This memo, addressed to all staff and the Board of Directors, outlines the implementation of Lean Project Management (LPM) principles to secure government work for a project management consultancy. It begins by establishing the background, highlighting the importance of LPM in handling the complexities of government projects and the benefits for the organization. The memo's objective is to inform stakeholders about the implementation procedure, including critical success factors (CSF) such as leadership, financial capabilities, skills, and organizational culture. It details steps for implementation, including training requirements and achieving a growth mindset among staff. The memo emphasizes the benefits of LPM for stakeholders, including improved efficiency, process improvements, and enhanced service delivery. The report also discusses the CSF needed, steps for implementation, and the training requirements for staff, ensuring a structured approach to adopting lean principles and achieving successful project outcomes.

Introduction
The notable determination of the paper is to focus on the implementation of the Lean Project
Management principles in all the future projects in a major project management consultancy. It can
be said that the implementation of the Lean project management can be very much important for
this project management consultancy as it will help in undertaking the govermemt works (Osei-
Kyei & Chan, 2015). The implementation of the lean principles will be very much beneficial for
this business organization in numerous ways which will be discussed in various sections of the
paper.
Background
As one of the directors of a project management consultancy it can be said that our business
organization has decided to work on government projects thus the lean project management
principles can be very much useful to face the complexities of the government projects. It can be
said that the lead project delivery system model can be very much useful for this organization to
deal with the issues faced in each of the phases of specific projects (McKay, Monga & Raj, 2016).
The lean design, lean supply and lean assembly can be very much important to manage the
government based projects. The production control area can be huge improved using the lean
project management principles (Ogusu & Yamanaka, 2019). The transformation of the project
TO All staff
CC Board of Directors
DATE 15 May 2019
SUBJECT The Introduction of Lean Project Management
(LPM) principles to secure government work
The notable determination of the paper is to focus on the implementation of the Lean Project
Management principles in all the future projects in a major project management consultancy. It can
be said that the implementation of the Lean project management can be very much important for
this project management consultancy as it will help in undertaking the govermemt works (Osei-
Kyei & Chan, 2015). The implementation of the lean principles will be very much beneficial for
this business organization in numerous ways which will be discussed in various sections of the
paper.
Background
As one of the directors of a project management consultancy it can be said that our business
organization has decided to work on government projects thus the lean project management
principles can be very much useful to face the complexities of the government projects. It can be
said that the lead project delivery system model can be very much useful for this organization to
deal with the issues faced in each of the phases of specific projects (McKay, Monga & Raj, 2016).
The lean design, lean supply and lean assembly can be very much important to manage the
government based projects. The production control area can be huge improved using the lean
project management principles (Ogusu & Yamanaka, 2019). The transformation of the project
TO All staff
CC Board of Directors
DATE 15 May 2019
SUBJECT The Introduction of Lean Project Management
(LPM) principles to secure government work
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

deliverables can be managed in useful manner using the concepts of lean project management. The
following section of the paper will be discussing the aim of the memo.
Thesis of the memo
The primary objective of the memo is to inform all the stakeholders of this organization about the
implementation of the lean project management principles in most of their future projects. The
detailed implementation procedure of the lean project management principles will be informed to
each of the stakeholders using this memo. The outline of the memo will be presented in the ensuing
section of the paper.
Outline of the memo
The memo will be addressing most of the Critical success Factors which are needed by this
organization for the successful implementation of the lean project managemennt principles in this
organization. The reason behind the implementation can also be understood from the paper
(Rahiminejad & Vahidi, 2017). The paper will also help in highlighting the benefits which will be
gained by the stakeholders of this organization
Regsrding the implementation of lean project management principles. The steps required for the
successful implementation of the lean project management principles will also be discussed in the
paper. The training requirement for each of the staffs after the implementation of the lean project
management principles will also be stated in this memo (Luthra, Garg & Haleem, 2015). The
acceptability of the principles which has been incorporated in the working environment of this
consultancy will also be discussed in the paper. The initial reasons behind the implementation of the
lean principles for business organizations will be discussed in the next part of the assignment.
