Comprehensive Lean Six Sigma Analysis of Riverside Mint Sweets

Verified

Added on  2023/04/24

|21
|4136
|272
Report
AI Summary
This report presents a Lean Six Sigma analysis of Riverside Mint Sweets Factory, which is facing significant losses due to production inefficiencies and product defects. The analysis identifies the sources of these defects, including issues in the composition, design, and packaging of the sweets. The report uses a SIPOC diagram to illustrate the supply chain and a Pareto analysis to prioritize defect types. It calculates the Defects Per Million Opportunities (DPMO) and determines the company's sigma level, revealing its non-competitive position. The analysis includes sample data from two production lines, highlighting variations in packaging accuracy. Ultimately, the report aims to provide actionable insights for improving the production process, reducing defects, and enhancing the company's competitiveness. Desklib is a valuable resource for students seeking similar solved assignments and study materials.
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 1
Lean Six Sigma Analysis: Riverside Mint Sweets Factory
Your Name
Date
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 2
Introduction
Lean six sigma analysis tends to analyze the supply chain as well as the processes that the
company undertakes to achieve production and profits. The objective of the analysis is to
identify the potential phases where the company is incurring the greatest losses. A second key
aspect that lean six sigma seeks to identify in a process is the source of defects on the final
project (Albliwi et al., 2015, pp. 667). Defects reduce the overall market and competitive
viability of a given product. Based on the viability analysis, the six levels of six sigma are
designed to differentiate between a competitive company and a non-competitive company.
Therefore, the context of the lean six sigma analysis carries high significance to a company
(Arnheiterand Maleyeff, 2005, pp. 6).
Business Case
Riverside Mint Sweets Factory specializes in the production of bagged confectionaries.
The main selling point of the sweets is the nostalgic concept they bring to the consumers. The
demand that the company is handling is at one thousand boxes of the confectionaries per day.
However, the company is undertaking huge losses totaling to ten thousand euros a year. The
losses come from the issues in production stemming from the composition, design and packaging
of the sweets prior to reaching the final consumer. The numerous sources of waste as defects in
the manufacturing process means that the company is not able to maintain a healthy competition
in the industry. In addition, the company has lost two of its most important consumers because of
the continued defects in production. Business-wise, the company is failing at an alarming rate
especially because it is starting to accrue a negative reputation in the industry. A poor reputation
would be a difficult aspect to handle considering that the company is already losing substantial
market share.
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 3
The main defined problems that Riverside is experiencing are; the inability to meet its
production schedules, a high rework rates and the machine downtime. These are manifestations
of the errors in the production process as well as the product defects (Khan et al., 2011). For
example, one of the company’s chief consumers returned an entire consignment because a few of
the sampled sweets were defective. Returned consignments require rework or scrapping which
cause the company to lose more time and incur extra costs on the production process. Machine
down times are caused mainly why the packaging process results in breakage of the sweets and
the debris ends up in the machine gears and crevices. The result is that the company will need to
slow down production in order to clean out the machines.
Problem Statement
Riverside Mint Sweet Factory is incurring high losses through its production process that
is leading to errors in production. The errors in production lead to defects of the packaged sweets
which is affecting consumer confidence in the company. The company is also losing £10,000
every year based on the propagated errors and loss of consumers. Therefore, there is need to
address the problem that Riverside Mint Sweet Factory is facing for the sake of the company. It
is unwise to precede the continued decline of the company especially now that the company is
losing out on its market share.
Objective Statements
The objectives are;
To identify the sources of defects in the sweets.
To analyze possible solution to the production errors and leading to the defects.
To analyze possible solutions to the sources of losses that the company is
undertaking.
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 4
To investigate possible changes to the production process for better value
addition.
The information presented on the types of defects provide a starting point for the analysis
to take place. The defects arise from different points in the production process meaning that there
will be an analysis on the actual sources of the defects in a bid to solve their occurrences (De
Mast, and Lokkerbol 2012, pp. 604).
