progress for further reorganizing the progress structure of project along with
the consideration of project process and its quality. This practice could be implemented at
the start up and initiating stage of the project as it enables to more efficiently select
suburb in reference to the dream home project along the determination of land size of the
suburb for efficient operation of dream home project (Browning, et. al., 2015).
Elimination of Waste: This practice is reflected as lean practice as it is associated with
eliminating waste production during the execution and operation of the project. This
practice is stated as best practice within project as it ensures to choose appropriately
while dream home project along with effective consideration of inventory, defects and
transportation excessive use and to avoid their inefficiencies. This practice is best to
implement in the dream home project while choosing the best builders and key
stakeholders within the project operation so as to include effective and appropriate
builders and stakeholders and to further avoid excessive builders and stakeholder to avoid
excessive flow of budget and power and eliminate power waste within dream home
project (Sohi, et. al., 2016).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Safety: Safety practice within project is also regarded as one of the best practice within
lean management as this practice ensures safety during the project execution and
operation. This practice in efficient to consider with in project as this further supports
safer project execution. This practice could be implemented while operating the
construction process of the dream home project as this practice provides assurances of
safety during project operation and also support successful completion of the project
(López, et. al., 2012).
Document Page
Conclusion
This assessment is developed as individual assessment which aims to reflect the lean leading
project management and its implementation process in reference to the project of dream home.
This assessment basically aims to demonstrate the significance of lean project management
under project along with the explanation of PRINCE2 project management process while
determining the project process such as selecting appropriate suburb, land size, builders and
stakeholders within the project process. This assessment also aims to demonstrate the factors
which consist the ability to determine and influence design and layout of dream home project.
Moreover, the final part of the assessment aim to describe about the most appropriate and best
lean practices which consist the effectiveness to improve project management and process to
accomplish to project objectives and goals.