TO All staff
CC Board of Directors
DATE 14 May 2019
SUBJECT The Introduction of Lean Project Management (LPM) principles to secure
government work.
Introduction
The consultancy company wishes to implement lean project management so that it could
grow the business output in addition to gain the government work. According to, Elias,
(2016). There are numerous methods and elements that the firm could address to absolutely
implement the tilt mission control into its structure. The goal of this memo is to expose a way
to enforce lean task control into the consultancy. Currently working as a director of the well-
reputed project management consultancy firm NICAID group, the consultancy wants to take
the government work where the lean project management function would be implemented by
the organisation. The company desires to have a project management approach in its culture
through which they would be able to achieve the objective of maximising the goals of the
company and also would be able to engage the competency in skills of the employees of the
company. The company is currently working in the project management services through
which they are able to achieve the objective of maximising the goals of the company and is
determinant towards their goals and functions. The company was founded in the year 2015
and has become one of the reputed company which helped in achieving the objective of
maximising the goals of the company. Through the memo, the company would give the plan
which would help in achieving the objective of maximising the lean project management in
the company. This would also help the company to get the government project on board and
would also help in increasing the performance of the company as a whole.
The Needs of implementing LPM
The consultancy wants to begin work which is given through the authorities. But the trouble
which has been going on is if the consultancy wants to try this job then it is required that it
should observe the lean project management approach. As per Feldman, (2012) By way of the
use of lean challenge control, the consultancy will have more of a higher manner of finishing
the initiatives and will increase their performance. Lean task control is likewise referred to as
a lean six sigma. This is seen that there are various benefits that are related to the
CC Board of Directors
DATE 14 May 2019
SUBJECT The Introduction of Lean Project Management (LPM) principles to secure
government work.
Introduction
The consultancy company wishes to implement lean project management so that it could
grow the business output in addition to gain the government work. According to, Elias,
(2016). There are numerous methods and elements that the firm could address to absolutely
implement the tilt mission control into its structure. The goal of this memo is to expose a way
to enforce lean task control into the consultancy. Currently working as a director of the well-
reputed project management consultancy firm NICAID group, the consultancy wants to take
the government work where the lean project management function would be implemented by
the organisation. The company desires to have a project management approach in its culture
through which they would be able to achieve the objective of maximising the goals of the
company and also would be able to engage the competency in skills of the employees of the
company. The company is currently working in the project management services through
which they are able to achieve the objective of maximising the goals of the company and is
determinant towards their goals and functions. The company was founded in the year 2015
and has become one of the reputed company which helped in achieving the objective of
maximising the goals of the company. Through the memo, the company would give the plan
which would help in achieving the objective of maximising the lean project management in
the company. This would also help the company to get the government project on board and
would also help in increasing the performance of the company as a whole.
The Needs of implementing LPM
The consultancy wants to begin work which is given through the authorities. But the trouble
which has been going on is if the consultancy wants to try this job then it is required that it
should observe the lean project management approach. As per Feldman, (2012) By way of the
use of lean challenge control, the consultancy will have more of a higher manner of finishing
the initiatives and will increase their performance. Lean task control is likewise referred to as
a lean six sigma. This is seen that there are various benefits that are related to the

implementation of lean project management in the firm. The lean project management helps
the company to stay competitive in the industry through which they would be able to compete
in the profitability in the market. The company should find the ways through which they can
maximise the value and minimise the waste while performing the task. By applying the lean
project management in the company the company is able to challenge the old process a
continuously assess the ways which help in eliminating the inefficiencies in the organisation.
Through this process, the company would be able to achieve the following which includes:
Increase in the productivity of the company
Improvement in the quality of work for the company
Advancement of the execution practice.
Smoothening of the operations which would help in a continuous flow of the
operation in the company
This would also result in reducing the operating cost of the company and would increase the
profits for the company.
This also helps in increasing the productivity of the company and better efficiency within the
organisation.
According to, Jalal Sohi et. al., (2016) this is seen that the lean project management is
inspired by the Toyotas management system where the management tries to follow different
principle which is categorised as the 3MU of the Kaizen, these are Muda which means
eliminating the waste, Muri that means to reduce the overburden of task and Mura which
means to reduce the inconsistency.
the company to stay competitive in the industry through which they would be able to compete
in the profitability in the market. The company should find the ways through which they can
maximise the value and minimise the waste while performing the task. By applying the lean
project management in the company the company is able to challenge the old process a
continuously assess the ways which help in eliminating the inefficiencies in the organisation.