SIPOC
The SIPOC diagram elaborates on the supply chain from the supplier to the consumer. It
helps in envisioning the overall processes that a company undertakes to complete production
(Furterer, 2016)(Mishra and Kumar Sharma, 2014, pp. 522). The above SIPOC diagram shows
Riverside Mint Sweets Factory’s supply chain and the processes involved in production.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 5
Pareto Analysis
Graph 2: Pareto Charts on Defects
There are six types of defects identified by the company namely; too many sweets, too
few sweets, broken sweets, wrapping faults, inadequately sealed bags and missing nutritional
information on the wrappers.
Y = F (X) + E Variables
Y variable
The Y variable is the output of the company which are packaged sweets. The packaged
sweets will need to have high quality in order to satisfy the consumers. However, they are
subject to the process of production, the quality of the input and the mitigation of errors and
defects within the production.
X Variables
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 6
The X variables represent the input for the entire production to be possible. The input for
Riverside Mint Sweet Factory therefore is the sugar and ingredients. Secondly, there are
employees working at the company totaling to 200 whom also form an essential part of the input.
The third input in the system is the capital used to run the company so that all machines and
employees are working in unison.
F Process
F in the equation translates to the process of production through which the resources of
production are manipulated to produce the product (Evans, and Lindsay, 2014). In this case, the
process of production is the stirring of ingredients, then the melting process, distribution of
droplets of the mixture on the conveyor belt, cooling and solidifying of the mixture in to pellets
of sweets. The next process is usually the wrapping of the sweets in plastic film followed by
packaging in to packets and finally in to boxes ready for shipment.
E Variables
E variables refer to the errors in the process of factors influencing errors in the production
process. In Riverside’s process, the E variables are; machine downtime, defects, human error,
time wastage, reworking cost. Errors in prior processes are propagated in to the next process
hence, the final product will have defects thus reducing the company’s overall yield. The six-
sigma analysis attempts to address the errors and the reason for their occurrences. The aim of the
analysis is to have the company move to a better level of efficiency.
Value Stream
The value stream for the current production process is as shown in figure 1. It is
impossible to identify defects until the sweets are being readied for distribution. Therefore,
Riverside Mint Sweets Factory has no means of rectifying defects until it is too late. Such
production process is full of inefficiencies especially when considering that the defects
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 7
consumers are more worried about are those that cannot be detected by simple human vision
(Munro et al., 2015).
Sample Analysis
Sample analysis differentiated the two production lines with the aim of identifying the
production line with the greatest flaws. It allows the company to identify the machine that is
having a poor productivity and producing the high number of defects in the overall system.
Samples from Production line A were taken and analyzed using descriptive statistics. The mean
packaging is 102.2333 meaning that in production line A, there are more sweets packaged and
mode of the packets showed 103 sweets as the mode. The least packaged bag in production line
A was 98 which is within the standard laws allowing at least 98 sweets in a bag indicating 100
sweets inside. the highest packaged bag in line A was 106 and overall, the 30 bags contained
3067 sweets which is within the necessary range as required by law.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 8
Table 1: Production Line A Analysis
Production Line A
Mean 102.2333
Standard Error 0.3735
Median 103
Mode 103
Standard Deviation 2.045741
Sample Variance 4.185057
Kurtosis -0.64902
Skewness -0.36394
Range 8
Minimum 98
Maximum 106
Sum 3067
Count 30
Sampling on Production line B indicated that the mean was 99.26667. this means that the
bags are under packed but still within the 98-minimum set by law. the range was however wide
since the least packaged bag was 95 and the highest packaged bag was the 103. Overall, the
sample had 2978 sweets which is still within the minimum set by law.
Table 2: Production Line B Analysis
Production Line B
Mean 99.26667
Standard Error 0.371184
Median 99
Mode 99
Standard Deviation 2.03306
Sample Variance 4.133333
Kurtosis -0.50215
Skewness -0.30979
Range 8
Minimum 95
Maximum 103
Sum 2978
Count 30
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 9
Analyzing the two production lines together shows that the mean of the packaged sweets
is 100.75. this means that overall, more sweets are packaged as compared to the other rules of the
game. However, there is a huge gap between the minimum and the maximum which is eleven
sweets. The sampling shows that packaging in terms of number of sweets is not a big problem as
one would have expected. However, the problems combine to form 71 % of the overall problems
with the system. Riverside factory needs to find the means of eliminating the defects with
regards to the overall number of sweets that the company is packaging as well as the means the
company could be working to reduce the defects based on the number of sweets per package.