Initial reasons for implementing LPM
As mentioned by Abu Bakar, Subari & Mohd (2015), the lean project management
principles can be very much important for most of the business organizations in order to improve
the productivity as well as the efficiency of the stakeholders involved in the business. The
researcher of the paper stated that the upstream decisions of the organization can be significantly
improved using the lean project management principles. It can be said that the life cycle of the
product offered by business organization can be improved in a structured manner using the leading
lean projects. The prime limitations of the paper is that does not highlighted all the essential lean
project management principles (Rodriguez-Segura et al., 2016). The value of each of the principles
following section of the paper will be discussing the aim of the memo.
Thesis of the memo
The primary objective of the memo is to inform all the stakeholders of this organization about the
implementation of the lean project management principles in most of their future projects. The
detailed implementation procedure of the lean project management principles will be informed to
each of the stakeholders using this memo. The outline of the memo will be presented in the ensuing
section of the paper.
Outline of the memo
The memo will be addressing most of the Critical success Factors which are needed by this
organization for the successful implementation of the lean project managemennt principles in this
organization. The reason behind the implementation can also be understood from the paper
(Rahiminejad & Vahidi, 2017). The paper will also help in highlighting the benefits which will be
gained by the stakeholders of this organization
Regsrding the implementation of lean project management principles. The steps required for the
successful implementation of the lean project management principles will also be discussed in the
paper. The training requirement for each of the staffs after the implementation of the lean project
management principles will also be stated in this memo (Luthra, Garg & Haleem, 2015). The
acceptability of the principles which has been incorporated in the working environment of this
consultancy will also be discussed in the paper. The initial reasons behind the implementation of the
lean principles for business organizations will be discussed in the next part of the assignment.
Initial reasons for implementing LPM
As mentioned by Abu Bakar, Subari & Mohd (2015), the lean project management
principles can be very much important for most of the business organizations in order to improve
the productivity as well as the efficiency of the stakeholders involved in the business. The
researcher of the paper stated that the upstream decisions of the organization can be significantly
improved using the lean project management principles. It can be said that the life cycle of the
product offered by business organization can be improved in a structured manner using the leading
lean projects. The prime limitations of the paper is that does not highlighted all the essential lean
project management principles (Rodriguez-Segura et al., 2016). The value of each of the principles

was also not mentioned by the researcher of the paper. However, this paper also have numerous
benefits as it provides a detailed description of the successful implementation of the lean project
management principles in a business organization.
Figure 1: Lean project principles
(Source: Kapila et al., 2017)
Thus, the flow and the value goals of the organization can be monitored in an organized
manner using the lead project management principles. The products and the processes of the
products created in this system can be understood in a professional manner using the lean project
management principles such as the value stream, specific value, pull, perfection and flow (Lunkad
et al., 2015). The following section of the paper will be very much important regarding the benefits
offered to the business organizations after the implementation of the lean principles.
Extent of factors
The implementation of lean project management principles can be very much important for
most of the stakeholders associated with business organizations. It can be said that both the internal
along with the external stakeholders of business enterprises can be benefited using the lean project
management principles (González et al., 2017). The implementation of the lean project management
principles can address both the process issues as well as the human issues faced by the stakeholders
of this organization. It can be said that human issues such as the bottom line focus, customer focus,
benefits as it provides a detailed description of the successful implementation of the lean project
management principles in a business organization.
Figure 1: Lean project principles
(Source: Kapila et al., 2017)
Thus, the flow and the value goals of the organization can be monitored in an organized
manner using the lead project management principles. The products and the processes of the
products created in this system can be understood in a professional manner using the lean project
management principles such as the value stream, specific value, pull, perfection and flow (Lunkad
et al., 2015). The following section of the paper will be very much important regarding the benefits
offered to the business organizations after the implementation of the lean principles.
Extent of factors
The implementation of lean project management principles can be very much important for
most of the stakeholders associated with business organizations. It can be said that both the internal
along with the external stakeholders of business enterprises can be benefited using the lean project
management principles (González et al., 2017). The implementation of the lean project management
principles can address both the process issues as well as the human issues faced by the stakeholders
of this organization. It can be said that human issues such as the bottom line focus, customer focus,
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

cultural change, sense of urgency and the management leadership can be purposefully resolved
using the principles of the lean six sigma (Guan et al., 2018). Most of the process issues in terms of
the process improvement, process management, statistical thinking and method, quantitative
measures, displined approach and analysis of variation can be improved using the principles of the
lean six sigma. The impact of the lean principles in the government works will be highlighted in the
The government
The impact of the lean project management can also have lasting impact on the government
which is one of the most important stakeholders in this scenario. The implementation of the six
sigma principles can be hugely beneficial for the government officials as it helps in bringing down
the different types of overhead cost associated with each of the stakeholders. The break-even point
of the cost-benefit analysis of business organization can also be sucessfully monitored successfully
by the government officials using the lean project principles (González Pérez et al., 2017). The
sucessful implementation of the lean principles can have a positive impact on the government
offices as it can help to improve their existing service. Sustainability development and employee
satisfaction of both the government offices and the project management consultancy can be
improved after the successful, implementation of the lean principles in this project management
consultancy (Senzel, Greif & Greiner, 2018). The commitment of the resources of this organization
can also be improved using lean principles. The booking procedures of the government works can
be also improved to a significant extent using lean project management principles.