Through this process, the company would be able to achieve the following which includes:
Increase in the productivity of the company
Improvement in the quality of work for the company
Advancement of the execution practice.
Smoothening of the operations which would help in a continuous flow of the
operation in the company
This would also result in reducing the operating cost of the company and would increase the
profits for the company.
This also helps in increasing the productivity of the company and better efficiency within the
organisation.
According to, Jalal Sohi et. al., (2016) this is seen that the lean project management is
inspired by the Toyotas management system where the management tries to follow different
principle which is categorised as the 3MU of the Kaizen, these are Muda which means
eliminating the waste, Muri that means to reduce the overburden of task and Mura which
means to reduce the inconsistency.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Lean project management techniques
This is seen that there are various lean project management techniques which help the
company to implement lean project management in the company. This includes various
approaches which are considered to be best for implementing lean project management in the
company. As per the view of Mahlck & Maehlck, (2013) these include the following
methodologies and techniques to implement lean project management within the company.
The lean methodology that is available in the company includes:
Six sigma which helps in focusing on the quality and the waste elimination within the
company as this is a major requirement for the government projects.
Deming Cycle: This is considered as the method where plan do check and act (PDCA)
approach is used by the company to perform the obligations.
Kanban: This is the approach that is used by the organisation to eliminate the backlogs of the
work that are in the progress for the company. There are various tools that are present in the
organisation which helps in applying lean project management in the company.
Benefits of stakeholders
It’s far visible that the stakeholders play a critical role in lean assignment management. The
number one stakeholders are those that receive the give up the product, the advantage from
This is seen that there are various lean project management techniques which help the
company to implement lean project management in the company. This includes various
approaches which are considered to be best for implementing lean project management in the
company. As per the view of Mahlck & Maehlck, (2013) these include the following
methodologies and techniques to implement lean project management within the company.
The lean methodology that is available in the company includes:
Six sigma which helps in focusing on the quality and the waste elimination within the
company as this is a major requirement for the government projects.
Deming Cycle: This is considered as the method where plan do check and act (PDCA)
approach is used by the company to perform the obligations.
Kanban: This is the approach that is used by the organisation to eliminate the backlogs of the
work that are in the progress for the company. There are various tools that are present in the
organisation which helps in applying lean project management in the company.
Benefits of stakeholders
It’s far visible that the stakeholders play a critical role in lean assignment management. The
number one stakeholders are those that receive the give up the product, the advantage from
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

lean task management as they might obtain a higher first-class product. Additionally, by the
use of lean undertaking management, the number one stakeholders will advantage more than
one alternative as lean mission control might make the consultancy examine diverse
approaches to do the challenge. Any other issue that can be seen is that the stakeholders will
fell a sense of feat due to the fact the services or products are added quick and is of high
excellent. For the inner stakeholders, it's far visible that in addition, they enjoy the technique
of lean mission control. As per Reusch & Reusch, (2013) one advantage is that the
consultancy might be able to deliver quicker and excellent offerings to its customers, thus
ensuring in extra profits for the employer. The based stakeholders will also gain from lean
undertaking management because the work might be completed on a brief basis in which the
team participants can without delay cost from it. This is seen that some of the benefits of
implementing lean project management in the company include the government, employees,
investors etc. The benefits that are arising through this includes the following:
To Government: Through this process, the government of the company can get information
about the company more transparent and can check that the information that is provided by
the company is ethical or not. This is seen that lean project management is helpful in
managing the substantial improvement in the project and also increases the efficiency of the
company through which the government can regulate the functioning. This also helps the
government to get information about whether the company is following lean project
management or not within the country.
To Employees of the company: As the management of the company introduces the lean
project management in the operations of the company the employees of the company get
benefited as the skills and the competencies of the employees increase. Through this process,
the employees of the company are able to improve the efficiency of the work that is done by
them. As the employees of the company get the training about the waste reduction they are
able to increase the performance of the company and are also able to achieve the objective of
maximising the profits of the company that overall helps in increasing the growth of the
employees of the company.
