This project delves into the application of lean project management principles in building a dream home. The assignment begins with the selection of a suitable suburb in Western Australia, specifically Dalkeith, considering factors like cost, amenities, and proximity to Perth. It then explores the process of choosing a builder, emphasizing the importance of reputation, licensing, and the Key start initiative. The project identifies key stakeholders, including the project sponsor, contractors, and material suppliers. Furthermore, it analyzes factors influencing the design and layout of the dream home, such as topography, design changes, sustainability, and cost management. The project outlines the project management processes, detailing the selection of the suburb, land size, builder selection, stakeholder identification, and design considerations within the PMBOK framework. Finally, the project discusses implementing lean best practices, referencing relevant literature and providing a comprehensive overview of the entire project management lifecycle for building a dream home using lean principles.
Document Page
Running head: LEAN PROJECT MANAGEMENT
Lean project management
Name of the student:
Name the university:
Author note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1LEAN PROJECT MANAGEMENT
Table of Contents
Answer to question 1:......................................................................................................................3
Project Management Processes:..................................................................................................3
1a. Choosing the suburb and deciding the land size:...................................................................4
1b. Choosing the best builder:.....................................................................................................5
1c. Identifying the stakeholders for the project:..........................................................................7
Answer to question 2:......................................................................................................................7
Factors influencing the design and layout of the dream home:...................................................7
Answer to question number 3:.......................................................................................................10
Implementing lean best practices to achieve the lean project management:.............................10
References:....................................................................................................................................12
Document Page
2LEAN PROJECT MANAGEMENT
Answer to question 1:
Project Management Processes:
Managing a project is one of the critical and most vital process for any project. The
processes of project management are defined as the process that gets administered via regular
and a systematic process of planning and control through the services that are implemented
within the management process of the project (Kerzner, 2017). Implementing suitable project
management process helps in determining the risk that are associated with any project while
properly managing and mitigating the issues so as to overcome the future risks. The best methods
to choose the project management strategies had been described in detail in the Project
Management Book of Knowledge. It consists of effective methods and techniques so as to assist
in the structural approach of analyzing the resources that are essential to schedule the
management of the projects with the help of various project management processes that are
mentioned within the PMBOK.
Managing the projects within construction industries consists of several well-defined
processes which helps in directing, regulating and supervising the project during its early
development till its entire construction (Todorović et al., 2015). While initiating a construction
based project, several aspects do exists within the management process which includes selection
of the suitable suburb while deciding on the land size, obtaining necessary permits while
breaking down the work into specific tasks, choosing the best constructor depending on the
design and planning of the project, and most importantly choosing the proper stakeholders for
the project. Hence based on the mentioned aspects, further discussion is thus made taking into
account the PMBOK guide so as to develop the project on dream home.
Document Page
3LEAN PROJECT MANAGEMENT
1a. Choosing the suburb and deciding the land size:
Choosing the suburb for the dream house:
As per the project of developing of dream home concerns, it is very much important to
choose the suburbs while deciding on the size of the land where the project would be developed.
Choosing the proper suburbs for a dream home building plan helps in ensuring the safety of the
living while helping to find a peace and quiet place to live in (Hughes, Champion & Murdoch,
2015). The choice of selecting a proper suburb for the project while considering the several
aspects of project management process includes factors such as vacancy rates, rental population,
cost factors and many more which needs to get approved by the Key start initiative held by the
government of Western Australia. While considering the different aspects like cost and time
frame, amenities and infrastructures, loan criteria, the suitable suburb that has been selected for
developing the dream home project is Dalkeith. It is a Perth suburb situated at Western Australia
in the city of Ned lands. It is ranked as the first best suburb in Western Australia while providing
benefits of a perfect suburb consisting of clean and green, safe and sound surroundings which is
very much suitable for building the dream house project.
Deciding over the size of the land:
Deciding over the size of the land before the starting of the project is an important step as
it helps the constructors to plan their design based on the size of the land while planning out the
structures of the land accurately and safely that suits best to the land size. Deciding on the size of
the land helps in aligning the project with the suitable methods that will be utilized within the
managing of project in its later stages. The Dalkeith suburb region that is selected for the project
is regarded as one of the affluent suburbs to the western part of Australia. It is within the close
proximity to the city of Perth and is the home to some of the finest mansions of Perth. The region
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4LEAN PROJECT MANAGEMENT
basks within a breathtaking view of the river Swan. It is just six kilometers from the city of Perth
and is comprised of some beautiful leafy suburb within the municipality of the city of Nedland.