Adequacy of the description
The implementation of the lean project principles can have a huge impact for most of the
stakeholders of this organization. Both the government and all other stakeholders of the business
organziation can be improved using lean project management principles (Ghosh & Baliyan, 2016).
All the critical successful factors can be calculated and monitored using lean project management
principles. The total process of this business organization can also be mapped using lean project
principles. The highly skilled personnels who are capable to do work on this project can also be
identified using the lean project management principles (Gara et al., 2019). It can also be said that
the key performance indicators can be utilized in a professional manner using lean project
management principles.
using the principles of the lean six sigma (Guan et al., 2018). Most of the process issues in terms of
the process improvement, process management, statistical thinking and method, quantitative
measures, displined approach and analysis of variation can be improved using the principles of the
lean six sigma. The impact of the lean principles in the government works will be highlighted in the
The government
The impact of the lean project management can also have lasting impact on the government
which is one of the most important stakeholders in this scenario. The implementation of the six
sigma principles can be hugely beneficial for the government officials as it helps in bringing down
the different types of overhead cost associated with each of the stakeholders. The break-even point
of the cost-benefit analysis of business organization can also be sucessfully monitored successfully
by the government officials using the lean project principles (González Pérez et al., 2017). The
sucessful implementation of the lean principles can have a positive impact on the government
offices as it can help to improve their existing service. Sustainability development and employee
satisfaction of both the government offices and the project management consultancy can be
improved after the successful, implementation of the lean principles in this project management
consultancy (Senzel, Greif & Greiner, 2018). The commitment of the resources of this organization
can also be improved using lean principles. The booking procedures of the government works can
be also improved to a significant extent using lean project management principles.
Adequacy of the description
The implementation of the lean project principles can have a huge impact for most of the
stakeholders of this organization. Both the government and all other stakeholders of the business
organziation can be improved using lean project management principles (Ghosh & Baliyan, 2016).
All the critical successful factors can be calculated and monitored using lean project management
principles. The total process of this business organization can also be mapped using lean project
principles. The highly skilled personnels who are capable to do work on this project can also be
identified using the lean project management principles (Gara et al., 2019). It can also be said that
the key performance indicators can be utilized in a professional manner using lean project
management principles.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Figure 1: Advantages of lean principles
(Source: Sunder 2016)
Extent of factors
There are numerous CSF which are responsible for implementing LPM in this consultancy
organization. Detailed description of the CSF are described in the following table.
CSF Explanation
Leadership and Management The role of the organizational leaders is very
much important regarding the implementation of
the lean principles as there can be numerous
issues in terms of the organizational resistances
coming (Tarhini et al., 2015).
The role of the management is very much
important regarding the implementation of the
lean principles a huge investment may be
required for managing each of the stakeholders
of the business.
Financial capabilities The financial capabilities of the investors, as
well as the management team, are very much
significant for the implementation process of the
lean principles.
Skills and expertise Skills and expertise of each of the stakeholders
(Source: Sunder 2016)
Extent of factors
There are numerous CSF which are responsible for implementing LPM in this consultancy
organization. Detailed description of the CSF are described in the following table.
CSF Explanation
Leadership and Management The role of the organizational leaders is very
much important regarding the implementation of
the lean principles as there can be numerous
issues in terms of the organizational resistances
coming (Tarhini et al., 2015).
The role of the management is very much
important regarding the implementation of the
lean principles a huge investment may be
required for managing each of the stakeholders
of the business.
Financial capabilities The financial capabilities of the investors, as
well as the management team, are very much
significant for the implementation process of the
lean principles.