According to Sohi, Bosch-Rekveldt, & Blom (2016) investor of the company this helps the
investor the company as the company would be able to achieve the objective of maximising
the profits. This would help the company to increase the performance due to which they
would also be able to get a higher return on the project that they undertake. This would also
use of lean undertaking management, the number one stakeholders will advantage more than
one alternative as lean mission control might make the consultancy examine diverse
approaches to do the challenge. Any other issue that can be seen is that the stakeholders will
fell a sense of feat due to the fact the services or products are added quick and is of high
excellent. For the inner stakeholders, it's far visible that in addition, they enjoy the technique
of lean mission control. As per Reusch & Reusch, (2013) one advantage is that the
consultancy might be able to deliver quicker and excellent offerings to its customers, thus
ensuring in extra profits for the employer. The based stakeholders will also gain from lean
undertaking management because the work might be completed on a brief basis in which the
team participants can without delay cost from it. This is seen that some of the benefits of
implementing lean project management in the company include the government, employees,
investors etc. The benefits that are arising through this includes the following:
To Government: Through this process, the government of the company can get information
about the company more transparent and can check that the information that is provided by
the company is ethical or not. This is seen that lean project management is helpful in
managing the substantial improvement in the project and also increases the efficiency of the
company through which the government can regulate the functioning. This also helps the
government to get information about whether the company is following lean project
management or not within the country.
To Employees of the company: As the management of the company introduces the lean
project management in the operations of the company the employees of the company get
benefited as the skills and the competencies of the employees increase. Through this process,
the employees of the company are able to improve the efficiency of the work that is done by
them. As the employees of the company get the training about the waste reduction they are
able to increase the performance of the company and are also able to achieve the objective of
maximising the profits of the company that overall helps in increasing the growth of the
employees of the company.
According to Sohi, Bosch-Rekveldt, & Blom (2016) investor of the company this helps the
investor the company as the company would be able to achieve the objective of maximising
the profits. This would help the company to increase the performance due to which they
would also be able to get a higher return on the project that they undertake. This would also

help the investor as the amount of money that they are investing in the company is giving
better results. Also, investors would get the confidence in the company as they will get to
know about the introduction of lean project management in the company.
Critical success factors
There are important achievement elements that want to collaborate with lean task control for
it to run efficiently inside the consultancy. One of the achievement elements is the strategic
alignment of the enterprise. Strategic alignment for implementing lean schooling challenge
control should be performed well so that the exchange that is going to take place within the
consultancy could be related to its structure. As per the views of Sunder, (2016) this desires
to be completed in order that the consultancy can plan for the long-term advantages of lean
project control. Another success factor is that the proper management of the tasks within
organisation. This wishes to be accomplished from the task graduation country to its final
stage in order that the end result may be a hit. Training is another success aspect that is
defined through the writer in their studies. The crew, that is working at the mission, need to
learn so that they have got the capabilities and know-how to perform that specific
undertaking. If right education is not furnished to them, then they may fail to deal with the
challenge with performance. Consistent with the techniques that show success elements that
want for use for first-rate lean challenge control. The alternative approach which became
visible designs for Six Sigma in which the consumer so that if a new product is made there
should be little to no issues when it is added into the market. The Six sigma used for lean
challenge implementation makes certain that the product which is produced meets the client’s
expectations. The six sigma method will also assist in enhancing the operational approaches
which are involved in the project. These success factors are considered as the best factor that
helps in increasing the performance of the company and also helps in the implementation of
lean project management in the company. These success factors are defined as follows:
Initiating: This is considered as the phase where the initial decision is taken by the
management of the company to undertake the project management. The managers of the
company must take the feasibility studies which helps them to define the cost analysis and
also helps in determining the viability of the project. It is seen that once the decision
regarding the implementation has been taken then it must be done by the company. Through
this, the signal of the existence of the project in the organisation is done and also helps to
commit the resource to deliver the project on time basis.
better results. Also, investors would get the confidence in the company as they will get to
know about the introduction of lean project management in the company.