The region has ranked number one within the suburbs while offering a truly desirable lifestyle. It
is meant mainly for residential areas and is the best place to develop any dream house project as
the place consists of several beautiful parks as well as reserves. The region is also well facilitated
with local recreational facilities such as football club, bowling club as well as local primary
schools. Besides all these the transportation facilities of Dalkeith includes smooth availability of
bus services, coach services and train services. The size of the land that would require to build a
dream home depends on the accommodation of the family members based on the number of bed
rooms and its sizes, types, number of bathrooms required, area of the kitchen, lobby or passage
and the requirement of any garage area. For developing the concerned dream house of 2BHK, a
minimum of 60′ x 30′ = 1800 Sq. Ft. of land area would be required consisting of setbacks on the
front as well as the rear side of the plan.
1b. Choosing the best builder:
As per the PMBOK guide, choosing the right approach towards development of any
major project helps in dealing the project effectively while choosing the proper project
management knowledge areas related to human resources that would be required for the
specified project. In case of developing the dream house project, the next important step that
comes up after choosing the suitable suburb as well as deciding on the size of the land is
choosing the best and most reliable builder. In this case the Key start Initiative would play a
major role in providing assistance towards selecting the best builder for the dream home building
project. Certain factors that needs to be kept in mind before choosing a suitable builder for the
project includes high reputation check, warranty and services, authenticate license, track record,
Document Page
5LEAN PROJECT MANAGEMENT
quality of the project that is delivered, compensation policies as well as resale value of the
project that the builder is delivering. Here, the Key start initiative of the government would play
a major role while hiring agents working for construction industries that would help in providing
the best builders who will satisfy the requirements of the customers who would apply for
building their dream home along with them. The key start initiative will provide the best builders
according to the plan and design of the customers once their loans get approved with their
approval process. As the key start initiative of the government also facilitates mortgage facilities
to the customers availing for home insurances hence various cost related risk would likely to
emerge in this case which needs to be handled with the help of suitable project management
knowledge areas before choosing the builders based on the dream project (Williams, 2016).
Before entering into certain deals with the key start initiative, the final design of the building
should be agreed upon by the chosen builder and a signing of land contract with the land
developer should be initiated while paying a deposit of AUD$2000. Also, before starting with
the construction work of the project as per the contract signed with the builder, an amount of
AUD$2000 needs to get deposited while abiding by the finance approval clause. The finance
approval clause that is to be followed in this respect includes returning of the deposited amount
to the client in case if the builder fails to meet the requirements of the event. Hence while
choosing suitable builders for the project, all sorts of terms and conditions need to be kept in
mind for both the parties before the designing phase of the project actually starts.
In this context, the PMBOK guide will play a huge role in determining the different standards
that needs to get practiced within the overall development of the dream home project. The
PMBOK guide will help in providing different project management knowledge areas that the
project managers can adopt in order to manage the construction ideas of the specified project.
Document Page
6LEAN PROJECT MANAGEMENT
1c. Identifying the stakeholders for the project:
Project stakeholders plays an important role towards achieving the desired objectives of a
project while paying special attention to the overall success of the project. The concerned project
stakeholders that are involved with the project of developing dream home includes the project
sponsor, contractors, material suppliers and the builders (Heravi, Coffey & Trigunarsyah, 2015).
Besides all these stakeholders, the Key start initiative is one of the major stakeholders involved
within the entire project from which the customers would obtain benefits of getting approval of
their loan based on the planning of their dream home project.
Answer to question 2:
Factors influencing the design and layout of the dream home:
While designing the layout of a dream home certain standards of maintenance needs to be
followed that would be considered as the crucial factors towards the succefull development of
the project. The factors that might influence the design and layout of the dream home are
described as follows:
1. Topography: The designing of the layout of a dream home solely depends on the first
crucial factor that is the topography of the land on which the project will be developed.
This factor widely influences the design process while changing the layout of the
building that is planned by the customers for their dream home (Ajayi et al., 2016).
Hence the project owner should consider it necessary to figure out the topography of the
land that they have chosen while taking necessary assistance from the builder during the
planning phase of the home. A well communication process would help in achieving this
flexible approach while determining the suitable design of the layout of the dream home.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7LEAN PROJECT MANAGEMENT
2. Change of Design: Gradual change in the designing layout of the home by the builders is
another factor that greatly influences the layout of the project as different layout plans
costs different amount of money while taking longer amount of time to redesign the
entire layout of the dream home. Hence during the construction phase of the project, the
construction manager should take the sole responsibility of the designing of the dream
home while getting it approve from the client before moving to its next stage of
construction.