Skills and expertise Skills and expertise of each of the stakeholders

are very much important regarding the
successful implementation of tle lean principles
as it would help them to understand both the
advantages and limitations of the principles
from different perspectives.
Organizational culture Each of the internal stakeholders of this business
must be understanding the value of the lean
principles. All the employee of the
organizaation must be having an idea about the
advantages and the limitations of the lean
principles.
Table 1: Detailed descriptipn of the CSF while implementing LPM
(Source: Created by the author)
Adequacy of the description
Based on the above table it can be concluded that the different types of CSF can have a
significant impact on this project. The interest of the stakeholder has to be aligned with the
discussed CSF so that there are no issues of the during the implementation of the lean principles
(Yeoh & Popovič, 2016). It can be said that the working structure of the organization can remain
unchanged using the discussed CSF's. All thw workable backlogs of the organization can also be
improved using the CSF. All the weekly work plans can be sorted using the mentioned CSF. It can
also be said that the commitment of the stakeholders can also be managed using the CSF
(Emmanuel, 2016). The organizational culture of this project management consultancy can also be
improved using the Critical Sucess factors. The following section of the paper will be presenting
each step for the implementation of the lean principles considering each of the categories of the
Critical Success Factors.
Steps for the implementation of the LPM considering the CSF
The different steps for the implementation of LPM in CSF are discussed as followings:
The business operations and the risks of the implementation process has to be considered in
the first place
Training must be given to each of the employees of this organization before the start of the
implementation procedure.
All the constraints, scheduled duration, pre-requisites, directives and the resources required
in this project has to be selected according to the areas of expertise.
successful implementation of tle lean principles
as it would help them to understand both the
advantages and limitations of the principles
from different perspectives.
Organizational culture Each of the internal stakeholders of this business
must be understanding the value of the lean
principles. All the employee of the
organizaation must be having an idea about the
advantages and the limitations of the lean
principles.
Table 1: Detailed descriptipn of the CSF while implementing LPM
(Source: Created by the author)
Adequacy of the description
Based on the above table it can be concluded that the different types of CSF can have a
significant impact on this project. The interest of the stakeholder has to be aligned with the
discussed CSF so that there are no issues of the during the implementation of the lean principles
(Yeoh & Popovič, 2016). It can be said that the working structure of the organization can remain
unchanged using the discussed CSF's. All thw workable backlogs of the organization can also be
improved using the CSF. All the weekly work plans can be sorted using the mentioned CSF. It can
also be said that the commitment of the stakeholders can also be managed using the CSF
(Emmanuel, 2016). The organizational culture of this project management consultancy can also be
improved using the Critical Sucess factors. The following section of the paper will be presenting
each step for the implementation of the lean principles considering each of the categories of the
Critical Success Factors.
Steps for the implementation of the LPM considering the CSF
The different steps for the implementation of LPM in CSF are discussed as followings:
The business operations and the risks of the implementation process has to be considered in
the first place
Training must be given to each of the employees of this organization before the start of the
implementation procedure.
All the constraints, scheduled duration, pre-requisites, directives and the resources required
in this project has to be selected according to the areas of expertise.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

The lean principles such as the specify value, value stream, flow, pull and perfection has to
be understood by each of the stakeholder associated with this project.
Achievement of mindset
The growth mindset can have a significant impact on the growth and progress of this
organization, it can be also said that the challenges along with the benefits of the lean project
principles has to be clear among every stakeholder of this organization. Opinion of each of the
stakeholders must be taken in this project so that both employee edevelopoment, as well as
organizational development, can be achieved (Dyson, Matthews & Love, 2016). The growth
mindset and the fixed mindset can be both important regarding the successful implementation of the
lean principles in this organization. The training required for each of the stakeholders regarding the
implementation of the lean principles will be presented in the following section of the paper.
Training requirements for individual staff
The different types of training schedule which can be used in this project management
consultancy are discussed in the following table.
Equipments Explanation
Orientation The organization must be having a corporate
culture so that the implementation process can
be smooth. The ben
Onboard training Misconceptions about the implementation of
the lean principles must be identified using the
onboard training.
Technical training Data analysis of the change can be monitored
using the technical training where IT experts
are needed to be hired by the organization.
Soft skill development training Communication skills, presentation skills,
problem solving skills, ethics, leadership skills,
adaptability, emotional intelligence and time
management of the stakeholders can be
monitored using the soft skills development
development training.