Critical success factors
There are important achievement elements that want to collaborate with lean task control for
it to run efficiently inside the consultancy. One of the achievement elements is the strategic
alignment of the enterprise. Strategic alignment for implementing lean schooling challenge
control should be performed well so that the exchange that is going to take place within the
consultancy could be related to its structure. As per the views of Sunder, (2016) this desires
to be completed in order that the consultancy can plan for the long-term advantages of lean
project control. Another success factor is that the proper management of the tasks within
organisation. This wishes to be accomplished from the task graduation country to its final
stage in order that the end result may be a hit. Training is another success aspect that is
defined through the writer in their studies. The crew, that is working at the mission, need to
learn so that they have got the capabilities and know-how to perform that specific
undertaking. If right education is not furnished to them, then they may fail to deal with the
challenge with performance. Consistent with the techniques that show success elements that
want for use for first-rate lean challenge control. The alternative approach which became
visible designs for Six Sigma in which the consumer so that if a new product is made there
should be little to no issues when it is added into the market. The Six sigma used for lean
challenge implementation makes certain that the product which is produced meets the client’s
expectations. The six sigma method will also assist in enhancing the operational approaches
which are involved in the project. These success factors are considered as the best factor that
helps in increasing the performance of the company and also helps in the implementation of
lean project management in the company. These success factors are defined as follows:
Initiating: This is considered as the phase where the initial decision is taken by the
management of the company to undertake the project management. The managers of the
company must take the feasibility studies which helps them to define the cost analysis and
also helps in determining the viability of the project. It is seen that once the decision
regarding the implementation has been taken then it must be done by the company. Through
this, the signal of the existence of the project in the organisation is done and also helps to
commit the resource to deliver the project on time basis.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Planning: The Company has to analyse and plan according to the requirement where the
detailed plan is undertaken by the organisation for the completion of the project. The budget,
schedules, resource and the risk that are related to the project must be analysed by the
company. This step requires the management of the project manager which helps in involving
the subject matter and the experts. This is also seen that the subsidiary plans are also
integrated into the project management plan so that the project can be done efficiently if one
plan fails.
Executing: This is the process where the execution of the project is done by the company. It
specifies the project which has to be performed on a timely basis. Here the execution of the
project has to be done by the company so that they are able to achieve the objective of
completing the project on time without wasting the important resources. This is the phase
where the highest usage of the resource is done by the company which helps in registering the
most part of the cost of the project.
Monitoring and controlling: this is one of the factors that helps in monitoring the
implementation of lean project management in the company. It is seen that when the project
performance deviated from the plan the management of the company takes corrective action
for the same. Also, the where it is required the changes are made by the company so that
effective lean project management can be done in the company.
Ensuring Critical Success Factors and implementing Lean Project Management in
Employees mindset.
According to Sunder, (2016) there are numerous approaches in which lean undertaking
management can be positioned into the mindset of the employees which might be working
within the consultancy.
Through the process of Tilt control gadget it makes certain that the decisions of the
personnel are valued and are taken into consideration. Through the process of lean control
management the employees will start to achieve new abilities and advantage new
understanding about diverse projects. This could be helped for imposing the tilt challenge
control into the attitude of the employees because it will increase their improvement each
inside the organisation and employees itself.
detailed plan is undertaken by the organisation for the completion of the project. The budget,
schedules, resource and the risk that are related to the project must be analysed by the
company. This step requires the management of the project manager which helps in involving
the subject matter and the experts. This is also seen that the subsidiary plans are also
integrated into the project management plan so that the project can be done efficiently if one
plan fails.
Executing: This is the process where the execution of the project is done by the company. It
specifies the project which has to be performed on a timely basis. Here the execution of the
project has to be done by the company so that they are able to achieve the objective of
completing the project on time without wasting the important resources. This is the phase
where the highest usage of the resource is done by the company which helps in registering the
most part of the cost of the project.
Monitoring and controlling: this is one of the factors that helps in monitoring the
implementation of lean project management in the company. It is seen that when the project
performance deviated from the plan the management of the company takes corrective action
for the same. Also, the where it is required the changes are made by the company so that
effective lean project management can be done in the company.
Ensuring Critical Success Factors and implementing Lean Project Management in
Employees mindset.
According to Sunder, (2016) there are numerous approaches in which lean undertaking
management can be positioned into the mindset of the employees which might be working
within the consultancy.
Through the process of Tilt control gadget it makes certain that the decisions of the
personnel are valued and are taken into consideration. Through the process of lean control
management the employees will start to achieve new abilities and advantage new
understanding about diverse projects. This could be helped for imposing the tilt challenge
control into the attitude of the employees because it will increase their improvement each
inside the organisation and employees itself.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

It is also seen that the lean project control might also inspire the personnel to provide you
with new and modern ideas, this will inspire the employees to give new ideas under the lean
control mechanism.
By way of imposing lean control management into the techniques of the consultancy, the
performance of the employees will grow thus making them more satisfied. If the employees
are happy then they'll take delivery of the alternate of lean control into the system.