3. Sustainability: Sustainability of the designed layout of the dream home project is another
factor that affects the overall design process of the project (Govindan, Shankar &
Kannan, 2016). If the planned layout is not environmentally sustainable then there would
be a necessity to change the overall design of the project to make it build better for the
future (Miller & Doh, 2015).
4. Managing the cost factors: The budget that is proposed by the client is another factor that
can influence the overall design of the project layout affecting the materials that would be
used for the building purpose (Lines et al., 2015). Hence before starting off with any
planned layout of the dream home, the construction manager should remain aware of the
overall budget of the client and should include the supply of materials required for the
construction phase accordingly to the project needs.
Document Page
8LEAN PROJECT MANAGEMENT
Project management process to determine the design and layout of the dream home
project:
Implementing the proper project management process helps in balancing the key constraints
that are available within a project and helps in providing suitable tools and techniques that would
assist in making the decisions through the entire process of determining the design and layout of
the dream home project development. The suitable project management process that needs to be
considered in this respect includes-
1. Project inception and preliminary planning: This part of the project management process
includes clear understanding of the project goals while determining the scope of the
project. Here the construction of the dream home project would need prior inception
while exchanging the scope of the project with the project owners.
Document Page
9LEAN PROJECT MANAGEMENT
2. Communication management: Initiating a proper communication within the entire project
would help the project owners to determine the design of the layout of the dream home
and would help in processing with the planning and execution phase of the project. In
this case the clients should effectively communicate with the builders so as to convey
their plan and also to help the construction managers to align the project deliverables with
that of the need of the clients.
3. Budget management: Within the process of managing the project, managing the budget
of the project is essential factor that the project owners should keep in mind. During the
time of applying loans from the Key start initiative, the owners should survey the current
market position of the construction costs related to bidding of the designs and should get
agreed on one fixed budget while approving all the necessary changes that are
recommended by the construction manager.
4. Project planning and control phase: Finally, within the project management process
comes the final stage that is the planning and control phase where the overall planning of
the project gets controlled while making suitable assumptions for the development of
dream home (Sunindijo, Hadikusumo & Phangchunun, 2014). This is an important aspect
towards building a project as it helps in planning out a suitable outcome for the project
that aligns exactly with the client needs.
Answer to question number 3:
Implementing lean best practices to achieve the lean project management:
Implementation of lean project management helps in determining the problems that exists
within a project while implementing efficient methods so as to overcome the risks within a
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10LEAN PROJECT MANAGEMENT
project. The different types of lean best practices that would help in achieving the lean project
management towards building dream home project includes-
1. Improving the overall quality of the project: Customers get more attracted towards
quality projects and hence it is essential to maintain the overall quality of the dream home
project by adding values to the products that gets used within the project.
2. Observing and recording the steps involved within the project: Observing the project
process while recording its steps is one of the lean approaches that helps in achieving the
lean project management (Iqbal et al., 2015). This would in turn affect the end result of
the project while helping the project owner to analyses the mistakes that are likely to take
place within the project and preventing them further for any major risks in future.
3. Organizing a lean team: It is due responsibility of the project owner to develop and
organize a lean team that would help in managing the structure of the project of dream
home.
4. Implementing safety measures: Implementing safety measures within the project
planning process helps in gaining lean project management within the concerned project
(Li et al., 2015).
Document Page
11LEAN PROJECT MANAGEMENT
References:
Ajayi, S. O., Oyedele, L. O., Kadiri, K. O., Akinade, O. O., Bilal, M., Owolabi, H. A., & Alaka,
H. A. (2016). Competency-based measures for designing out construction waste: task and
contextual attributes. Engineering, Construction and Architectural Management, 23(4),
464-490.
Govindan, K., Shankar, K. M., & Kannan, D. (2016). Sustainable material selection for
construction industry–A hybrid multi criteria decision making approach. Renewable and
Sustainable Energy Reviews, 55, 1274-1288.
Heravi, A., Coffey, V., & Trigunarsyah, B. (2015). Evaluating the level of stakeholder
involvement during the project planning processes of building projects. International
Journal of Project Management, 33(5), 985-997.
Hughes, W., Champion, R., & Murdoch, J. (2015). Construction contracts: law and
management. Routledge.
Iqbal, S., Choudhry, R. M., Holschemacher, K., Ali, A., & Tamošaitienė, J. (2015). Risk
management in construction projects. Technological and Economic Development of
Economy, 21(1), 65-78.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Li, H., Lu, M., Hsu, S. C., Gray, M., & Huang, T. (2015). Proactive behavior-based safety
management for construction safety improvement. Safety science, 75, 107-117.