Service and products training Details of the implementation of the lean
be understood by each of the stakeholder associated with this project.
Achievement of mindset
The growth mindset can have a significant impact on the growth and progress of this
organization, it can be also said that the challenges along with the benefits of the lean project
principles has to be clear among every stakeholder of this organization. Opinion of each of the
stakeholders must be taken in this project so that both employee edevelopoment, as well as
organizational development, can be achieved (Dyson, Matthews & Love, 2016). The growth
mindset and the fixed mindset can be both important regarding the successful implementation of the
lean principles in this organization. The training required for each of the stakeholders regarding the
implementation of the lean principles will be presented in the following section of the paper.
Training requirements for individual staff
The different types of training schedule which can be used in this project management
consultancy are discussed in the following table.
Equipments Explanation
Orientation The organization must be having a corporate
culture so that the implementation process can
be smooth. The ben
Onboard training Misconceptions about the implementation of
the lean principles must be identified using the
onboard training.
Technical training Data analysis of the change can be monitored
using the technical training where IT experts
are needed to be hired by the organization.
Soft skill development training Communication skills, presentation skills,
problem solving skills, ethics, leadership skills,
adaptability, emotional intelligence and time
management of the stakeholders can be
monitored using the soft skills development
development training.
Service and products training Details of the implementation of the lean
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

principles must be understood by both the
external along with the internal stakeholders of
the organization.
Mandatory training Training regulations of the lean principles must
be managed using a central hub.
Table 2: Training requirement
(Source: Created by the author)
The implementation of the lean principles can have a huge impact on this consultancy.
Training are required so that quality-related knowledge are common for most of the stakeholders of
this organization . The problem solving skills can also be incorporated into the employees of this
organization in an organized manner using the training schedules. The mutuals goals and the LSS
goals can have to be aligned with each of the stakeholders of this project. The customer
management system can also play a huge role for both the clients as well as the employees of the
organization regsarding the insight knowledge about the lean principles (de Sousa et al., 2018).
Work and the task analysis of each of the stakeholders can be also monitored in a better way if each
of the employees are aware of the complexities of the lean principles. Setting up of the expectations
from each of the stakeholders are done using the technical training procedures (Disterheft et al.,
2015). The practicality of the method regarding the adoption of the LPM so that it would be
beneficial for the tendering activity of the government will be described in a detailed manner in the
following unit of this paper.
Practicality of the method
The following table can be very much important for this project management consultancy so
that it can able to tender different types of government works
Stepwise Explanation
Commitment of the employees The commitment of the employees is an
important factors regarding the practicsl
implementation of the lean principles in this
project management consultancy.
Training the workforce All the workforces of this project management
consultancy have to be aligning with the lean
external along with the internal stakeholders of
the organization.
Mandatory training Training regulations of the lean principles must
be managed using a central hub.
Table 2: Training requirement
(Source: Created by the author)
The implementation of the lean principles can have a huge impact on this consultancy.
Training are required so that quality-related knowledge are common for most of the stakeholders of
this organization . The problem solving skills can also be incorporated into the employees of this
organization in an organized manner using the training schedules. The mutuals goals and the LSS
goals can have to be aligned with each of the stakeholders of this project. The customer
management system can also play a huge role for both the clients as well as the employees of the
organization regsarding the insight knowledge about the lean principles (de Sousa et al., 2018).
Work and the task analysis of each of the stakeholders can be also monitored in a better way if each
of the employees are aware of the complexities of the lean principles. Setting up of the expectations
from each of the stakeholders are done using the technical training procedures (Disterheft et al.,
2015). The practicality of the method regarding the adoption of the LPM so that it would be
beneficial for the tendering activity of the government will be described in a detailed manner in the
following unit of this paper.
Practicality of the method
The following table can be very much important for this project management consultancy so
that it can able to tender different types of government works
Stepwise Explanation
Commitment of the employees The commitment of the employees is an
important factors regarding the practicsl
implementation of the lean principles in this
project management consultancy.
Training the workforce All the workforces of this project management
consultancy have to be aligning with the lean

principles.
Having a plan A detailed plan must be created by the project
manager for the implementation of the lean
principles.
Resource Management All the available resources of this organization
must be aware of the lean principles along with
its limitations.
Use of lean tools Streaming mapping and 5S are the two most
important lean tools which can be used by this
project management consultancy regarding the
successful implementation of the lean
principles.