There are many steps that are concerned wherein it can be ensured that the fulfilment
elements are in an area with lean project management. This includes,
Management as one of the steps that may be used to ensure this method is working
efficiently. Management would ensure that each one of the success factors is being carried
out within the consultancy. Every other step could be to get comments from the employees
within the consultancy.
Training Requirement
Its miles essential that the employees of the consultancy have the know-how of lean
challenge management as a way to do their work as a consequence. As per Tan, (2011)
adoption of the tilt project control could require modifications to be made inside the shape of
the consultancy company so it might require the person to additionally make their
adjustments of their acting roles in keeping with. The orientation of the personnel is an
important factor in an effort to make sure that the personnel are working to their maximum
level. If the personnel of the consultancy are educated nicely then there might no longer be
trouble in schooling new employees that might arrive within the company. There are many
steps which might be worried about which it could be ensured that the fulfilment elements are
in an area with the lean project control. Leadership could ensure that all of the fulfilment
factors is being executed in the consultancy. Another step could be to get remarks from the
employees inside the consultancy. The company to perform the training of the employees of
the company needs to perform various objectives which include the prince2 tools. This is
considered as the projects in the controlled environment where the company has to perform
various functions. There are various tools that are available in the project which helps the
company to provide the training to the employees of the company and also helps the lack of
skills that needs to be corrected in the market. For this, the plan has been made which
includes all the department of the company where the plan can be implemented. These
include the following:
with new and modern ideas, this will inspire the employees to give new ideas under the lean
control mechanism.
By way of imposing lean control management into the techniques of the consultancy, the
performance of the employees will grow thus making them more satisfied. If the employees
are happy then they'll take delivery of the alternate of lean control into the system.
There are many steps that are concerned wherein it can be ensured that the fulfilment
elements are in an area with lean project management. This includes,
Management as one of the steps that may be used to ensure this method is working
efficiently. Management would ensure that each one of the success factors is being carried
out within the consultancy. Every other step could be to get comments from the employees
within the consultancy.
Training Requirement
Its miles essential that the employees of the consultancy have the know-how of lean
challenge management as a way to do their work as a consequence. As per Tan, (2011)
adoption of the tilt project control could require modifications to be made inside the shape of
the consultancy company so it might require the person to additionally make their
adjustments of their acting roles in keeping with. The orientation of the personnel is an
important factor in an effort to make sure that the personnel are working to their maximum
level. If the personnel of the consultancy are educated nicely then there might no longer be
trouble in schooling new employees that might arrive within the company. There are many
steps which might be worried about which it could be ensured that the fulfilment elements are
in an area with the lean project control. Leadership could ensure that all of the fulfilment
factors is being executed in the consultancy. Another step could be to get remarks from the
employees inside the consultancy. The company to perform the training of the employees of
the company needs to perform various objectives which include the prince2 tools. This is
considered as the projects in the controlled environment where the company has to perform
various functions. There are various tools that are available in the project which helps the
company to provide the training to the employees of the company and also helps the lack of
skills that needs to be corrected in the market. For this, the plan has been made which
includes all the department of the company where the plan can be implemented. These
include the following:

Department Gap Skills that would
be built through
this process
Time Training
tool &
strategies
Operations
department
The operation
department of the
company are not
able to complete
the job that is
assigned to them
on time due to
which they are
facing problem of
inefficiency.
This process
would help in
building time
management and
work management
among the
employees.
This would
require a time of
around 1 month
Through the
process of
seminars and
individual
assessment.
Accounts
department
The gap that has
been identified
here is that the
staff in the
accounting
department is not
ready for the using
the electronic
means of
accounting
The training
would help in
building skills
through which
they would be able
to do accounting
through the
electronic
medium.
The time that
would be
required for this
would be around
15 days.
Training
sessions,
Accounting
platforms
which
includes
Tally, ERP
and other
accounting
software’s.
Assessment
This is seen from the report that the company has considered the best method for
implementation of the lean project management for the company. It is considered that the
company has chosen the life cycle where the project team awareness is considered as one of
the main things for the company. Also agile method is used to determine the effectiveness of
the lean project management approach which is used by the company. Here the retrospectives
would be analysed where it would be seen that how well the activities had gone. Also the
company has defined the daily stand ups which helps in defining the commitments and
uncover the problems which helps in ensuring smooth work flow. Also SCRUM method for
be built through
this process
Time Training
tool &
strategies
Operations
department
The operation
department of the
company are not
able to complete
the job that is
assigned to them
on time due to
which they are
facing problem of
inefficiency.