Table 3: Combined Production Lines A and B Analysis
Combined Lines A and B
Mean 100.75
Standard Error 0.324712
Median 101
Mode 99
Standard Deviation 2.515208
Sample Variance 6.326271
Kurtosis -0.51232
Skewness -0.16322
Range 11
Minimum 95
Maximum 106
Sum 6045
Count 60
DPMO
Calculations of the DPMO (Defects Per Million Opportunities) shows a probability of
errors to occur should Riverside produce one million sweets (Näslund, 2008, pp. 269). A sample
of 100 packaged sweets was taken and the defective sweets counted. The overall count of defects
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 10
was 26 in 100 representing a twenty-six percent defect ratio. This meant that in all production,
the probability of Riverside making a defective sweet is 26%. Using the information, the DPMO
is extrapolated by multiplying by 1,000,000. The calculations follow the following formula.
DPMO= ( Total Number of Defects )
Total Number of Opportunities1,000,000 (Equation 1)
From the DPMO, it is possible to calculate the six-sigma level of the company which is
thus used to determine the overall competitiveness of the company. Defects need to be as low as
possible for a company to remain competitive
The 26% defects per one hundred opportunities means that the company is likely to make
260000 defective sweets in one million opportunities. This translates to two sigma level in terms
of competitiveness which shows that the company is performing poorly. Riverside is thus rated
as noncompetitive in the industry owing to the high forms of waste that the company is incurring
in its production process.
Table 4: DPMO ANALYSIS and SIX SIGMA LEVEL
Defects
Wrapping Faults 2
Broken Sweets 3
Too few sweets 8
Too many sweets 10
Inadequately sealed bags 2
Missing Nutritional Information 1
26
Total Sample Size 100
DPO 0.26
DPMO 260000
Sigma Level 2.143345405
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 11
Yield and Take Time
From the DPMO analysis, the yield is seen to be 74% considering that 26% is defective.
The takt time combines the entire time that the process undertakes from the time of mixing to the
complete packaging phase. the following diagram shows the take time analysis.
Time Begins=9 :00 amTime closing=5 :00 pmTotal hours=8 hrs=480 mins
Break=1hr lunchbreak +30 mins breaks total break=1 hr 30 mins=90 mins
total working time=48090=390 mins=23400 secsCustomer demand=1000
Takt time= 23400
1000 =23.4 seconds per box
Analysis
Another key important consideration between the production processes was the weight of
the sweets and the fill capacity. The company needed to understand how the weight variation
contributes to the overall fill errors in the packaging process. There are a total of two samples
taken and the correlation between the two variables is tested using the regression analysis. The
R-square of the analysis is indicated as 0.61 which shows that there is a correlation between the
weight and fill frequency. However, it is difficult to identify a cause and effect based on the
given information hence, more analysis is needed on the two variables.
Table 5: Regression Analysis between Weight and Fill frequency.
SUMMARY OUTPUT
Regression Statistics
Multiple R 0.785471
R Square 0.616965
Adjusted R Square 0.595686
Standard Error 0.137334
Observations 20
Document Page
Lean Six Sigma Analysis: Riverside Mint Sweets Factory 12
Graph 2: Weight vs. Fill
4.4 4.5 4.6 4.7 4.8 4.9 5 5.1 5.2 5.3 5.4
92
94
96
98
100
102
104
106
Weight vs. Fill
Weight
Fill Frequency
The second regression analysis was done on the speed of the machine and the fill
frequency. The speed refers to the speed of wrapping and collecting in to one package. From the
sample collected, the R square value is at 0.013864. Based on the information, it is clear that
there is minimal correlation between speed and the fill frequency. This implies that the overall
fill frequency is not influenced by the marginal changes in the speed of the machine. However,
there is still correlation present this meaning that the company may have to standardize its
operation speed so that the overall speed of the components is not influencing the fill frequency
but influencing a steady fill frequency.
Table 6: Regression Analysis between Speed vs. Fill
Regression Statistics
Multiple R 0.117746
R Square 0.013864
chevron_up_icon
1 out of 21
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]