The usability of the LPM can be understood using the Usability Evaluation Basics (USB),
USB can play a huge role in the testing the feasibility of the LPM principles which are implemented
in the working environment of this consultancy. Card sort test analysis can also be very much
important to understand the successful implementation of the LPM principles (Cen, 2018).
Numerous wiresframes can be very much helpful for most of the internal along with the external
stakeholders of the organization as the wireframe can be very much significant to identify the
progress made after the implementation of te lean principles. Usability testing and the test design
can also be important after the implementation of lean principles.
Ease of learning, efficiency of the use of the new lean principles, memorability, error
frequency and severity of the implementation process and the subjective satisfaction are the other
essential aspects of the implementation of the lean principles in this project management
consultancy.
The tender process of the government works can also be enhanced using lean principles. It can be
said that the Failure Mode Effect Analysis (FMEA) can play a huge role regarding the
implementation off the lean principles in this project. The failed usability outcomes must also be
understood by all the associated stakeholders of this project who are associated with the
implementation of the lean principle for this project management consultancy. All the activities of
the participants should be tackled and managed using the FMEA. The Fault Tree Analysis (FTA)
Having a plan A detailed plan must be created by the project
manager for the implementation of the lean
principles.
Resource Management All the available resources of this organization
must be aware of the lean principles along with
its limitations.
Use of lean tools Streaming mapping and 5S are the two most
important lean tools which can be used by this
project management consultancy regarding the
successful implementation of the lean
principles.
The usability of the LPM can be understood using the Usability Evaluation Basics (USB),
USB can play a huge role in the testing the feasibility of the LPM principles which are implemented
in the working environment of this consultancy. Card sort test analysis can also be very much
important to understand the successful implementation of the LPM principles (Cen, 2018).
Numerous wiresframes can be very much helpful for most of the internal along with the external
stakeholders of the organization as the wireframe can be very much significant to identify the
progress made after the implementation of te lean principles. Usability testing and the test design
can also be important after the implementation of lean principles.
Ease of learning, efficiency of the use of the new lean principles, memorability, error
frequency and severity of the implementation process and the subjective satisfaction are the other
essential aspects of the implementation of the lean principles in this project management
consultancy.
The tender process of the government works can also be enhanced using lean principles. It can be
said that the Failure Mode Effect Analysis (FMEA) can play a huge role regarding the
implementation off the lean principles in this project. The failed usability outcomes must also be
understood by all the associated stakeholders of this project who are associated with the
implementation of the lean principle for this project management consultancy. All the activities of
the participants should be tackled and managed using the FMEA. The Fault Tree Analysis (FTA)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

can play a huge role in finding the fault of the implementation of the lean principles. The use error
faults can also be identified in an organized manner using (Bobbs et al., 2019). Thus, it can be said
that the implementation of the lean principles in this project management organization is possible
using Usability Evaluation Basics (USB) and Failure Mode Effect Analysis (FMEA).
Adequate linkage to adoption of LPM
The adoption of the LPM using the USB and the FMEA can be very much beneficial for this
project management consultancy as it would help in the implementation of the lean principles. It
can be said the the difficulties of the consultancy can have a direct negative impact on the growth
and development of business organziations which can be addressed using the FMEA. At the same
time, it can also be said that the human resources of this project consultancy can be also managed in
an organized manner using the FMEA (Abu Bakar, Subari & Mohd Daril, 2015). Based on these
two techniques it can be said that the strategic planning of this project management consultancy can
also be improved.
Conclusion
The papers helps in understanding the implementation of the lean principles can be very
much beneficial for this project management consultancy as they want to tender the government
projects. This memo can be very much beneficial for all the stakeholders of this organization to
have a detailed understanding of different aspects of lean principles. The benefits offered by lean
principles can also be understood from the paper. The detailed description of the CSF in this project
can also be determined from the paper. The paper also successfully identifies the training
requirements for the implementation of lean principles.
Yours sincerely,
Please insert
faults can also be identified in an organized manner using (Bobbs et al., 2019). Thus, it can be said
that the implementation of the lean principles in this project management organization is possible
using Usability Evaluation Basics (USB) and Failure Mode Effect Analysis (FMEA).