This process
would help in
building time
management and
work management
among the
employees.
This would
require a time of
around 1 month
Through the
process of
seminars and
individual
assessment.
Accounts
department
The gap that has
been identified
here is that the
staff in the
accounting
department is not
ready for the using
the electronic
means of
accounting
The training
would help in
building skills
through which
they would be able
to do accounting
through the
electronic
medium.
The time that
would be
required for this
would be around
15 days.
Training
sessions,
Accounting
platforms
which
includes
Tally, ERP
and other
accounting
software’s.
Assessment
This is seen from the report that the company has considered the best method for
implementation of the lean project management for the company. It is considered that the
company has chosen the life cycle where the project team awareness is considered as one of
the main things for the company. Also agile method is used to determine the effectiveness of
the lean project management approach which is used by the company. Here the retrospectives
would be analysed where it would be seen that how well the activities had gone. Also the
company has defined the daily stand ups which helps in defining the commitments and
uncover the problems which helps in ensuring smooth work flow. Also SCRUM method for
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

analysing the effect of lean project management would be used as this helps in delivering the
projects on timely basis. This can be linked with the organisation as this would lead to
increase in the performance and efficiency of the organisation
The company has made the people aware of the plan that they are considering to implement.
The company has taken various analysis process at every step to implement lean project
management in the organisation. Also, the employees of the company are being aware of the
requirements of the resources for the completion of the work.
Conclusion
This is seen that the decision to implement lean project management is taken by the company
as they want to procure the government project. The company has to implement this from the
very starting phase of the company so that they are able to change the way of working of the
organisation. The company would also consider the factor such as the effect to the
stakeholders that would be generated through this process.
Yours sincerely
Director
projects on timely basis. This can be linked with the organisation as this would lead to
increase in the performance and efficiency of the organisation
The company has made the people aware of the plan that they are considering to implement.
The company has taken various analysis process at every step to implement lean project
management in the organisation. Also, the employees of the company are being aware of the
requirements of the resources for the completion of the work.
Conclusion
This is seen that the decision to implement lean project management is taken by the company
as they want to procure the government project. The company has to implement this from the
very starting phase of the company so that they are able to change the way of working of the
organisation. The company would also consider the factor such as the effect to the
stakeholders that would be generated through this process.
Yours sincerely
Director
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

References
Elias, A. A. (2016). Stakeholder analysis for Lean Six Sigma project
management. International Journal of Lean Six Sigma, 7(4), 394-405. DOI:
10.1108/IJLSS-11-2015-0046
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_scopus2-s2.0-
84992107953
Feldman, Jonathan. (2012). Project Management Gets Lean.
(Features). InformationWeek, 29.
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_gale_ofa27991
5167
Jalal Sohi, A., Hertogh, M.J.C.M., Bosch-Rekveldt, M.G.C., Blom, R., Serpell, A., &
Ferrada, X. (2016). Does Lean & Agile Project Management Help Coping with
Project Complexity? Proceedings of the 29th IPMA World Congress WC2015 (28-
30 September – 1 October, Panama), (28-30 September – 1 October, Panama),
Proceedings of the 29th IPMA World Congress WC2015 (28-30 September – 1
October, Panama), 2016, Issue 28-30 September – 1 October, Panama. DOI:
10.1016/j.sbspro.2016.06.186.
https://repository.tudelft.nl/islandora/object/uuid:7b234200-9da2-4b7e-b0a7-
d27062f5c26b?collection=research
Mahlck, H., & Maehlck, H. (2013). From Practice for Practice: Establishing Lean
Structures/Part 2: Simple visualization-based methods and tools for successful lean
management project work. Pharmazeutische Industrie, 75(3), 476-483 https://cqu-
primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_wos000317093800002
Reusch, P.J.A., & Reusch, P. (2013). Proceedings of the 2013 IEEE 7th International
Conference on Intelligent Data Acquisition and Advanced Computing Systems,
IDAACS 2013, 2, 547-550 DOI: 10.1109/IDAACS.2013.6662984.
https://ieeexplore-ieee-org.ezproxy.cqu.edu.au/document/6662984/
Sohi, Hertogh, Bosch-Rekveldt, & Blom. (2016). Does Lean & Agile Project Management
Help Coping with Project Complexity? Procedia - Social and Behavioral
Sciences, 226(C), 252-259. 10.1016/j.sbspro.2016.06.186 https://www-
Elias, A. A. (2016). Stakeholder analysis for Lean Six Sigma project
management. International Journal of Lean Six Sigma, 7(4), 394-405. DOI:
10.1108/IJLSS-11-2015-0046
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_scopus2-s2.0-
84992107953
Feldman, Jonathan. (2012). Project Management Gets Lean.