Adequate linkage to adoption of LPM
The adoption of the LPM using the USB and the FMEA can be very much beneficial for this
project management consultancy as it would help in the implementation of the lean principles. It
can be said the the difficulties of the consultancy can have a direct negative impact on the growth
and development of business organziations which can be addressed using the FMEA. At the same
time, it can also be said that the human resources of this project consultancy can be also managed in
an organized manner using the FMEA (Abu Bakar, Subari & Mohd Daril, 2015). Based on these
two techniques it can be said that the strategic planning of this project management consultancy can
also be improved.
Conclusion
The papers helps in understanding the implementation of the lean principles can be very
much beneficial for this project management consultancy as they want to tender the government
projects. This memo can be very much beneficial for all the stakeholders of this organization to
have a detailed understanding of different aspects of lean principles. The benefits offered by lean
principles can also be understood from the paper. The detailed description of the CSF in this project
can also be determined from the paper. The paper also successfully identifies the training
requirements for the implementation of lean principles.
Yours sincerely,
Please insert
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

References
Abu Bakar, F. A., Subari, K., & Mohd Daril, M. A. (2015). Critical success factors of Lean Six
Sigma deployment: a current review. International Journal of Lean Six Sigma, 6(4), 339-
348.
Bobbs, M., Trust, M. D., Teixeira, P., Coopwood, B., Aydelotte, J., Tabas, I., ... & Brown, C. V.
(2019). Decreasing Failed Extubations with the Implementation of an Extubation Checklist.
The American Journal of Surgery.
Cen, Y. (2018). Teaching for developmental growth: learning partnerships and student development
in graduate education in China. Teaching in Higher Education, 23(1), 30-46.
de Sousa Jabbour, A. B. L., Jabbour, C. J. C., Foropon, C., & Godinho Filho, M. (2018). When
titans meet–Can industry 4.0 revolutionise the environmentally-sustainable manufacturing
wave? The role of critical success factors. Technological Forecasting and Social Change,
132, 18-25.
Disterheft, A., Caeiro, S., Azeiteiro, U. M., & Leal Filho, W. (2015). Sustainable universities–a
study of critical success factors for participatory approaches. Journal of Cleaner Production,
106, 11-21.
Dyson, K., Matthews, J., & Love, P. E. (2016). Critical success factors of adapting heritage
buildings: an exploratory study. Built Environment Project and Asset Management, 6(1), 44-
57.
Emmanuel, O. O. (2016). Critical success factors (CSF) determining the implementation of public-
private partnership projects. Covenant Journal of Research in the Built Environment, 1(2).
Gara, F., Regni, M., Roia, D., Carbonari, S., & Dezi, F. (2019). Evidence of coupled soil-structure
interaction and site response in continuous viaducts from ambient vibration tests. Soil
Dynamics and Earthquake Engineering, 120, 408-422.
Abu Bakar, F. A., Subari, K., & Mohd Daril, M. A. (2015). Critical success factors of Lean Six
Sigma deployment: a current review. International Journal of Lean Six Sigma, 6(4), 339-
348.
Bobbs, M., Trust, M. D., Teixeira, P., Coopwood, B., Aydelotte, J., Tabas, I., ... & Brown, C. V.
(2019). Decreasing Failed Extubations with the Implementation of an Extubation Checklist.
The American Journal of Surgery.
Cen, Y. (2018). Teaching for developmental growth: learning partnerships and student development
in graduate education in China. Teaching in Higher Education, 23(1), 30-46.
de Sousa Jabbour, A. B. L., Jabbour, C. J. C., Foropon, C., & Godinho Filho, M. (2018). When
titans meet–Can industry 4.0 revolutionise the environmentally-sustainable manufacturing
wave? The role of critical success factors. Technological Forecasting and Social Change,
132, 18-25.
Disterheft, A., Caeiro, S., Azeiteiro, U. M., & Leal Filho, W. (2015). Sustainable universities–a
study of critical success factors for participatory approaches. Journal of Cleaner Production,
106, 11-21.
Dyson, K., Matthews, J., & Love, P. E. (2016). Critical success factors of adapting heritage
buildings: an exploratory study. Built Environment Project and Asset Management, 6(1), 44-
57.
Emmanuel, O. O. (2016). Critical success factors (CSF) determining the implementation of public-
private partnership projects. Covenant Journal of Research in the Built Environment, 1(2).
Gara, F., Regni, M., Roia, D., Carbonari, S., & Dezi, F. (2019). Evidence of coupled soil-structure
interaction and site response in continuous viaducts from ambient vibration tests. Soil
Dynamics and Earthquake Engineering, 120, 408-422.

Ghosh, S., & Baliyan, M. (2016, November). A hash based architecture of longest prefix matching
for fast IP processing. In 2016 IEEE Region 10 Conference (TENCON) (pp. 228-231).
IEEE.
González Pérez, F., Padrón Hernández, L. A., Aznárez González, J. J., & Maeso, O. (2017).
Implementation of the consistent lumped-parameter model for the computation of the
seismic response of nonlinear piled structures.
González, F., Padrón, L. A., Aznárez, J. J., & Maeso, O. (2017). Implementation of the consistent
lumped-parameter model for the computation of the seismic response of nonlinear piled
structures. Procedia engineering, 199, 2360-2365.
Guan, X., Yang, M., Man, C., Tian, Y., & Shi, L. (2018). The effect of the implementation of low
price medicine policy on medicine price in China: A retrospective study. The International
journal of health planning and management, 33(3), e798-e806.
Kapila, E. N., Bains, E. R., Singh, E. G., & Singh, E. P. (2017). Development and Implementation
of Two Stage LCL Boost using Fuel Cell as an Input source in RES application.
International Journal of Advanced Research in Computer Science, 8(4).
Lunkad, S. F., Grindhaug, G., Hussain, S., Walker, D., & Dhaher, K. S. (2015, May). Innovative
Drilling Technologies Contribute in Implementing New Gas Lift Well Design on Statfjord
Field, North Sea. In SPE Artificial Lift Conference—Latin America and Caribbean. Society
of Petroleum Engineers.
Luthra, S., Garg, D., & Haleem, A. (2015). An analysis of interactions among critical success
factors to implement green supply chain management towards sustainability: An Indian
perspective. Resources Policy, 46, 37-50.
McKay, J., Monga, V., & Raj, R. (2016, July). Localized dictionary design for geometrically robust
sonar ATR. In 2016 IEEE International Geoscience and Remote Sensing Symposium
(IGARSS) (pp. 991-994). IEEE.
Ogusu, R., & Yamanaka, T. (2019). LPM: Learnable Pooling Module for Efficient Full-Face Gaze
Estimation. arXiv preprint arXiv:1903.05761.
for fast IP processing. In 2016 IEEE Region 10 Conference (TENCON) (pp. 228-231).
IEEE.
González Pérez, F., Padrón Hernández, L. A., Aznárez González, J. J., & Maeso, O. (2017).
Implementation of the consistent lumped-parameter model for the computation of the
seismic response of nonlinear piled structures.
González, F., Padrón, L. A., Aznárez, J. J., & Maeso, O. (2017). Implementation of the consistent
lumped-parameter model for the computation of the seismic response of nonlinear piled
structures. Procedia engineering, 199, 2360-2365.
Guan, X., Yang, M., Man, C., Tian, Y., & Shi, L. (2018). The effect of the implementation of low
price medicine policy on medicine price in China: A retrospective study. The International
journal of health planning and management, 33(3), e798-e806.
Kapila, E. N., Bains, E. R., Singh, E. G., & Singh, E. P. (2017). Development and Implementation
of Two Stage LCL Boost using Fuel Cell as an Input source in RES application.
International Journal of Advanced Research in Computer Science, 8(4).
Lunkad, S. F., Grindhaug, G., Hussain, S., Walker, D., & Dhaher, K. S. (2015, May). Innovative
Drilling Technologies Contribute in Implementing New Gas Lift Well Design on Statfjord
Field, North Sea. In SPE Artificial Lift Conference—Latin America and Caribbean. Society
of Petroleum Engineers.
Luthra, S., Garg, D., & Haleem, A. (2015). An analysis of interactions among critical success
factors to implement green supply chain management towards sustainability: An Indian
perspective. Resources Policy, 46, 37-50.
McKay, J., Monga, V., & Raj, R. (2016, July). Localized dictionary design for geometrically robust
sonar ATR. In 2016 IEEE International Geoscience and Remote Sensing Symposium
(IGARSS) (pp. 991-994). IEEE.
Ogusu, R., & Yamanaka, T. (2019). LPM: Learnable Pooling Module for Efficient Full-Face Gaze
Estimation. arXiv preprint arXiv:1903.05761.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 13
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.