(Features). InformationWeek, 29.
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_gale_ofa27991
5167
Jalal Sohi, A., Hertogh, M.J.C.M., Bosch-Rekveldt, M.G.C., Blom, R., Serpell, A., &
Ferrada, X. (2016). Does Lean & Agile Project Management Help Coping with
Project Complexity? Proceedings of the 29th IPMA World Congress WC2015 (28-
30 September – 1 October, Panama), (28-30 September – 1 October, Panama),
Proceedings of the 29th IPMA World Congress WC2015 (28-30 September – 1
October, Panama), 2016, Issue 28-30 September – 1 October, Panama. DOI:
10.1016/j.sbspro.2016.06.186.
https://repository.tudelft.nl/islandora/object/uuid:7b234200-9da2-4b7e-b0a7-
d27062f5c26b?collection=research
Mahlck, H., & Maehlck, H. (2013). From Practice for Practice: Establishing Lean
Structures/Part 2: Simple visualization-based methods and tools for successful lean
management project work. Pharmazeutische Industrie, 75(3), 476-483 https://cqu-
primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_wos000317093800002
Reusch, P.J.A., & Reusch, P. (2013). Proceedings of the 2013 IEEE 7th International
Conference on Intelligent Data Acquisition and Advanced Computing Systems,
IDAACS 2013, 2, 547-550 DOI: 10.1109/IDAACS.2013.6662984.
https://ieeexplore-ieee-org.ezproxy.cqu.edu.au/document/6662984/
Sohi, Hertogh, Bosch-Rekveldt, & Blom. (2016). Does Lean & Agile Project Management
Help Coping with Project Complexity? Procedia - Social and Behavioral
Sciences, 226(C), 252-259. 10.1016/j.sbspro.2016.06.186 https://www-

sciencedirect-com.ezproxy.cqu.edu.au/search/advanced?docId=10.1016/
j.sbspro.2016.06.186
Sunder M., V. (2016). Lean six sigma project management a stakeholder management
perspective. The TQM Journal: The International Review of Organizational
Improvement, 28(1), 132-150.
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_gbv868290076
Sunder, V. M. (2016). Lean six sigma project management - A stakeholder management
perspective. TQM Journal, 28(1), 132-150. DOI: 10.1108/TQM-09-2014-0070
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_scopus2-s2.0-
84953291642
Tan, W. (2011). Managing Lean Projects: Understanding the Structures of Lean
Production. International Journal of Construction Management, 11(3), 67-78.
DOI: 10.1080/15623599.2011.10773173 https://cqu-
primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_tayfranc10.1080/1562359
9.2011.10773173
Tenera, & Pinto. (2014). A Lean Six Sigma (LSS) Project Management Improvement
Model. Procedia - Social and Behavioural Sciences, 119(C), 912-920.
DOI: 10.1016/j.sbspro.2014.03.102
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_sciversescience
direct_elsevierS1877-0428(14)02193-4
j.sbspro.2016.06.186
Sunder M., V. (2016). Lean six sigma project management a stakeholder management
perspective. The TQM Journal: The International Review of Organizational
Improvement, 28(1), 132-150.
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_gbv868290076
Sunder, V. M. (2016). Lean six sigma project management - A stakeholder management
perspective. TQM Journal, 28(1), 132-150. DOI: 10.1108/TQM-09-2014-0070
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_scopus2-s2.0-
84953291642
Tan, W. (2011). Managing Lean Projects: Understanding the Structures of Lean
Production. International Journal of Construction Management, 11(3), 67-78.
DOI: 10.1080/15623599.2011.10773173 https://cqu-
primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_tayfranc10.1080/1562359
9.2011.10773173
Tenera, & Pinto. (2014). A Lean Six Sigma (LSS) Project Management Improvement
Model. Procedia - Social and Behavioural Sciences, 119(C), 912-920.
DOI: 10.1016/j.sbspro.2014.03.102
https://cqu-primo.hosted.exlibrisgroup.com/permalink/f/1rb43gr/TN_sciversescience
direct_elsevierS1877-0428(14)02193-4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 12
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.